We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.

On a Surfside oceanfront building, the railing and the slab edge it sits in are usually one job. We follow the engineer's report: railing off, concrete repaired, new railing anchored, stack by stack.
We got your request and will call to set the visit (Mon–Fri, 8am–6pm ET).
How it works
After the collapse in Surfside in 2021, Florida began requiring milestone inspections and structural reserves for condo buildings, and balconies here are now looked at closely. Many associations on Collins Avenue already have an engineer's report that lists railing posts and slab edges. We read that report with the board and build the railing work around it.
What we do in Surfside
Old railings taken down and hauled off, balcony by balcony, with the opening protected.
Concrete repaired where the engineer's report calls for it.
Aluminum and glass or picket railings anchored as the engineer specifies.
Sealing at the post bases and balcony surface where specified.
Impact sliding doors replaced while the balcony is open, when the owner wants it.
Done with the rest of the elevation when the report covers it.

What is different in Surfside
Railing posts set into the edge of a concrete slab are a common place for salt water to reach the steel inside. When the engineer's report calls for slab edge repairs, the railing has to come off first, the concrete is repaired, and only then can a new railing be anchored into sound material. Installing new railings on an edge that is still due for repair means taking them off again. We sequence the job in that order, and the engineer reviews the repairs as the report requires before the new posts go in. We do not inspect the building; we carry out what the engineer wrote.
Who pays for what is set by the building's documents, not by us. In some associations the railing is a common element and the whole project belongs to the association; in others parts of the balcony are the owner's responsibility. The board and its attorney decide that. Our estimate is laid out balcony by balcony and line by line so it can be split whichever way the documents say.
Access is the other piece. Many Surfside owners are away for part of the year, and balcony work needs the unit open. We schedule stack by stack through the manager, protect the floors and the balcony doors on the way through, and every balcony is left with a secure temporary barrier or its new railing at the end of each day. The permit is pulled with the Town of Surfside.
What's in the price
The board gets a balcony-by-balcony record of what was removed, repaired and installed, for the association's files and the engineer.
The part that separates railing contractors
The shortcut is swapping railings without touching the concrete they sit in. In Surfside, with the reports associations now have, that work does not last to the next inspection.
Homeowners
We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.
Extremely professional company and very dedicated to their clients! Their work was impeccable and I was very pleased with their services!
The work they did on our house was fantastic. The crew was efficient with their time and courteous with coming in and out of our home. I will recommend them to all my friends and family! Honest and great people to work with.
Best service ever! They take care of every detail! Always on time, everything came up as I wanted. Thank you!
The absolute best! Would definitely recommend 100%!!
They are the best! Everything was perfect. Super responsible, reliable and always on time. I recommend them 100%.
Google Business Profile rating recorded September 14, 2026. Read them on Google.
Before you hire anyone
Yes. We remove the railings, carry out the concrete repairs the report lists and install the new railings, and the engineer reviews the work as the report requires.
No. The inspection and the repair design are the engineer's. We price and carry out the work the report calls for.
That is set by your condo documents and decided by the board and its attorney. Our estimate is broken down by balcony so it can be divided either way.
Units are scheduled through the manager, the same way the building handles access for other work.
Yes, when the owner wants it. Doing it while the balcony is open avoids disturbing the new railing later.
Yes. FF Builders is a Florida Certified General Contractor, licensed and insured, with certificates for the association as required.
More in Surfside
FF Builders is a Florida Certified General Contractor working across Surfside, from the condos on Collins Avenue to the homes west of Harding Avenue. Kitchens, baths, floors, windows and concrete repair are the same company, with one person answering the phone from the first visit to the final inspection.
Balcony railing replacement · General contractor in Surfside · Building facade restoration in Surfside · Concrete contractor in Surfside · Impact doors in Surfside · Balcony railing replacement in Bal Harbour · Balcony railing replacement in Bay Harbor Islands · Balcony railing replacement in Miami Beach
Free in-home visit
Tell us roughly what you're thinking. We come out, measure, and leave you with a real number. No obligation, and no decision required before you book.
We got your request and will call to set the visit during business hours (Mon–Fri, 8am–6pm ET).