FF BuildersFF Builders
FF Builders crew setting tile in a condo unit
Coral Gables · Association-ready · Permitted

Condo renovation approval
in Coral Gables.

In a Coral Gables condo there can be two approvals, not one: your association for the inside, and the city's Board of Architects for anything outside. We sort your scope into the right one on the first visit.

Google5.0★★★★★Licensed & insuredPermits includedWritten estimate

Book your in-home visit

Free, no obligation. You don't need to have it all figured out before booking.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

5.0 ★★★★★ on GoogleLicensed Florida GCInsured every jobFirm written price

How it works

Which approval does your project need?

A new kitchen, bathroom or floor is inside the unit, so the association approves it. Impact windows, new balcony doors or a change to the balcony are on the facade, and in Coral Gables exterior changes are reviewed by the Board of Architects before the permit. Knowing which is which on day one is what keeps the schedule honest.

  1. You reach outForm or call. We call back to book a free visit, evenings and Saturdays included.
  2. We read the rules and your scopeYour building's renovation requirements, and each part of your project sorted into interior or exterior.
  3. You get the estimate in writing, within 24 hoursThe work, the association package, the permit and, when it applies, the exterior review step, with a realistic start date.
  4. You decideRead it, compare it, call when you are ready. Nothing starts before you sign.

What goes in the package

Complete the first time.

Scope of work

A clear description of what will be done, room by room.

Drawings

Plans for layout, plumbing or structural changes.

License and insurance

Certificates naming the association as the building requires.

Schedule

Start, duration and work hours.

Sound specifications

Underlayment data for hard floors.

Exterior items flagged

Windows and doors identified for the city's review.

Condo kitchen under renovation with protected floors

Two layers in Coral Gables

The association decides inside.
The city reviews outside.

Most associations require approval before any renovation that touches floors, walls, plumbing, electrical or structure. The manager or the board reviews the scope, the contractor's license and insurance, and sometimes drawings. That is true across Miami-Dade. What is specific to Coral Gables is the second layer: the Board of Architects, which reviews exterior changes before a permit is issued.

For a unit owner, that second layer usually shows up with windows and balcony doors. They are part of the facade, so a new frame color, a different glass or a new door style changes how the building looks from the street. Owners who bundle new impact glass with a kitchen remodel often expect one approval and one start date. In this city it is two tracks, and the kitchen does not need to wait for the glass.

We prepare the association package with the scope written clearly, the certificates the building requires, the flooring specifications and a realistic schedule. Most delays come from a missing document, so the first submission is complete. Once approved, the permit is pulled and the work follows the building's hours, elevator reservations and protection rules.

What's in the price

The paperwork,
in the right order.

Interior and exterior handled as two tracks, so one never holds up the other.

  • Rules review — your building's renovation requirements, read before submitting
  • Scope sorting — each item marked interior or exterior
  • Association package — scope, drawings and specifications
  • Certificates — license and insurance as required
  • Permit — pulled after the association approves
  • Building logistics — hours, elevator and protection
  • Close-out — inspections closed and the building informed

The part that separates condo contractors here

The delay is usually
a missing piece.

A contractor who treats a Coral Gables condo like any other Miami-Dade unit tends to discover the exterior review after the windows are ordered. Sorting the scope on the first visit is what avoids it.

Homeowners

Rated 5.0 on Google.

5.0
★★★★★
Google rating · every review, five stars
Google
K Kelsey BarbosaGoogle review Google
★★★★★

We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.

S Sasha AbouGoogle review Google
★★★★★

Extremely professional company and very dedicated to their clients! Their work was impeccable and I was very pleased with their services!

G Gabriel BarbosaGoogle review Google
★★★★★

The work they did on our house was fantastic. The crew was efficient with their time and courteous with coming in and out of our home. I will recommend them to all my friends and family! Honest and great people to work with.

S sara bouGoogle review · Local Guide Google
★★★★★

Best service ever! They take care of every detail! Always on time, everything came up as I wanted. Thank you!

D deborah medel-gimenezGoogle review Google
★★★★★

The absolute best! Would definitely recommend 100%!!

M Monica BecharaGoogle review · Local Guide Google
★★★★★

They are the best! Everything was perfect. Super responsible, reliable and always on time. I recommend them 100%.

Google Business Profile rating recorded September 14, 2026. Read them on Google.

Before you hire anyone

The ones people actually ask.

Do I need city approval to renovate my condo in Coral Gables?

For work inside the unit, the association approves it and a permit is pulled where the scope requires one. Changes on the outside of the building, like windows or balcony doors, are exterior, and the Board of Architects reviews exterior changes before the permit.

Can I renovate my kitchen while the window review is pending?

Usually, yes. Interior work moves on the association's approval, and the windows follow their own timeline.

Do you prepare the association approval package?

Yes. Scope, drawings, specifications, certificates and schedule.

Can you provide insurance certificates for my building?

Yes, with the association named as the building requires.

Can you talk directly with the property manager?

Yes, with your authorization.

How long until work can start?

It depends on your building's approval process and whether anything exterior is involved. A complete package shortens it.

More in Coral Gables

One contractor for the whole house.

FF Builders is a Florida Certified General Contractor working across Coral Gables. Windows, doors, stucco, kitchens and baths are the same company, under the same contract, with one person answering the phone from the first visit to the final inspection.

Condo renovation approval · General contractor in Coral Gables · Condo renovation in Coral Gables · Condo soundproof flooring in Coral Gables · Impact windows in Coral Gables · Condo renovation approval in Pinecrest · Condo renovation approval in Coconut Grove · Condo renovation approval in South Miami

Free in-home visit

Your condo approved, inside and out.

Tell us roughly what you're thinking. We come out, measure, and leave you with a real number. No obligation, and no decision required before you book.

  • A firm written price — material, labor, removal and haul-away.
  • Licensed & insured Florida crews — on every single job.
  • We call you back fast — during business hours, same or next day.

Book your in-home visit

Free, no obligation. Decide after you see the numbers.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

Mon–Fri, 8am–6pm ET · Serving Miami-Dade & Broward.