FF BuildersFF Builders
New auto repair shop with an epoxy floor, roll-up doors and a waiting room behind glass
Weston · Bays · Waiting rooms

Auto shop build-out
in Weston.

Weston families run more than one car, and they want them serviced close to home. We turn flex and warehouse units on Commerce Parkway and in the commercial plazas into working shops with a clean front, and price it in writing within 24 hours.

Google5.0★★★★★Licensed & insuredPermits includedWritten estimate

Book your in-home visit

Free, no obligation. You don't need to have it all figured out before booking.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

5.0 ★★★★★ on GoogleLicensed Florida GCInsured every jobFirm written price

How it works

A flex unit has the height.
The rest is built.

The spaces that can work as a shop in Weston are mostly flex and warehouse units: a high ceiling, a roll-up door, a small office in front and a slab that was poured for storage. That is a good start for bays. The visit checks what the unit has against what a shop needs, and whether the use fits the property. Check with the City on the use before you sign.

  1. You reach outForm or call. We call back to book a free visit, evenings and Saturdays included.
  2. We walk the unit with your bay planThe slab, doors, drainage, ventilation, power, the office in front and where the lifts will go.
  3. You get the estimate in writing, within 24 hoursArea by area, with floors, openings, the separation wall, the waiting room and the permit.
  4. You decideRead it, compare it, call when you are ready. Nothing starts before you sign.

What we build in Weston

A working shop
and a clean front.

Bay floors

Concrete repaired, leveled and sloped where needed, with a coating that takes oil and traffic.

Openings for roll-up doors

Openings framed and reinforced for the wind-rated doors you choose.

Separation wall

Between bays and the customer side, insulated and sealed against noise and fumes.

Waiting room

Seating, a coffee counter, a restroom and glass to see the car if you want it.

Service desk and office

Where the customer checks in, pays and picks up the keys.

Accessibility

Entrances, routes and restrooms brought up to what the inspection asks for.

Crew rolling epoxy coating on the concrete floor of a repair bay

What Weston adds

Built for storage,
rebuilt for lifts.

A slab poured for shelving and pallets is not always ready for a lift. Lifts put their load on a few points, so the slab is checked where each one will stand, and where it falls short it is cut out and poured again before anything is anchored. The rest of the floor is repaired, leveled and coated so oil and coolant wipe up instead of soaking in, and drainage is planned with the floor, not after it.

The front of the unit is where a Weston customer judges the shop. Many of them drop the car off on the way to work or school and come back for it later, and the ones who wait want a room that is cool, quiet and clean. The wall between the bays and that room is insulated and sealed against noise and fumes, with a door that closes on its own and glass only where you want the customer to see the car.

Weston is inland, so hurricane season here is about wind. The roll-up openings are the largest openings in the building, and they are framed and reinforced for the wind-rated doors you choose. Ventilation and power for the lifts and tools are planned with it. The landlord sets what can change outside, and the City of Weston permit covers the build.

What's in the price

Ready to open the bays,
ready to seat the customer.

A shop has two jobs under one roof. The estimate prices both.

  • Slab check — at every lift location before anything is anchored
  • Bay floors — repaired, leveled and coated
  • Framed openings — for the roll-up doors you choose
  • Separation wall — sealed against noise and fumes
  • Power for the shop — lifts, compressor and tools
  • Permits and inspections — pulled, inspected and closed before opening

What separates shop builders here

The lift is only as good
as the slab under it.

A contractor who coats the floor and bolts down the lifts on a slab poured for storage is guessing. Here the slab is checked at each lift before the estimate, and the customer side is priced as carefully as the bays.

Homeowners

Rated 5.0 on Google.

5.0
★★★★★
Google rating · every review, five stars
Google
K Kelsey BarbosaGoogle review Google
★★★★★

We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.

S Sasha AbouGoogle review Google
★★★★★

Extremely professional company and very dedicated to their clients! Their work was impeccable and I was very pleased with their services!

G Gabriel BarbosaGoogle review Google
★★★★★

The work they did on our house was fantastic. The crew was efficient with their time and courteous with coming in and out of our home. I will recommend them to all my friends and family! Honest and great people to work with.

S sara bouGoogle review · Local Guide Google
★★★★★

Best service ever! They take care of every detail! Always on time, everything came up as I wanted. Thank you!

D deborah medel-gimenezGoogle review Google
★★★★★

The absolute best! Would definitely recommend 100%!!

M Monica BecharaGoogle review · Local Guide Google
★★★★★

They are the best! Everything was perfect. Super responsible, reliable and always on time. I recommend them 100%.

Google Business Profile rating recorded September 14, 2026. Read them on Google.

Before you hire anyone

The ones people actually ask.

Can an auto shop go in a flex unit in Weston?

It depends on the property and the use allowed there. Check with the City on the use and with the landlord on the lease. The visit checks the building itself: the slab, the doors, ventilation and power, so you know what the build involves before you sign.

Who supplies the lifts and equipment?

Your supplier; we build the space ready for it. Lifts, compressors and diagnostic equipment come from your vendors, and we prepare the slab, power and openings their specs call for.

Can the floor handle oil and heavy traffic?

Yes. The concrete is repaired and leveled first, then coated with a finish that resists oil, coolant and tire traffic and cleans easily.

Can you renovate while the shop stays open?

Often, yes. One bay or one area at a time, with the work closed off, so the other bays keep working.

How much does an auto shop build-out cost?

It depends on the size, the condition of the slab, the number of bays and the customer side. You get a written estimate within 24 hours of the visit.

Are you licensed and insured?

Yes. FF Builders is a Florida Certified General Contractor, licensed and insured.

More in Weston

One contractor for the whole house.

FF Builders is a Florida Certified General Contractor working across Weston, from the homes on the lakes to the condos in Bonaventure and the offices on Commerce Parkway. Kitchens, baths, impact glass, additions and build-outs are the same company, with one person answering the phone from the first visit to the final inspection.

Auto shop build-out · General contractor in Weston · Warehouse renovation in Weston · Commercial build-out in Weston · Concrete contractor in Weston

Free in-home visit

Your shop, built for Weston drivers.

Tell us roughly what you're thinking. We come out, measure, and leave you with a real number. No obligation, and no decision required before you book.

  • A firm written price — material, labor, removal and haul-away.
  • Licensed & insured Florida crews — on every single job.
  • We call you back fast — during business hours, same or next day.

Book your in-home visit

Free, no obligation. Decide after you see the numbers.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

Mon–Fri, 8am–6pm ET · Serving Miami-Dade & Broward.