FF BuildersFF Builders
FF Builders crew setting tile in a condo unit with an ocean view
Surfside · Association package · Town permit

Condo renovation approval
in Surfside.

Surfside associations are careful with anything that touches the concrete: a drilled hole, a removed wall, a balcony floor. We prepare the package your building asks for, then the permit with the Town.

Google5.0★★★★★Licensed & insuredPermits includedWritten estimate

Book your in-home visit

Free, no obligation. You don't need to have it all figured out before booking.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

5.0 ★★★★★ on GoogleLicensed Florida GCInsured every jobFirm written price

How it works

We find out what your building will ask.

Since 2021, condo associations in Surfside look at unit renovations with more care, especially anything that touches the slab, a wall or a balcony. Each building on Collins Avenue has its own forms and rules, and some send the plans to their own engineer. At the visit we ask the manager for the current application and rules, so the package is right the first time.

  1. You reach outForm or call. We call back to book a free visit, evenings and Saturdays included.
  2. We walk the unit and get the rulesScope, walls, floors, plumbing and balcony, plus the building's application, flooring rule, work hours and insurance requirements.
  3. You get the estimate in writing, within 24 hoursItemized, with the approval package, any drawings and a schedule that fits the building.
  4. You decideRead it, compare it, call when you are ready. Nothing starts before you sign.

What we prepare in Surfside

The package,
the permit, the work.

Association application

Forms, scope and schedule as your building asks for them.

Drawings

Prepared where the work touches structure, plumbing or layout.

Flooring specification

The underlayment and product your building's rule requires.

Certificate of insurance

Naming the association as the building requires.

Town permit

Pulled with the Town of Surfside where the work requires one.

The renovation

Kitchen, baths, floors and finishes, built to what was approved.

Condo kitchen under renovation with protected floors and an ocean view

What is different in Surfside

Anything that touches
the concrete gets a closer look.

A kitchen remodel that only swaps cabinets is usually a simple approval. One that moves a sink, drills through the slab for a drain, removes a wall or changes the balcony floor is a different conversation. Many Surfside boards now ask for drawings and details before they approve that kind of work, and some have their own engineer review it. We identify those items at the visit and prepare what the building needs for them, instead of finding out after the application comes back.

The balcony deserves its own line. In most buildings it is part of the structure the association maintains, and changing its tile, drilling into it or anchoring anything to it often needs specific approval or is not allowed. We check the building's rules before anything about the balcony goes in the scope, and if the building is doing its own concrete work, we wait for it rather than finishing a surface that will be opened again.

Once the association approves, the permit is pulled with the Town of Surfside, which has its own building department. We prepare the package; you or the manager submit it the way the building asks, and we answer the questions that come back. The work then follows the hours, elevator bookings and protection rules the association set.

What's in the price

Approved before
anything is opened.

Nothing in the unit is demolished before the association has approved it.

  • Rules collected — application, hours and flooring rule from the manager
  • Application package — forms, scope and schedule
  • Drawings — where the work touches structure or plumbing
  • Certificate of insurance — as the association requires
  • Town permit — pulled with the Town of Surfside
  • Elevator and protection — booked and set up by the building's rules
  • Final inspection — with the Town, and the association's sign-off

The part that separates condo contractors

A rejected application
costs you months, not days.

The shortcut is sending a one-line scope and hoping. In a Surfside building, anything that touches the concrete without drawings comes back with questions.

Homeowners

Rated 5.0 on Google.

5.0
★★★★★
Google rating · every review, five stars
Google
K Kelsey BarbosaGoogle review Google
★★★★★

We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.

S Sasha AbouGoogle review Google
★★★★★

Extremely professional company and very dedicated to their clients! Their work was impeccable and I was very pleased with their services!

G Gabriel BarbosaGoogle review Google
★★★★★

The work they did on our house was fantastic. The crew was efficient with their time and courteous with coming in and out of our home. I will recommend them to all my friends and family! Honest and great people to work with.

S sara bouGoogle review · Local Guide Google
★★★★★

Best service ever! They take care of every detail! Always on time, everything came up as I wanted. Thank you!

D deborah medel-gimenezGoogle review Google
★★★★★

The absolute best! Would definitely recommend 100%!!

M Monica BecharaGoogle review · Local Guide Google
★★★★★

They are the best! Everything was perfect. Super responsible, reliable and always on time. I recommend them 100%.

Google Business Profile rating recorded September 14, 2026. Read them on Google.

Before you hire anyone

The ones people actually ask.

What does our association need before we renovate?

It varies by building. Usually an application, a scope, a schedule and a certificate of insurance, and drawings when the work touches structure, plumbing or layout. We get the current rules from your manager.

Can we drill through the slab to move a drain?

Sometimes, with the association's approval and often a review of the drawings. We identify it at the visit so it is in the package.

Can we change the tile on our balcony?

It depends on the building. The balcony is usually part of the structure the association maintains, so we check the rules first.

Do I need a permit from the Town too?

For most renovations beyond cosmetic work, yes. The permit is pulled with the Town of Surfside and included in the estimate.

Can you deal with the manager directly?

Yes. We prepare the package and answer the building's questions.

Are you licensed and insured?

Yes. FF Builders is a Florida Certified General Contractor, licensed and insured, with certificates for the association as required.

More in Surfside

One contractor, condo or house.

FF Builders is a Florida Certified General Contractor working across Surfside, from the condos on Collins Avenue to the homes west of Harding Avenue. Kitchens, baths, floors, windows and concrete repair are the same company, with one person answering the phone from the first visit to the final inspection.

Condo renovation approval · General contractor in Surfside · Condo renovation in Surfside · Condo soundproof flooring in Surfside · Condo renovation for owners abroad in Surfside · Condo renovation approval in Bal Harbour · Condo renovation approval in Bay Harbor Islands · Condo renovation approval in Miami Beach

Free in-home visit

Get the approval right the first time.

Tell us roughly what you're thinking. We come out, measure, and leave you with a real number. No obligation, and no decision required before you book.

  • A firm written price — material, labor, removal and haul-away.
  • Licensed & insured Florida crews — on every single job.
  • We call you back fast — during business hours, same or next day.

Book your in-home visit

Free, no obligation. Decide after you see the numbers.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

Mon–Fri, 8am–6pm ET · Serving Miami-Dade & Broward.