We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.

On the Mile, the balconies on the ocean side take the wind and the salt straight off the water, and the first place it shows is where the railing meets the concrete. We start there, put the estimate in writing within 24 hours, and replace balcony by balcony.
We got your request and will call to set the visit (Mon–Fri, 8am–6pm ET).
How it works
The top rail is what people touch, but the problem is usually below it. Salt water runs down the posts, sits in the cores, and works into the concrete around them. Rust stains under a post, a hairline crack at the slab edge, a post that moves under a hand: those are the signs. The survey looks at the anchors on each balcony before anyone talks about the new railing.
What we replace on the Mile
Finished for a marine setting, sized to code and to the building's look.
Laminated glass panels in a frame that takes the ocean wind.
Damaged concrete around each post removed and rebuilt.
Edges restored where corrosion has cracked them.
A coating so water stops reaching the anchors.
One railing design from the lowest balcony to the top.

What is different on the Mile
The east face of a tower on the sand has nothing between it and the ocean. Wind loads are higher, salt is constant, and rain blows sideways into every joint. A railing that would last a long time on a sheltered street ages faster here. So the railing system, its finish, the fasteners and the way the posts are set are chosen for a marine environment, and the new posts are sealed so water does not sit where the old ones failed.
Anchors come first. Where the concrete around a post has cracked or the steel inside has rusted, we cut out the damaged concrete, treat what is there and rebuild before the new post goes in. If the association's engineer has a report from the 40-year recertification or a later inspection, we price the railing and repairs against that scope.
Every balcony belongs to a unit, so the work moves unit by unit. The association sets the elevator booking and the work window; we plan to it, and we coordinate access to each unit through the manager. A balcony is never left without a guard: the old railing comes off only when the new one is ready to go in the same day, or a temporary guard is set.
What's in the price
The board gets a record of each balcony's anchors before and after, which is what matters the next time the building is inspected.
What separates railing contractors on the beach
The quick bid sets new posts into old holes. On the ocean side of the Mile, that puts new metal right back where the salt already won.
Homeowners
We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.
Extremely professional company and very dedicated to their clients! Their work was impeccable and I was very pleased with their services!
The work they did on our house was fantastic. The crew was efficient with their time and courteous with coming in and out of our home. I will recommend them to all my friends and family! Honest and great people to work with.
Best service ever! They take care of every detail! Always on time, everything came up as I wanted. Thank you!
The absolute best! Would definitely recommend 100%!!
They are the best! Everything was perfect. Super responsible, reliable and always on time. I recommend them 100%.
Google Business Profile rating recorded September 14, 2026. Read them on Google.
Before you hire anyone
Water and salt get into the post cores and reach the steel in the concrete. The stain is the steel rusting, and it usually means the concrete around that post needs repair before a new railing goes in.
Both work when they are specified for the wind and the salt. The choice usually comes down to the building's look and how the association wants the facade to read.
It can. If the association's engineer has listed railing or balcony repairs, we price the work against that scope. The engineer inspects; we do the repairs.
Yes, to reach the balcony. Access is arranged through the manager, unit by unit, inside the association's work window.
No. The old railing comes off only when the new one goes in that day, or a temporary guard stays in place.
Yes. We pull the permit with the City of Fort Lauderdale, and we prepare the package the association asks for.
More on the Galt Ocean Mile
FF Builders is a Florida Certified General Contractor working along the Galt Ocean Mile, in the condo towers on the sand, the hotels on Galt Ocean Drive and the storefronts that serve them. Kitchens, baths, impact glass, facades and full unit renovations are the same company, with one person answering the phone from the first visit to the final inspection.
Balcony railing replacement · General contractor in Galt Ocean Mile · Building facade restoration on the Galt Ocean Mile · Concrete contractor on the Galt Ocean Mile · Whole-building window replacement on the Galt Ocean Mile · Balcony railing replacement in Lauderdale-by-the-Sea · Balcony railing replacement in Coral Ridge · Balcony railing replacement in Lauderdale Beach
Free in-home visit
Tell us roughly what you're thinking. We come out, measure, and leave you with a real number. No obligation, and no decision required before you book.
We got your request and will call to set the visit during business hours (Mon–Fri, 8am–6pm ET).