FF BuildersFF Builders
Rebuilt accessible commercial restroom with grab bars and a roll-under sink
Restrooms · Ramps · Entrances · Doors · Permits

ADA accessibility upgrades
in Miami.

Restrooms, ramps, entrances and the path between them. We rebuild them for the people who use them, to what the applicable accessibility code and the permit require.

Google5.0★★★★★Licensed & insuredPermits includedWritten estimate

Book your in-home visit

Free, no obligation. You don't need to have it all figured out before booking.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

5.0 ★★★★★ on GoogleLicensed Florida GCInsured every jobFirm written price

How it works

From the parking to the restroom.

Accessibility is a route, not a room. The visit follows the path a visitor takes, from the parking and the entrance to the counter and the restroom.

  1. You reach outForm or call. We call back to book a free visit, evenings and Saturdays included.
  2. We walk the routeFrom the parking and the entrance to the restrooms, with any report you already have.
  3. You get the estimate in writing, within 24 hoursItem by item, with drawings, permits and a schedule that keeps you open.
  4. You decideRead it, compare it, call when you are ready. Nothing starts before you sign.

What we build

The route, rebuilt.

Restrooms

Rebuilt with grab bars, fixtures and clear space.

Ramps and walks

Formed, poured and finished, with handrails.

Entrances

Thresholds, landings and entry doors.

Interior doors

Widened openings and new hardware.

Counters

Lowered sections at sales and service counters.

Routes inside

Walls moved and floors leveled along the path.

Concrete ramp being formed and finished at a commercial entrance while a handrail post is set

How accessibility upgrades work

Drawn, built,
inspected.

The scope starts from what you have: a report from an accessibility specialist, a designer's drawings or a walk of the property with us. That becomes the list of work.

Drawings are prepared or reviewed and the permit is submitted. Plan review looks at the design before construction starts.

Work runs area by area so the business stays open: one restroom at a time, a temporary entrance while a ramp is poured, doors replaced in a single day.

Inspections check the work as it is built. The permit is closed and the areas are handed back clean and ready to use.

What's in the price

Built to the drawings,
checked at inspection.

Construction, permits and inspections in one contract.

  • Scope from your report — or from a walk of the property
  • Drawings — prepared or reviewed before the permit
  • Restrooms and ramps — rebuilt to the drawings
  • Doors and counters — widened, lowered, rehung
  • Phased work — so the business stays open
  • Permits — plan review, inspections and closeout

The part that separates accessibility contractors

The grab bar was installed.
The room still did not work.

Accessibility lives in the details: clear space, door swing, heights, slopes and the path between them. Built from drawings and checked at inspection, the details are not left to guesswork.

Homeowners

Rated 5.0 on Google.

5.0
★★★★★
Google rating · every review, five stars
Google
K Kelsey BarbosaGoogle review Google
★★★★★

We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.

S Sasha AbouGoogle review Google
★★★★★

Extremely professional company and very dedicated to their clients! Their work was impeccable and I was very pleased with their services!

G Gabriel BarbosaGoogle review Google
★★★★★

The work they did on our house was fantastic. The crew was efficient with their time and courteous with coming in and out of our home. I will recommend them to all my friends and family! Honest and great people to work with.

S sara bouGoogle review · Local Guide Google
★★★★★

Best service ever! They take care of every detail! Always on time, everything came up as I wanted. Thank you!

D deborah medel-gimenezGoogle review Google
★★★★★

The absolute best! Would definitely recommend 100%!!

M Monica BecharaGoogle review · Local Guide Google
★★★★★

They are the best! Everything was perfect. Super responsible, reliable and always on time. I recommend them 100%.

Google Business Profile rating recorded September 14, 2026. Read them on Google.

Before you build

Accessibility upgrades: what property owners ask

What do accessibility upgrades usually include?

Most projects focus on the places visitors use: the parking and the walk to the entrance, the entrance itself, the doors along the way, service counters and the restrooms. The work can be as small as new door hardware and a lowered counter section or as large as rebuilding a restroom core and pouring a new ramp. The scope depends on the building and on what the drawings, the permit and the applicable accessibility code call for in that property.

Where does the scope come from?

There are three common starting points. Some owners already have a report from an accessibility specialist that lists items to address, and that report can become the scope. Some have a designer or architect preparing drawings. Others start with a walk of the property with us to see what is there. In every case, the work that is built follows written scope and drawings, reviewed in plan review and checked at inspection.

Can you work from an accessibility specialist's report?

Yes. A report usually lists conditions by location, and each item can be priced on its own. The estimate follows the report's structure, so you can see what each item costs and decide the order. Some items need drawings and a permit, others are simpler work. Where the report leaves a choice open, we raise it with you and your specialist before building instead of guessing. Completed items can be documented with photos for your records.

