FF BuildersFF Builders
Wood framing with hurricane straps during a renovation in Aventura
Aventura · Units, houses & townhomes · Licensed GC

Framing contractor
in Aventura.

In a tower unit, a new wall goes up on a schedule the association sets and a permit the City issues. We frame to both, and price the work in writing within 24 hours.

Google5.0★★★★★Licensed & insuredPermits includedWritten estimate

Book your in-home visit

Free, no obligation. You don't need to have it all figured out before booking.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

5.0 ★★★★★ on GoogleLicensed Florida GCInsured every jobFirm written price

How it works

Every new wall
starts with the drawings.

Splitting a large room into an office, closing in a den, moving a doorway, opening a corridor. Inside a tower unit, the question is what the building allows and what the City needs to see. At a house, it is also what the walls are holding up. The visit answers both before anything is drawn.

  1. You reach outForm or call. We call back to book a free visit, evenings and Saturdays included.
  2. We walk the space with youThe layout you want, the walls that stay, what runs inside them, the ceiling height and the building's plans where they exist.
  3. You get the estimate in writing, within 24 hoursFraming, drywall, doors, the drawings the permit needs and the association package, line by line.
  4. You decideRead it, compare it, call when you are ready. Nothing starts before you sign.

What we frame in Aventura

Walls that go up
where the plan says.

New interior walls

Rooms divided, offices and dens closed in, closets built.

Openings

Doorways moved, widened or added in existing walls.

Ceilings and soffits

Dropped ceilings and soffits framed for lighting and ductwork.

Structural framing

Walls, headers and posts at houses and townhomes, to the engineer's design.

Hurricane connections

Straps and ties added or upgraded from roof to wall.

Additions

New rooms framed and tied to the original house.

Interior walls opened to the studs during a renovation in Aventura

What changes in Aventura

Two approvals,
one calendar.

Framing inside a tower on the Intracoastal is two separate conversations. The City of Aventura issues the permit and inspects the framing under the Florida Building Code. The association approves the work in writing, and that letter is part of the permit package. The City does not enforce the association's rules, so each layer has to be satisfied on its own. We prepare the package the association asks for and pull the permit.

Then comes the calendar. Studs, drywall and doors go up the service elevator, and the association sets the elevator booking, the corridor protection and the work window; we plan to it. The City does not allow construction on Sundays and holidays without prior approval from the City Manager, so the schedule is built around working days from the start. If you are away part of the year, we send photos as the framing goes up and before it is closed in.

At a house or townhome, framing is often structural. A wall that is being moved can be carrying the roof or the floor above, and the connections from roof to wall are what hold the house together when wind comes across open water. Those changes are designed by an engineer, framed to that design and inspected by the City before anything covers them. Inside a unit, the same rule holds for any wall that turns out to carry more than its own weight: it goes to the engineer before it is touched.

What's in the price

The framing,
and what lets it start.

A framing crew that shows up before the association letter and the permit are in place is a crew that gets sent home. The paperwork is part of the job.

  • Drawings — the layout drawn for the association and the City
  • Association package — the documents the association asks for, prepared for you
  • Permit — pulled with the City of Aventura
  • Framing — walls, openings, headers, ceilings and soffits
  • Engineering — structural changes designed by an engineer at houses and townhomes
  • Inspection — framing inspected by the City before drywall closes it

The part that separates framing contractors

Straight walls,
on the building's terms.

A wall can be framed well and still stop a project, if it went up outside the work window or before the association signed. Both count.

Homeowners

Rated 5.0 on Google.

5.0
★★★★★
Google rating · every review, five stars
Google
K Kelsey BarbosaGoogle review Google
★★★★★

We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.

S Sasha AbouGoogle review Google
★★★★★

Extremely professional company and very dedicated to their clients! Their work was impeccable and I was very pleased with their services!

G Gabriel BarbosaGoogle review Google
★★★★★

The work they did on our house was fantastic. The crew was efficient with their time and courteous with coming in and out of our home. I will recommend them to all my friends and family! Honest and great people to work with.

S sara bouGoogle review · Local Guide Google
★★★★★

Best service ever! They take care of every detail! Always on time, everything came up as I wanted. Thank you!

D deborah medel-gimenezGoogle review Google
★★★★★

The absolute best! Would definitely recommend 100%!!

M Monica BecharaGoogle review · Local Guide Google
★★★★★

They are the best! Everything was perfect. Super responsible, reliable and always on time. I recommend them 100%.

Google Business Profile rating recorded September 14, 2026. Read them on Google.

Before you hire anyone

The ones people actually ask.

Can I add a wall inside my condo unit?

Often, yes. It needs the association's written approval and a permit from the City. We draw the layout and prepare the package the association asks for.

Can you work on Sundays to finish sooner?

The City does not allow construction on Sundays and holidays without prior approval from the City Manager, so the schedule is planned around working days.

Who decides when the crew can use the elevator?

The association. It sets the elevator booking and the work window, and we plan the job to it.

Is the wall I want to move at my townhome structural?

The visit tells us what it seems to carry, and an engineer confirms it. If it is structural, the new framing is built to that design.

Can you upgrade the hurricane straps on my house?

Yes. We add or upgrade the connections from roof to wall, with the permit where the work requires it.

Are you licensed and insured?

Yes. FF Builders is a Florida Certified General Contractor, licensed and insured.

More in Aventura

One contractor, unit or house.

FF Builders is a Florida Certified General Contractor working across Aventura, from the towers on the Intracoastal to the homes and townhomes around the golf course. Kitchens, baths, floors, impact glass and concrete repair are the same company, with one person answering the phone from the first visit to the final inspection.

Framing · General contractor in Aventura · Layout reconfiguration in Aventura · Condo renovation in Aventura · Drywall in Aventura · Framing in Sunny Isles Beach · Framing in Golden Beach · Framing in Bal Harbour

Free in-home visit

New walls in your Aventura home, on the building's calendar.

Tell us roughly what you're thinking. We come out, measure, and leave you with a real number. No obligation, and no decision required before you book.

  • A firm written price — material, labor, removal and haul-away.
  • Licensed & insured Florida crews — on every single job.
  • We call you back fast — during business hours, same or next day.

Book your in-home visit

Free, no obligation. Decide after you see the numbers.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

Mon–Fri, 8am–6pm ET · Serving Miami-Dade & Broward.