FF BuildersFF Builders
Condo unit under renovation with new tile being set on the floor
Lauderdale Beach · Condos along A1A · Association and City

Condo renovation approval
in Lauderdale Beach.

A condo renovation along A1A has to clear two offices before the first tile comes up: your association and the City of Fort Lauderdale. We prepare what each one asks for, in the order they need it.

Google5.0★★★★★Licensed & insuredPermits includedWritten estimate

Book your in-home visit

Free, no obligation. You don't need to have it all figured out before booking.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

5.0 ★★★★★ on GoogleLicensed Florida GCInsured every jobFirm written price

How it works

We read your association's rules first.

Every condo association writes its own renovation rules: which work needs approval, what documents it wants, insurance limits, a deposit, flooring requirements, when the elevator can be used. The City has its own process for the permit. At the visit we ask for the association's rules and read them with you before we price anything, because they shape the scope and the schedule.

  1. You reach outForm or call. We call back to book a free visit, evenings and Saturdays included.
  2. We visit the unit with the rules in handScope walked room by room against what the association requires and what needs a City permit.
  3. You get the estimate in writing, within 24 hoursItemized, with the association package, the permit and the timing written in.
  4. You decideRead it, compare it, call when you are ready. Nothing starts before you sign.

What we prepare in Lauderdale Beach

The paperwork,
in the order it is needed.

Association package

Scope, drawings, product sheets, our license and the certificate of insurance the association asks for.

Flooring documentation

The underlayment data the building's sound rule asks for.

City permit

Pulled with the City of Fort Lauderdale for the work that needs one, reviewed under the Florida Building Code.

Elevator and deliveries

Booked through the manager for each stage.

Inspections

Scheduled with the City as the work reaches each one.

The renovation itself

Kitchen, baths, floors and finishes once the paperwork is in place.

Condo kitchen under renovation with cabinets removed and walls opened

What changes in Lauderdale Beach

Association, City, elevator,
hours. In that order.

The association comes first. It decides whether the work is allowed and under what conditions, and it can ask for drawings, product sheets, an insurance certificate and a deposit before it issues the letter. If it asks for an approval letter, we prepare the package it asks for, complete and in the format it wants, so the decision is about the work and not about missing pages. The decision itself is the association's.

The City of Fort Lauderdale comes next. Moving plumbing, changing electrical, replacing windows or opening walls needs a permit, reviewed and inspected under the Florida Building Code. We pull the permit and schedule the inspections as the work reaches each stage. The City reviews and decides; we make sure the drawings and the work match what was submitted.

Then the two calendars. The association sets the elevator booking and the work window; we plan to it. The City sets construction hours for every day, with a later start on Sunday, and work outside them needs a noise control plan approved by the Building Official and the City Manager. We plan the loud work inside both, so the unit next door hears demolition only when the rules say it can.

What's in the price

Both offices covered
before work starts.

You get a single list showing what the association has, what the City has, and what is still waiting, at every point of the job.

  • Rules reviewed — the association's renovation rules read with you
  • Association package — prepared in the format it asks for
  • Certificate of insurance — issued to the association
  • City permit — pulled for the work that needs one
  • Elevator booking — through the manager for each stage
  • Inspections — scheduled with the City
  • Status list — what is approved and what is pending

The part that separates condo contractors

An incomplete package
costs you weeks.

The shortcut is starting demolition and sending paperwork later. In a condo along A1A, that is how a unit ends up stopped halfway with the cabinets out.

Homeowners

Rated 5.0 on Google.

5.0
★★★★★
Google rating · every review, five stars
Google
K Kelsey BarbosaGoogle review Google
★★★★★

We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.

S Sasha AbouGoogle review Google
★★★★★

Extremely professional company and very dedicated to their clients! Their work was impeccable and I was very pleased with their services!

G Gabriel BarbosaGoogle review Google
★★★★★

The work they did on our house was fantastic. The crew was efficient with their time and courteous with coming in and out of our home. I will recommend them to all my friends and family! Honest and great people to work with.

S sara bouGoogle review · Local Guide Google
★★★★★

Best service ever! They take care of every detail! Always on time, everything came up as I wanted. Thank you!

D deborah medel-gimenezGoogle review Google
★★★★★

The absolute best! Would definitely recommend 100%!!

M Monica BecharaGoogle review · Local Guide Google
★★★★★

They are the best! Everything was perfect. Super responsible, reliable and always on time. I recommend them 100%.

Google Business Profile rating recorded September 14, 2026. Read them on Google.

Before you hire anyone

The ones people actually ask.

What does the association need from you?

It depends on its rules. Usually scope, drawings, product sheets, our license and a certificate of insurance. We prepare the package it asks for.

Do you get the approval for me?

The association decides. We prepare a complete package so the decision is about the work, not missing documents.

What work needs a City permit?

Plumbing, electrical, windows, walls and most layout changes. We pull the permit with the City of Fort Lauderdale and schedule the inspections.

When can the loud work happen?

Within the construction hours the City sets, with a later start on Sunday, and inside the association's work window.

Can flooring be changed without approval?

Usually it needs the association's sign-off, often with underlayment data attached. Check with the association; we prepare that documentation.

Are you licensed and insured?

Yes. FF Builders is a Florida Certified General Contractor, licensed and insured, with certificates for the association as required.

More in Lauderdale Beach

One contractor, house to hotel.

FF Builders is a Florida Certified General Contractor working in Lauderdale Beach, on the houses and townhouses by the sand, the condos along A1A and the hotel work beside them. Kitchens, baths, impact glass, additions and full renovations are the same company, with one person answering the phone from the first visit to the final inspection.

Condo renovation approval · General contractor in Lauderdale Beach · Condo renovation in Lauderdale Beach · Condo soundproof flooring in Lauderdale Beach · Condo unit combination in Lauderdale Beach · Condo renovation approval in Galt Ocean Mile · Condo renovation approval in Coral Ridge · Condo renovation approval in Bay Colony

Free in-home visit

Your condo renovation, paperwork ready before the first tile comes up.

Tell us roughly what you're thinking. We come out, measure, and leave you with a real number. No obligation, and no decision required before you book.

  • A firm written price — material, labor, removal and haul-away.
  • Licensed & insured Florida crews — on every single job.
  • We call you back fast — during business hours, same or next day.

Book your in-home visit

Free, no obligation. Decide after you see the numbers.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

Mon–Fri, 8am–6pm ET · Serving Miami-Dade & Broward.