FF BuildersFF Builders
Condo kitchen with a new porcelain floor laid over sound underlayment
Bay Colony · Loud work in the City's hours · Underlayment to the rule

Condo soundproof flooring
in Bay Colony.

In a Bay Colony Club unit, the floor you walk on is the ceiling of someone else's home. The quiet floor is built in the right layers, and the loud part, taking the old one out, is planned around the neighbors and the City's hours.

Google5.0★★★★★Licensed & insuredPermits includedWritten estimate

Book your in-home visit

Free, no obligation. You don't need to have it all figured out before booking.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

5.0 ★★★★★ on GoogleLicensed Florida GCInsured every jobFirm written price

How it works

Who hears your floor,
and when?

A hard floor carries footsteps, chairs and dropped pans into the unit below, and sometimes into the one beside it. At the visit we look at what is on the floor now, tap for hollow tile, check how level the concrete is where we can see it, and ask you for the association's flooring requirement, if it has one. We also look at where the noisy work will reach: whose ceiling sits under each room, and which walls are shared. That decides the order of the demolition.

  1. You reach outForm or call. We call back to book a free visit, evenings and Saturdays included.
  2. We check the floor and the neighborsCurrent floor, hollow spots, slab level, the association's requirement, and which rooms sit over or beside another unit.
  3. You get the estimate in writing, within 24 hoursPriced with demolition, slab work, underlayment and finish floor as separate lines.
  4. You decideRead it, compare it, call when you are ready. Nothing starts before you sign.

What we install in Bay Colony

A floor built
in quiet layers.

Demolition

Old tile, carpet and glue taken down to bare concrete.

Slab correction

High spots ground, low spots filled, cracks addressed before anything sits on them.

Sound underlayment

The product and rating the association requires, laid without gaps.

Porcelain and stone

Large tile or stone set over the sound layer.

Engineered wood

A wood floor built for humid air near the water.

Vinyl plank

With an attached or separate sound layer, as allowed.

Installer rolling out sound underlayment over a leveled concrete slab

What is different in Bay Colony

The loud days are planned.
The quiet floor is built.

Breaking out old tile is the loudest part of any condo floor, and in a unit with neighbors below and beside, it is also the part they remember. The City of Fort Lauderdale sets construction hours for every day of the week, with a later start on Sunday, and we keep the demolition inside them. Work outside those hours would need a noise control plan approved by the Building Official and the City Manager, so we plan around it instead. We also keep the loud days short: the room is cleared, the tools and the bags are ready, and the old floor comes out room by room.

Whether the association sets a sound rating or names a product for hard floors is the association's rule to state, so check with the association before choosing the finish. We build the floor to that requirement and keep the product sheet for its records. The concrete has to be flat first, because underlayment on a high spot gets crushed and tile over a low one sounds hollow and cracks. The sound layer is run to the walls and kept separate from the baseboard, so noise does not travel around the edge.

If the unit is upstairs, every bag of debris goes down and every box of tile comes up by hand, through the shared stair and walkway, so those are protected each day and cleaned each evening. Materials come in through the gate on the day we arranged with it, and in humid air by the water, engineered wood or porcelain usually holds up better than solid wood. Doors, thresholds and the base of the kitchen cabinets are measured against the new floor height before anything is ordered.

What's in the price

Quiet for the neighbors,
flat under your feet.

You get a floor built to the association's requirement, and neighbors who knew when the loud days were coming.

  • Floor and slab survey — hollow spots and level checked at the visit
  • Requirement check — the association's underlayment rule confirmed with you
  • Demolition plan — inside the City's hours, room by room
  • Slab correction — flat before any sound layer
  • Edge isolation — floor kept clear of walls and base
  • Product records — kept for the association's file
  • Close-out — final walk-through and a clean unit

What separates flooring contractors here

A new floor on an old one
sounds like the old one.

The shortcut is a thin pad over existing tile, or underlayment over concrete nobody leveled. The floor looks new and the neighbor below hears everything.

Homeowners

Rated 5.0 on Google.

5.0
★★★★★
Google rating · every review, five stars
Google
K Kelsey BarbosaGoogle review Google
★★★★★

We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.

S Sasha AbouGoogle review Google
★★★★★

Extremely professional company and very dedicated to their clients! Their work was impeccable and I was very pleased with their services!

G Gabriel BarbosaGoogle review Google
★★★★★

The work they did on our house was fantastic. The crew was efficient with their time and courteous with coming in and out of our home. I will recommend them to all my friends and family! Honest and great people to work with.

S sara bouGoogle review · Local Guide Google
★★★★★

Best service ever! They take care of every detail! Always on time, everything came up as I wanted. Thank you!

D deborah medel-gimenezGoogle review Google
★★★★★

The absolute best! Would definitely recommend 100%!!

M Monica BecharaGoogle review · Local Guide Google
★★★★★

They are the best! Everything was perfect. Super responsible, reliable and always on time. I recommend them 100%.

Google Business Profile rating recorded September 14, 2026. Read them on Google.

Before you hire anyone

The ones people actually ask.

Which underlayment does my unit need?

The one the association requires, if it sets a requirement. Check with the association; we build the floor to its rule and keep the product records.

When will the demolition happen?

Within the City of Fort Lauderdale's construction hours, which start later on Sunday, and on days your neighbors know about in advance.

Can the new floor go over the old tile?

Over old tile the sound layer cannot do its job. The old floor comes out to concrete, and the estimate shows demolition and slab work apart.

Is wood a good idea so close to the water?

Engineered wood handles humid air far better than solid wood, with the right underlayment under it. Porcelain is the other common choice.

Why does the slab need leveling?

Underlayment over a high spot gets crushed and tile over a low spot rings hollow, and both send sound to the unit below.

Are you licensed and insured?

Yes. FF Builders is a Florida Certified General Contractor, licensed and insured, with certificates for the association as needed.

More in Bay Colony

One contractor inside the gate.

FF Builders is a Florida Certified General Contractor working in Bay Colony, on the homes along the canals and in the Bay Colony Club. Kitchens, baths, impact glass, additions and full renovations are the same company, with one person answering the phone from the first visit to the final inspection.

Condo soundproof flooring · General contractor in Bay Colony · Flooring installation in Bay Colony · Condo renovation approval in Bay Colony · Hardwood flooring in Bay Colony · Condo soundproof flooring in Lauderdale-by-the-Sea · Condo soundproof flooring in Lighthouse Point · Condo soundproof flooring in Coral Ridge

Free in-home visit

A quiet floor, and neighbors who saw it coming.

Tell us roughly what you're thinking. We come out, measure, and leave you with a real number. No obligation, and no decision required before you book.

  • A firm written price — material, labor, removal and haul-away.
  • Licensed & insured Florida crews — on every single job.
  • We call you back fast — during business hours, same or next day.

Book your in-home visit

Free, no obligation. Decide after you see the numbers.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

Mon–Fri, 8am–6pm ET · Serving Miami-Dade & Broward.