FF BuildersFF Builders
Room addition under construction on a Miami home
Rooms · Second story · Master suites · Garage conversions

Home additions
in South Florida.

Square footage that was never there, tied into the house so nobody can point to where the old part ended. Zoning checked first, permits under our license, and the price in writing within 24 hours.

Google5.0★★★★★Licensed & insuredPriced at your houseWritten estimate

Book your in-home visit

Free, no obligation. You don't need to have it all figured out before booking.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

5.0 ★★★★★ on GoogleLicensed Florida GCInsured every jobFirm written price

How it works

First we find out what your lot allows. That is free.

Setbacks, lot coverage and flood elevation can each kill an addition or move it to another side of the house. Finding that out in week one costs a conversation. Finding it out after the drawings costs the drawings.

  1. You reach outForm or call. We call you back to book a free visit at a time that works, evenings and Saturdays included.
  2. We check the lotSetbacks, lot coverage and flood elevation against your legal description. If what you want does not fit, you hear it here.
  3. You get the estimate in writing, within 24 hoursOne number, with the scope written out line by line so you can compare it against anyone else's.
  4. You decide, not the salesmanNo pressure in your living room. Read it, think about it, call when you are ready.

What we build

Every addition we take on.

Room addition

Bedroom, office or family room added to the footprint. Footings, walls, roof tie-in, impact glass and full interior finish.

Master suite

Bedroom, bath and closet, which means new plumbing and a waste line tied into the existing system.

Second story

Above the existing slab, after an engineer confirms what is already carrying the house.

Garage conversion

Floor raised to living elevation, impact glass where the door was, HVAC extended and insulation to code.

Enclosing a patio

The cheapest square footage there is, because the roof and slab already exist.

Layout changes

Sometimes the answer is not more house, it is a different arrangement of the house you have.

Footing excavated and formed for an addition in Miami-Dade

Below grade

Most of the budget goes
where you will never look.

New footings carry new load. The roof has to shed water into the old roof without a seam that holds it. The slab has to meet the existing slab at the same elevation, or you feel the step every time you walk through the opening.

That is not padding, it is the difference between an addition that reads as original construction and one that announces itself with a crack across the tie-in after the first heavy season.

What's in the price

Drawings, permit
and the whole build.

One contract from the first measurement to the final inspection. No handing you off to an architect and wishing you luck.

  • Feasibility — setbacks, coverage and flood elevation checked first
  • Drawings — architectural plus sealed structural engineering
  • Permit — submitted, comments answered, issued under our license
  • Foundation — footings, steel and slab, inspected in stages
  • Shell and roof — walls, tie beam, trusses and dry-in
  • Impact glass — windows and doors to High Velocity Hurricane Zone requirements
  • Rough trades — electrical, plumbing and mechanical, each inspected
  • Finish — insulation, drywall, floors, paint and trim to completion

The part that separates builders

The permit is longer than the framing.

People budget for construction and are blindsided by review. In most Miami-Dade jurisdictions the permit stretch is measured in months, and it is the part nobody can speed up. A contractor who does not show it as its own line is selling you a schedule that will not survive.

Homeowners

Rated 5.0 on Google.

5.0
★★★★★
Google rating · every review, five stars
Google
K Kelsey BarbosaGoogle review Google
★★★★★

We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.

S Sasha AbouGoogle review Google
★★★★★

Extremely professional company and very dedicated to their clients! Their work was impeccable and I was very pleased with their services!

G Gabriel BarbosaGoogle review Google
★★★★★

The work they did on our house was fantastic. The crew was efficient with their time and courteous with coming in and out of our home. I will recommend them to all my friends and family! Honest and great people to work with.

S sara bouGoogle review · Local Guide Google
★★★★★

Best service ever! They take care of every detail! Always on time, everything came up as I wanted. Thank you!

D deborah medel-gimenezGoogle review Google
★★★★★

The absolute best! Would definitely recommend 100%!!

M Monica BecharaGoogle review · Local Guide Google
★★★★★

They are the best! Everything was perfect. Super responsible, reliable and always on time. I recommend them 100%.

Google Business Profile rating recorded September 14, 2026. Read them on Google.

Before you hire anyone

The ones people actually ask.

How much does a home addition cost in Miami?

Three things move it most: how far the new waste line has to run to reach the existing one, whether the roof is truss or stick built, and what flood elevation forces your finished floor to be. We check all three before quoting, and the price we give you is the one on the contract.

How long does it take?

Construction is rarely the long part. Design and engineering run weeks, permit review runs months in most jurisdictions, then construction. We give you a schedule with the permit window shown separately.

Do I need a permit?

Always, for any addition of conditioned space. Without one the square footage never appears on your property record, which becomes a problem the day you sell or refinance.

Can I add a second story to a slab house?

Sometimes. It depends what the existing walls and footings were built to carry, which an engineer determines by inspection. Many South Florida houses need new columns down to new footings first.

Do you handle the architect and engineer?

Yes. Drawings, structural engineering, permit submittal and inspections are all in the contract. One company from first measurement to final inspection.

One licensed contractor

The whole house, one contractor, one crew.

FF Builders is a Florida Certified General Contractor, not a single-trade shop with an installer list. Floors, kitchens, bathrooms, paint and carpentry are the same crew, under the same contract, with one person answering the phone from the first visit to the last inspection.

See our work

Free in-home visit

Find out what
your lot allows.

Tell us roughly what you're thinking. We come out, measure, and leave you with a real number. No obligation, and no decision required before you book.

  • A firm written price — material, labor, removal and haul-away.
  • Licensed & insured Florida crews — on every single job.
  • We call you back fast — during business hours, same or next day.

Book your in-home visit

Free, no obligation. Decide after you see the numbers.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

Mon–Fri, 8am–6pm ET · Serving Miami-Dade & Broward.