FF BuildersFF Builders
Remodeled primary bathroom with freestanding tub and glass shower in a Biscayne Park home
Biscayne Park · Licensed GC · Permitted

Bathroom remodeling
in Biscayne Park.

In the Village, a bathroom drain often runs through decades-old pipe, under a house surrounded by big trees and their roots. We find out what is down there before we price the tile, in writing within 24 hours of the visit.

Google5.0★★★★★Licensed & insuredPermits includedWritten estimate

Book your in-home visit

Free, no obligation. You don't need to have it all figured out before booking.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

5.0 ★★★★★ on GoogleLicensed Florida GCInsured every jobFirm written price

How it works

The pipe under the floor sets the price.

Two bathrooms with the same tile can cost very different amounts here. The difference is the drain line under the house, what the roots have done to it, and where it goes when it leaves the lot.

  1. You reach outForm or call. We call back to book a free visit, evenings and Saturdays included.
  2. We look at what runs under the bathroomThe drain and supply lines, the shower pan, whether the house sits on a slab or a raised floor, and whether it drains to septic or sewer.
  3. You get the estimate in writing, within 24 hoursDemolition, plumbing, waterproofing, tile, fixtures and the permit, with what depends on opening the floor listed separately.
  4. You decideRead it, compare it, call when you are ready. Nothing starts before you sign.

What we build in Biscayne Park

The whole bathroom, from the drain up.

Full bathroom remodel

Taken back to the block or the studs and rebuilt, with the layout you want.

Walk-in showers

Tubs converted to low curb or curbless showers, with the slope built in.

Shower waterproofing

A membrane under the tile, flood tested before anything covers it.

Vanities and fixtures

Single and double vanities, stone tops, lighting and mirrors.

Drain and supply lines

Old pipe replaced while the floor is open, in the same contract.

A second bathroom

Added where the plan has room, with the drainage planned first.

Finished bathroom remodel with large format tile and a glass shower

What changes in Biscayne Park

Old pipe,
and trees that found it.

Most houses in Biscayne Park were built between the 1930s and the 1950s, and many of their bathrooms still drain through the pipe that went in then: cast iron that has scaled inside, or clay and older joints that let water out and let roots in. In a village this shaded, the trees close to the house are part of the plumbing story. Roots go where the water is, and an old joint under a bathroom is often exactly where they end up.

That is why we look at the drain before the finishes. When the old line is cracked, sagging or full of roots, new tile on top of it is a remodel waiting to be opened again. When the floor is already open is the cheapest moment to replace it, and the estimate shows that as its own line so you can see it.

Where the drain goes also matters. Some homes are on septic and others on sewer, and a bathroom that moves fixtures or adds a new one has to work with whichever the house has. We ask about it at the visit, and the plan and the permit take it into account from the start, so the layout you choose is one the house can drain.

What's in the price

The whole bathroom,
start to inspection.

One contract and one permit. Demolition, plumbing, waterproofing, tile and finish are the same company, so nothing falls between crews.

  • Demolition and haul away — old tile, mortar bed and fixtures out, the rest of the house protected
  • Drain and supply lines — old pipe replaced or moved, brought to code
  • Waterproofing — a membrane on the shower floor and walls, flood tested before tile
  • Tile and stone — set flat, with the slope to the drain built in
  • Vanity, fixtures and glass — installed and sealed
  • Permit and inspections — pulled with the Village, inspected and closed

The part that separates bathroom remodelers here

A new bathroom on
an old drain is not new.

The cheap version of a bathroom remodel keeps the old drain, sets new tile over it and leaves before anyone finds out. Under a house with trees this close, that is where the next problem starts.

Homeowners

Rated 5.0 on Google.

5.0
★★★★★
Google rating · every review, five stars
Google
K Kelsey BarbosaGoogle review Google
★★★★★

We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.

S Sasha AbouGoogle review Google
★★★★★

Extremely professional company and very dedicated to their clients! Their work was impeccable and I was very pleased with their services!

G Gabriel BarbosaGoogle review Google
★★★★★

The work they did on our house was fantastic. The crew was efficient with their time and courteous with coming in and out of our home. I will recommend them to all my friends and family! Honest and great people to work with.

S sara bouGoogle review · Local Guide Google
★★★★★

Best service ever! They take care of every detail! Always on time, everything came up as I wanted. Thank you!

D deborah medel-gimenezGoogle review Google
★★★★★

The absolute best! Would definitely recommend 100%!!

M Monica BecharaGoogle review · Local Guide Google
★★★★★

They are the best! Everything was perfect. Super responsible, reliable and always on time. I recommend them 100%.

Google Business Profile rating recorded September 14, 2026. Read them on Google.

Before you hire anyone

The ones people actually ask.

How do you know if the drain line needs replacing?

We look at it during the visit and, when it is not visible, the estimate lists it as something confirmed once the floor is open, with its price written down.

Can tree roots really get into the bathroom drain?

In older pipe, yes. Roots follow water and get into cracked or loose joints. When the floor is open we replace the damaged section.

Our house is on septic. Can we still add a bathroom?

It depends on the house and the system. We ask about it at the visit, and the plan and the permit take it into account. Check with the Village for what applies to your lot.

How long does a bathroom remodel take?

It depends on the scope and the permit. You get a realistic timeline in writing with the estimate, including lead times on tile and fixtures.

Do you handle the permit?

Yes. Permits are pulled with the Village, inspected and closed as part of the job, and they are in the price.

Are you licensed and insured?

Yes. FF Builders is a Florida Certified General Contractor, licensed and insured.

More in Biscayne Park

One contractor for the whole house.

FF Builders is a Florida Certified General Contractor working across Biscayne Park, on the Village's older houses under the canopy. Kitchens, baths, additions, windows and structural work are the same company, with one person answering the phone from the first visit to the final inspection.

Bathroom remodeling · General contractor in Biscayne Park · Home remodeling in Biscayne Park · Walk-in showers in Biscayne Park · Shower waterproofing in Biscayne Park · Bathroom vanities in Biscayne Park · Bathroom remodeling in Miami Shores

Free in-home visit

Your bathroom, built on a drain that lasts.

Tell us roughly what you're thinking. We come out, measure, and leave you with a real number. No obligation, and no decision required before you book.

  • A firm written price — material, labor, removal and haul-away.
  • Licensed & insured Florida crews — on every single job.
  • We call you back fast — during business hours, same or next day.

Book your in-home visit

Free, no obligation. Decide after you see the numbers.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

Mon–Fri, 8am–6pm ET · Serving Miami-Dade & Broward.