We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.

Many canal houses here were built small and low, when the canals were dug, and owners now want more room without leaving the water. We frame the addition, the second floor or the patio roof to the engineer's drawings, and price it in writing within 24 hours.
We got your request and will call to set the visit (Mon–Fri, 8am–6pm ET).
How it works
A bedroom over the garage, a family room pushed out toward the pool, a second story on a single-story house, a covered patio framed off the back wall. Each one starts with the same questions: what the existing walls can carry, where the new loads go down, and how the frame holds against wind coming straight off the water.
What we frame in Lighthouse Point
Rooms added at the back or side of the house, framed and tied to the original.
A new floor over an existing house, framed to the engineer's design.
Patio roofs framed off the canal-side wall, strapped for wind.
Rafters and trusses replaced or added, with hurricane connections.
Walls moved, added or removed when the plan changes.
Wider openings framed for new impact windows and doors.

What changes in Lighthouse Point
On a canal lot, the water is the reason to stay. That is why so many owners in Lighthouse Point add on instead of moving: a family room toward the pool, a primary suite over the garage, a full second floor so the bedrooms look over the canal. Next to them, newer and larger houses have replaced some of the originals, and the older ones are catching up one addition at a time.
The framing of a mid-century house was not built for what is being asked of it now. Before we frame anything on top, an engineer checks the existing walls, the slab and the footings, and designs the new loads down to the ground. The side facing the canal takes wind across open water in a hurricane, so the connections there, straps, anchors and sheathing nailing, are built exactly to the drawings and left open for the City's inspection before anything is closed.
If the property is in a flood zone, an addition on an older, low house can trigger the 50% rule, and that can change the project from adding on to raising or rebuilding. We look at that with you before the design is final, not after. Material is staged at the street and moved in through the side yard; the pool deck, the screen and the dock stay clear. The permit is pulled with the City.
What's in the price
Framing is the part of the house you stop seeing once the drywall is up. The estimate lists what goes inside it.
The part that separates framing contractors
A frame that looks right and is missing connections passes nobody's inspection, and on the canal side it is the first thing a storm finds.
Homeowners
We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.
Extremely professional company and very dedicated to their clients! Their work was impeccable and I was very pleased with their services!
The work they did on our house was fantastic. The crew was efficient with their time and courteous with coming in and out of our home. I will recommend them to all my friends and family! Honest and great people to work with.
Best service ever! They take care of every detail! Always on time, everything came up as I wanted. Thank you!
The absolute best! Would definitely recommend 100%!!
They are the best! Everything was perfect. Super responsible, reliable and always on time. I recommend them 100%.
Google Business Profile rating recorded September 14, 2026. Read them on Google.
Before you hire anyone
Often, with work. The engineer checks the walls, slab and footings first, and the answer comes with what has to be reinforced.
If the property is in a flood zone, it can. We look at the numbers with you before the design is final, so you can decide between adding on, raising or rebuilding.
That side faces open water and takes the wind first in a storm. Straps, anchors and nailing there are built exactly to the drawings and inspected before they are covered.
Yes. It is framed off the existing wall, strapped for wind and permitted with the City.
Yes. We pull it with the City, and the frame stays open until it passes inspection.
Yes. FF Builders is a Florida Certified General Contractor, licensed and insured.
More in Lighthouse Point
FF Builders is a Florida Certified General Contractor working across Lighthouse Point, from the homes on the canals to the condos and storefronts on Federal Highway. Kitchens, baths, impact glass, additions and build-outs are the same company, with one person answering the phone from the first visit to the final inspection.
Framing · General contractor in Lighthouse Point · Second story additions in Lighthouse Point · Home additions in Lighthouse Point · Covered patios in Lighthouse Point · Framing in Hillsboro Beach · Framing in Lauderdale-by-the-Sea
Free in-home visit
Tell us roughly what you're thinking. We come out, measure, and leave you with a real number. No obligation, and no decision required before you book.
We got your request and will call to set the visit during business hours (Mon–Fri, 8am–6pm ET).