Does an accessible restroom need a full rebuild?

Not always. Sometimes the room has enough space and the work is fixtures, grab bars, a roll-under sink, accessories, a door and hardware. Often the room is too small, and walls have to move, the door has to be relocated and plumbing has to be reworked. That is a rebuild. The visit looks at the space and the walls around it, and the estimate shows which approach the room needs.

Can you build ramps and fix entrances?

Yes. Ramps are formed, poured and finished in concrete, with handrails, landings and transitions to the walk and the door. Entrances may need a leveled threshold, a new landing or a new door with the right hardware and closer. Exterior work usually needs a permit and sometimes approval from the landlord or the association. During the work, a temporary route is planned so the business keeps a usable entrance. Fresh concrete is protected until it can be used.

Will the work be inspected?

Yes, when it is permitted work. Plan review looks at the drawings before construction, and inspections check the work as it is built. We build to what the drawings, the applicable accessibility code and the permit require, schedule the inspections and close the permit. Accessibility is about how real people use a building, so we treat the inspection as a check on the work, not the goal of it. Where the drawings leave a detail open, it is settled before building.

Can the business stay open during the work?

In most cases. Restrooms are done one at a time, so one stays available. Ramps and entrances are built with a temporary route and clear signs. Doors can often be replaced in a single day. Loud work and deliveries are scheduled around your hours. The plan is agreed with you before work starts, so customers and staff know what to expect. Work areas are closed off, kept clean and opened again only when they are safe to use.

Can accessibility upgrades be part of a larger renovation?

Yes, and that is often the best time. When a space is being built out or renovated, the permit review usually looks at accessibility along the route, and changes are easier while walls and floors are already open. If you are planning a renovation, it makes sense to look at restrooms, doors and entrances at the same time instead of returning to them later. One permit, one schedule and one crew cost less than two separate projects.

What drives the cost?

Whether restrooms need new fixtures or a full rebuild, how far plumbing has to move, the length and height of any ramp, the number of doors, exterior concrete work and the condition of what is uncovered. Drawings and permits are part of the cost. The estimate is itemized by area or by report item, so you can phase the work and see what each part costs. Hidden conditions found during demolition are shown to you before extra work is done.

How long do accessibility upgrades take?

It depends on the scope, the drawings and the permit review. Door hardware and counter changes can be quick. A restroom rebuild or a new ramp takes longer, especially with permits and inspections. The estimate includes a schedule that shows design, permit, construction and inspections, and how the work will be phased around your business. If you have a date to meet, from a landlord, a report or a planned renovation, the schedule is built backward from it so you can see what has to start first.

Is this for tenants or for property owners?

Both. Owners often handle common areas, entrances, parking and shared restrooms. Tenants often handle the inside of their own space during a build-out. Who is responsible for what is set by your lease, so that is a question for you, your landlord and your attorney. We price and build the scope you are responsible for and coordinate access with the building. When owner and tenant both have work, it can be scheduled together.

Before you hire anyone

The ones people actually ask.

Do you do accessibility upgrades for commercial properties?

Yes. Restrooms, ramps, entrances, doors and routes in Miami-Dade and Broward.

Can you work from an accessibility specialist's report?

Yes. Each item is priced and scheduled on its own.

Can you rebuild an accessible restroom?

Yes. Fixtures, grab bars, walls, doors and plumbing as the drawings require.

Do you build concrete ramps?

Yes. Formed, poured and finished, with handrails.

Is the work permitted and inspected?

Yes. Plan review, inspections and permit closeout.

Can we stay open during the work?

In most cases, yes. Work is phased area by area.

Can this be part of a bigger renovation?

Yes. It is often the best time to do it.

Are you licensed and insured?

Yes. FF Builders is a Florida Certified General Contractor, licensed and insured.

One contractor

The whole project, one contractor.

FF Builders is a Florida Certified General Contractor working across Miami-Dade and Broward. Design, structure, systems and finishes are one company, one contract and one person on the phone from the first visit to the final inspection.

Commercial build-out · Medical office build-out · Restaurant build-out · Office build-out · Concrete contractor

Free in-home visit

Your property, easier to use for everyone.

Tell us roughly what you're thinking. We come out, measure, and leave you with a real number. No obligation, and no decision required before you book.

  • A firm written price — material, labor, removal and haul-away.
  • Licensed & insured Florida crews — on every single job.
  • We call you back fast — during business hours, same or next day.

Book your in-home visit

Free, no obligation. Decide after you see the numbers.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

Mon–Fri, 8am–6pm ET · Serving Miami-Dade & Broward.