We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.

Every chair needs water, air, suction and power at the exact point on the floor. We build the office around your equipment, so it installs the day the rooms are ready.
We got your request and will call to set the visit (Mon–Fri, 8am–6pm ET).
How it works
Your dental supplier's plan decides where every chair, delivery unit and cabinet goes. The visit starts with that plan, then follows the path of patients and staff.
What we build
Walls, glass and utilities at every chair.
Counters, sinks and a clear workflow.
Built to the specification for your equipment.
Built-ins at operatories, sterilization and reception.
Floors, walls and counters for daily cleaning.
Space, power and ventilation for the compressor and vacuum.

How a dental build-out works
The chair layout comes from your equipment supplier's templates. We mark each chair on the slab and bring up water, air, suction, drain and power exactly where the templates show.
Lines are run under the slab or in the walls to every operatory and back to the mechanical room, where the compressor and vacuum will be installed.
Operatory walls, glass and cabinetry are built next, with backing for monitors, lights and anything else that mounts. Imaging rooms are built to their specification.
Finishes go in last. The office is handed over clean and inspected, ready for your supplier to set the chairs and connect the equipment.
What's in the price
Utilities, cabinetry and inspections in one contract.
The part that separates dental contractors
A dental chair connects to the floor at exact points. If the utilities come up in the wrong place, the floor gets cut again and the opening date moves.
Homeowners
We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.
Extremely professional company and very dedicated to their clients! Their work was impeccable and I was very pleased with their services!
The work they did on our house was fantastic. The crew was efficient with their time and courteous with coming in and out of our home. I will recommend them to all my friends and family! Honest and great people to work with.
Best service ever! They take care of every detail! Always on time, everything came up as I wanted. Thank you!
The absolute best! Would definitely recommend 100%!!
They are the best! Everything was perfect. Super responsible, reliable and always on time. I recommend them 100%.
Google Business Profile rating recorded September 14, 2026. Read them on Google.
Before you build
Utilities at every chair. Each operatory needs water, compressed air, suction, a drain and power at specific points, usually coming up through the floor under the chair. Those lines run back to a mechanical room with the compressor and vacuum. Add a sterilization area with its own workflow, rooms for imaging and cabinetry at every station, and a dental office has far more infrastructure per square foot than a typical medical office. Most of it is hidden in the slab and the walls, so it has to be right before anything is finished.
Your dental equipment supplier. They provide and install the chairs, delivery units, lights, monitors, the compressor, the vacuum, sterilization equipment and imaging. Their templates and specifications tell us where each utility comes up and what each room needs. We build the office to those documents: utility stubs at each chair, lines back to the mechanical room, backing in the walls and openings for deliveries, so their installation goes in without changes.
In most spaces, the slab is cut along the routes in the layout, the lines are run to each chair location and the floor is closed again. Each stub is located from the supplier's template for that chair model, because different chairs connect at different points. In some layouts, part of the utilities come through the cabinet wall instead. The method depends on the chair, the slab and the building, and we settle it with your supplier before the concrete is cut.
A clear path from dirty to clean: a drop-off for used instruments, sinks for cleaning, space for the sterilizers, then storage for clean instruments. Counters have to take heat and cleaning products, outlets have to match the equipment, and the room is usually placed centrally so staff can reach it from every operatory. Your supplier and your team define the workflow, and we build the cabinetry, plumbing and power to match.
Some imaging equipment requires walls built to a protection specification, and some rooms need extra backing or power for the unit. Those requirements come with the equipment and the review that applies to it. We build the walls, doors and openings to the specification provided for your equipment and set the timing with your supplier, so the room is ready when the unit arrives. Outlets, backing and openings for the unit are placed from its documents.
The compressor and vacuum run all day and make noise and heat. They need a room with space around them, dedicated power, ventilation and a route for the lines to every operatory. The room is planned early in the layout, ideally away from patient areas. A mechanical room squeezed into a closet late in the design is one of the most common problems in dental offices. We plan it with your supplier from the first layout.
In operatories and sterilization, surfaces without seams or texture that trap dirt: sheet vinyl or sealed floors, scrubbable walls, solid-surface or quartz counters and cabinetry that tolerates cleaning products. In reception and consult rooms, the priority shifts to a calm, warm feel that helps anxious patients relax. Your designer or your practice requirements define the specification, and we build to it. Cabinetry finishes are chosen to match, so operatories look clean and stay that way.
Often yes, and it can save time and money when the existing utilities match your chair layout. Older lines, worn cabinetry or a mechanical room that does not fit new equipment may have to be replaced. We walk the space with you before you sign and tell you what can stay, what has to change and what that means for the schedule. Utility locations are checked against your new chair templates before anything is reused.
It is planned into the layout: the entrance, the reception counter, paths to operatories, door widths and the restrooms patients use, and at least one operatory with room to approach the chair. Accessibility is reviewed in the permit and inspections for a build-out, and it is much easier to build right the first time than to rebuild after a failed inspection. We plan these areas with the drawings, not after them.
It depends on the number of operatories, the slab work, the permit review, the landlord's approvals and the lead times on cabinetry and equipment. The estimate comes with a schedule built backward from the date you plan to see patients, with your equipment supplier's installation window included, so everything lands in the right order. Slab work for utilities happens early, so the floor and cabinetry are not waiting on it later.
Often yes, in phases. A group of operatories is closed, renovated and finished while the rest of the office keeps seeing patients. Slab work and noisy tasks are scheduled after hours when possible. Each phase is sealed off and cleaned before patients return to it. Utility work for the operatories being renovated is planned so the rest of the office keeps running, and the schedule shows each phase with its own dates so you can plan the patient calendar around it.
Before you hire anyone
Yes. Operatories, sterilization, imaging rooms and reception in Miami-Dade and Broward.
Your supplier provides them. We build each room ready for them, with utilities on their templates.
Yes. Water, air, suction, drain and power where the templates show.
Yes. At operatories, sterilization and reception.
Yes. Pulled, inspected and closed.
Yes. We tell you what can stay and what has to change.
Yes. One group of operatories at a time.
Yes. FF Builders is a Florida Certified General Contractor, licensed and insured.
One contractor
FF Builders is a Florida Certified General Contractor working across Miami-Dade and Broward. Design, structure, systems and finishes are one company, one contract and one person on the phone from the first visit to the final inspection.
Medical office build-out · Commercial build-out · Veterinary clinic build-out · Office build-out · Quartz countertops
Free in-home visit
Tell us roughly what you're thinking. We come out, measure, and leave you with a real number. No obligation, and no decision required before you book.
We got your request and will call to set the visit during business hours (Mon–Fri, 8am–6pm ET).