FF BuildersFF Builders
Sound control underlayment covering a condo floor before tile installation
Bal Harbour · Marble out, quiet floor in · Threshold planned

Condo soundproof flooring
in Bal Harbour.

Many Bal Harbour units still have the marble the building was finished with. Replacing it means meeting the building's sound rule and the height of the balcony doors at the same time. We plan both, in writing within 24 hours.

Google5.0★★★★★Licensed & insuredPermits includedWritten estimate

Book your in-home visit

Free, no obligation. You don't need to have it all figured out before booking.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

5.0 ★★★★★ on GoogleLicensed Florida GCInsured every jobFirm written price

How it works

The old floor sets the height. The new one has to fit it.

A floor in an older oceanfront tower was often set in marble on a thick mortar bed. The doors, the cabinets, the balcony sliders and the elevator foyer were all fitted to that height. When the marble comes out and a new floor plus a sound mat goes in, the total has to land at the same place, or a door rubs and a threshold trips someone. The visit measures where everything sits today.

  1. You reach outForm or call. We call back to book a free visit, evenings and Saturdays included.
  2. We measure the floorCurrent height at every door, the balcony slider sill, the cabinets, and what the building's sound rule requires.
  3. You get the estimate in writing, within 24 hoursItemized by room, with demolition, leveling, underlayment and the new floor listed apart.
  4. You decideRead it, compare it, call when you are ready. Nothing starts before you sign.

What we install in Bal Harbour

From the slab up,
to the building's rule.

Marble and mortar removal

Old floor taken out in the building's hours, debris through the service route.

Slab leveling

The concrete brought flat so the new floor and the mat sit right.

Sound underlayment

The product and thickness that meet the building's rule, documented.

Large-format porcelain

The most common choice here, set over the mat.

New marble or stone

For owners who want stone again.

Wood floors

Engineered hardwood over a compatible mat.

Sound control membrane installed across a condo unit by the balcony doors

What is different in Bal Harbour

Quiet below,
flush at the balcony door.

The building's sound rule exists for the owner downstairs. In a tower where many owners come and go with the seasons, the neighbor below may not be home while the floor goes in, and first hear it the week they return. The underlayment is chosen to the building's specification and the product sheet goes in the association package, so the floor that is approved is the floor that is installed.

Height is the part people forget. The balcony slider in an oceanfront unit is an impact door with a sill set to the original floor. Raise the floor too much and the sill stops draining as designed or becomes a step; lower it too much and the gap shows. So the new build-up, from slab to finish, is planned around that sill, around the front door, and around the cabinets that stay, before a single tile is ordered.

Removing marble set in mortar is loud and heavy. It goes on the days and hours the association allows, with the service elevator reserved and the corridor protected, and the debris leaves through the loading area. The rest of the job is quiet by comparison, and owners who are away get photos of the slab, the mat and the floor as each goes in.

What's in the price

A floor the board approves
and the neighbor never hears.

The rule, the height and the building's hours planned together.

  • Height survey — every door, sill and cabinet measured
  • Underlayment to spec — the building's rule, with the product sheet
  • Association package — flooring and underlayment documented for approval
  • Demolition in allowed hours — service elevator and corridor protected
  • Leveling — the slab made flat before the mat
  • Photos at each layer — for owners who are away

The part that separates flooring contractors

The mat is not optional,
and neither is the sill.

The two ways a Bal Harbour floor job goes wrong are a complaint from downstairs and a balcony door that no longer fits. Both are decided before the first tile.

Homeowners

Rated 5.0 on Google.

5.0
★★★★★
Google rating · every review, five stars
Google
K Kelsey BarbosaGoogle review Google
★★★★★

We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.

S Sasha AbouGoogle review Google
★★★★★

Extremely professional company and very dedicated to their clients! Their work was impeccable and I was very pleased with their services!

G Gabriel BarbosaGoogle review Google
★★★★★

The work they did on our house was fantastic. The crew was efficient with their time and courteous with coming in and out of our home. I will recommend them to all my friends and family! Honest and great people to work with.

S sara bouGoogle review · Local Guide Google
★★★★★

Best service ever! They take care of every detail! Always on time, everything came up as I wanted. Thank you!

D deborah medel-gimenezGoogle review Google
★★★★★

The absolute best! Would definitely recommend 100%!!

M Monica BecharaGoogle review · Local Guide Google
★★★★★

They are the best! Everything was perfect. Super responsible, reliable and always on time. I recommend them 100%.

Google Business Profile rating recorded September 14, 2026. Read them on Google.

Before you hire anyone

The ones people actually ask.

What sound rating does my building require?

It is set in your building's rules, not by us. We read them with you and install to that specification.

Will the new floor be higher than the old marble?

It depends on the old mortar bed and the new build-up. We measure before ordering, and the estimate says where each threshold will land.

Can I put hardwood in a Bal Harbour condo?

Often, yes, over an underlayment that meets the building's rule. Some buildings have their own limits, so check your rules.

How loud is the demolition?

Loud, for the days it lasts. It is scheduled in the hours the association allows, and the neighbors get notice through the front desk.

Can you document the underlayment for the association?

Yes. The product sheet goes in the package, and photos of the mat are taken before it is covered.

Are you licensed and insured?

Yes. FF Builders is a Florida Certified General Contractor, licensed and insured, with certificates for the association.

More in Bal Harbour

One contractor, unit or house.

FF Builders is a Florida Certified General Contractor working across Bal Harbour, from oceanfront condo units on Collins Avenue to the homes on the bay. Kitchens, baths, floors, windows and concrete repair are the same company, with one person answering the phone from the first visit to the final inspection.

Condo soundproof flooring · General contractor in Bal Harbour · Flooring installation in Bal Harbour · Marble and stone in Bal Harbour · Condo renovation approval in Bal Harbour · Condo soundproof flooring in Surfside · Condo soundproof flooring in Bay Harbor Islands · Condo soundproof flooring in Miami Beach

Free in-home visit

New floors, quiet below and flush at the door.

Tell us roughly what you're thinking. We come out, measure, and leave you with a real number. No obligation, and no decision required before you book.

  • A firm written price — material, labor, removal and haul-away.
  • Licensed & insured Florida crews — on every single job.
  • We call you back fast — during business hours, same or next day.

Book your in-home visit

Free, no obligation. Decide after you see the numbers.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

Mon–Fri, 8am–6pm ET · Serving Miami-Dade & Broward.