FF BuildersFF Builders
FF Builders crew setting tile in a condo unit with a view of Biscayne Bay
Miami Shores · Two different reviews · Prepared for both

Condo renovation approval
for Miami Shores owners.

If you have renovated a house in Miami Shores, you know the Village looks closely at what changes outside. A condo association looks at something else: what your neighbors will hear and what your work touches in the building. We prepare the package and the permit, and build.

Google5.0★★★★★Licensed & insuredPermits includedWritten estimate

Book your in-home visit

Free, no obligation. You don't need to have it all figured out before booking.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

5.0 ★★★★★ on GoogleLicensed Florida GCInsured every jobFirm written price

How it works

A different review
looking at different things.

Residents of the Village are used to a careful eye on the outside of their homes: windows, roofs, fences, additions, anything the street sees. Inside their own house, they have more freedom. A condo flips that. The association cares about your floor because it is your neighbor's ceiling, about your plumbing because it shares a riser, about your hours because the walls are shared. We visit the unit and read the building's rules before pricing.

  1. You reach outForm or call. We call back to book a free visit, evenings and Saturdays included.
  2. We visit and read the rulesScope, the building's renovation requirements, hours, elevator, deposit and the jurisdiction.
  3. You get the estimate in writing, within 24 hoursItemized, with the association package and the permit listed as their own steps.
  4. You decideRead it, compare it, call when you are ready. Nothing starts before you sign.

What we prepare and build

The package,
then the work.

Association package

Scope, drawings, product sheets, license and insurance certificates.

Permit

With the city where the building is.

Kitchens and baths

The scopes that touch shared plumbing.

Flooring

With the sound underlayment the building requires.

Windows and balcony doors

With the product approvals the building asks for.

Full unit renovation

Every room on one approval.

Condo kitchen under renovation with protected floors and a bay view

For owners who know the Village's review

Outside the house,
inside the building.

On your house, the questions that slow a project in the Village are usually about appearance: the window style, the roof, the fence, the addition seen from the street. On a condo unit in Edgewater, Downtown, Miami Beach or Bal Harbour, those questions mostly disappear, because the outside belongs to the building. What the association asks instead is technical: which floor underlayment, whether you are moving a wet wall, whether the work cuts into the slab, what hours the crew keeps, and how the elevator is protected.

We answer those in the package before the association asks. The flooring spec names the underlayment. The plumbing plan shows what connects to the riser and what does not. The schedule shows working hours and elevator bookings. Most associations want to approve before a permit is pulled, so the order is association first, then the permit with the city where the building is. The crew does not start until both are in place.

For the few condo and townhome buildings inside Miami Shores, both reviews can apply: the association for the inside, and, for anything that changes the outside, the Village. Plan the Village's review for exterior work; check with the Village. The estimate lists which review applies to which part of the scope, so nothing is built ahead of its approval.

What's in the price

Approved, permitted,
then built.

You get the renovation and the paperwork that lets it happen.

  • Rules review — the building's documents read before pricing
  • Association package — drawings, products and certificates
  • Technical answers — sound, plumbing, hours, elevator
  • Permit — with the building's city
  • Exterior review noted — for buildings inside the Village
  • Construction — to the approved scope
  • Close-out — final inspection and the association's sign-off

The part that separates condo contractors

Answering the question
before it is asked.

Packages that come back with questions add rounds of waiting. A package that already answers sound, plumbing and schedule usually does not.

Homeowners

Rated 5.0 on Google.

5.0
★★★★★
Google rating · every review, five stars
Google
K Kelsey BarbosaGoogle review Google
★★★★★

We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.

S Sasha AbouGoogle review Google
★★★★★

Extremely professional company and very dedicated to their clients! Their work was impeccable and I was very pleased with their services!

G Gabriel BarbosaGoogle review Google
★★★★★

The work they did on our house was fantastic. The crew was efficient with their time and courteous with coming in and out of our home. I will recommend them to all my friends and family! Honest and great people to work with.

S sara bouGoogle review · Local Guide Google
★★★★★

Best service ever! They take care of every detail! Always on time, everything came up as I wanted. Thank you!

D deborah medel-gimenezGoogle review Google
★★★★★

The absolute best! Would definitely recommend 100%!!

M Monica BecharaGoogle review · Local Guide Google
★★★★★

They are the best! Everything was perfect. Super responsible, reliable and always on time. I recommend them 100%.

Google Business Profile rating recorded September 14, 2026. Read them on Google.

Before you hire anyone

The ones people actually ask.

Does the Village of Miami Shores issue the permit for my condo?

Only if the building is inside the Village. Otherwise it comes from the city where the building is, such as Miami, Miami Beach or Bal Harbour.

What does a condo association usually look at?

The floor underlayment, any change to plumbing or walls, work hours, elevator use, the contractor's license and insurance, and sometimes a deposit. Each building sets its own list.

Do I need the association's approval before the permit?

Most associations require it first, and some will not let a crew in without both.

My building is a townhome community inside Miami Shores. Does the Village review my work?

For changes to the outside, plan the Village's review for exterior work and check with the Village. Interior work usually goes through the association and the permit.

Can flooring be changed without approval?

Usually not. Many buildings require a specific sound underlayment and approve the floor before it is installed.

Are you licensed and insured?

Yes. FF Builders is a Florida Certified General Contractor, licensed and insured, with certificates issued to the association as required.

More in Miami Shores

One contractor for the whole house.

FF Builders is a Florida Certified General Contractor working across Miami Shores, from the 1920s to 1950s houses the Village keeps so well to the homes on the bay. Kitchens, baths, additions, windows and structural work are the same company, with one person answering the phone from the first visit to the final inspection.

Condo renovation approval · General contractor in Miami Shores · Condo renovation in Miami Shores · Condo soundproof flooring in Miami Shores · Condo unit combination in Miami Shores · Condo renovation approval in Miami Beach · Condo renovation approval in Bal Harbour

Free in-home visit

The approvals in order, so the work can start.

Tell us roughly what you're thinking. We come out, measure, and leave you with a real number. No obligation, and no decision required before you book.

  • A firm written price — material, labor, removal and haul-away.
  • Licensed & insured Florida crews — on every single job.
  • We call you back fast — during business hours, same or next day.

Book your in-home visit

Free, no obligation. Decide after you see the numbers.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

Mon–Fri, 8am–6pm ET · Serving Miami-Dade & Broward.