FF BuildersFF Builders
Hurricane strap connecting roof framing to the wall plate in Miami
Walls · Roof structure · Tie-downs · Metal stud · Blocking

Framing contractor
in South Florida.

The skeleton everything else hangs on. Framed square, tied down to High Velocity Hurricane Zone requirements, and inspected before anything covers it. Price in writing within 24 hours.

Google5.0★★★★★Licensed & insuredEngineered & permittedWritten estimate

Book your in-home visit

Free, no obligation. You don't need to have it all figured out before booking.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

5.0 ★★★★★ on GoogleLicensed Florida GCInsured every jobFirm written price

How it works

We price against what the engineering actually calls for.

Framing quotes look comparable until you check the hardware schedule. The straps, clips and hold-downs are the part an inspector spends their time on, and the part a cheap quote assumes.

  1. You reach outForm or call. We call you back to book a free visit at a time that works, evenings and Saturdays included.
  2. We read the drawingsSpan, load path and the hardware schedule. If the drawings are missing something an inspector will look for, you hear it from us before the job starts.
  3. You get the estimate in writing, within 24 hoursScope, engineering, permit and repair as separate lines, so you can see what each part costs.
  4. You decide, not the salesmanNo pressure in your living room. Read it, think about it, call when you are ready.

What we frame

Every structure we build.

Interior partitions

Wood or metal stud walls for new layouts, in houses and condo units.

Structural framing

Load carrying walls, headers, beams and posts, to the engineer's drawings.

Roof framing and trusses

Truss setting, stick framing and repairs to existing roof structure.

Additions

Full structural framing for new square footage, sill to roof.

Soffits and ceilings

Dropped ceilings, coffers and soffits framed to the drawing.

Metal stud framing

Preferred in commercial work and required by many condo associations.

Interior framing exposed in a Miami house under renovation

In the hurricane zone

The connections matter
more than the lumber.

The High Velocity Hurricane Zone is not a stricter version of the same rules, it is a different standard, and what it cares about most is the continuous load path: every member connected to the one below, all the way from roof to foundation, with hardware rated for the uplift.

That is why a framing inspection here spends its time on straps, anchors, nailing patterns and hold-downs rather than on whether the walls look good. A beautifully framed wall with the wrong strap schedule fails. A plain wall with the right one passes.

What's in the price

Square, blocked
and tied down.

Framing is a small share of a project that decides a large share of the outcome. Every finish trade after us works against what we leave.

  • Layout — walls snapped and verified against real dimensions
  • Plates and anchors — fastened to the slab per the engineering
  • Walls and openings — framed to the actual doors and windows being installed
  • Roof structure — trusses set or rafters framed, braced and tied
  • Tie-downs — straps, clips and hold-downs completing the load path
  • Blocking — for cabinets, vanities, handrails, grab bars and wall mounts
  • Trade coordination — penetrations where they are allowed, not through what carries load
  • Inspection — passed before insulation and drywall cover anything

The part that separates framers

Every crooked thing in a finished house
started here.

Cabinets that need shims to look level, a door that swings open on its own, tile that runs out of square, a ceiling line that wanders. These read as finish problems and they are almost never finish problems. They are the frame, showing through.

Homeowners

Rated 5.0 on Google.

5.0
★★★★★
Google rating · every review, five stars
Google
K Kelsey BarbosaGoogle review Google
★★★★★

We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.

S Sasha AbouGoogle review Google
★★★★★

Extremely professional company and very dedicated to their clients! Their work was impeccable and I was very pleased with their services!

G Gabriel BarbosaGoogle review Google
★★★★★

The work they did on our house was fantastic. The crew was efficient with their time and courteous with coming in and out of our home. I will recommend them to all my friends and family! Honest and great people to work with.

S sara bouGoogle review · Local Guide Google
★★★★★

Best service ever! They take care of every detail! Always on time, everything came up as I wanted. Thank you!

D deborah medel-gimenezGoogle review Google
★★★★★

The absolute best! Would definitely recommend 100%!!

M Monica BecharaGoogle review · Local Guide Google
★★★★★

They are the best! Everything was perfect. Super responsible, reliable and always on time. I recommend them 100%.

Google Business Profile rating recorded September 14, 2026. Read them on Google.

Before you hire anyone

The ones people actually ask.

Wood or metal studs?

Both. Metal is standard in commercial and required by many condo associations for interior partitions. Wood is common in residential. The building, the application and sometimes the association decide.

What is a continuous load path?

The requirement that every structural member be connected to the one below with rated hardware, roof to foundation, so storm uplift cannot separate the house at any joint. It is the core of HVHZ framing and what the inspector checks.

Does framing need its own inspection?

Yes, before insulation and drywall. It covers the structure, the connections and the hardware, and nothing gets covered until it passes.

Why does blocking matter?

Because anything heavy attached to a wall later needs something solid behind it. Installing it while the wall is open costs almost nothing. Adding it afterward means opening finished drywall.

What if a plumber cuts a structural member?

It has to be repaired to the engineer's specification, which can mean a sistered repair or a replacement. We coordinate the rough trades so penetrations happen where they are allowed.

One licensed contractor

The whole house, one contractor, one crew.

FF Builders is a Florida Certified General Contractor, not a single-trade shop with an installer list. Floors, kitchens, bathrooms, paint and carpentry are the same crew, under the same contract, with one person answering the phone from the first visit to the last inspection.

See our work

Free in-home visit

Get the structure
priced properly.

Tell us roughly what you're thinking. We come out, measure, and leave you with a real number. No obligation, and no decision required before you book.

  • A firm written price — material, labor, removal and haul-away.
  • Licensed & insured Florida crews — on every single job.
  • We call you back fast — during business hours, same or next day.

Book your in-home visit

Free, no obligation. Decide after you see the numbers.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

Mon–Fri, 8am–6pm ET · Serving Miami-Dade & Broward.