FF BuildersFF Builders
Hurricane strap connecting roof framing to the wall in a Parkland home
Parkland · Lofts, additions & guest houses · Licensed GC

Framing contractor
in Parkland.

A loft that should be a bedroom, a two-story family room that could hold an office above it, a guest house at the back of an estate lot. In a Parkland home it all starts with framing, and we price it in writing within 24 hours.

Google5.0★★★★★Licensed & insuredPermits includedWritten estimate

Book your in-home visit

Free, no obligation. You don't need to have it all figured out before booking.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

5.0 ★★★★★ on GoogleLicensed Florida GCInsured every jobFirm written price

How it works

Space you already have,
or space you add?

Many Parkland houses have room that is not working: a loft at the top of the stairs, air over a two-story family room, a bonus room with no door. Framing inside that space usually goes to the City and stops there. Framing that changes the outside usually goes through your association first, or, on an estate lot without one, straight to the City. The visit sorts out which one you have.

  1. You reach outForm or call. We call back to book a free visit, evenings and Saturdays included.
  2. We look at the structureWhat is block and what is wood, where the floor and roof trusses bear, how the roof ties to the walls, and what the new framing has to connect to.
  3. You get the estimate in writing, within 24 hoursThe framing, the engineering, the connections, the permit and what your association will want to see, line by line.
  4. You decideRead it, compare it, call when you are ready. Nothing starts before you sign.

What we frame in Parkland

New rooms,
inside and out.

Lofts and bonus rooms

Open lofts closed in with walls and a door, as a bedroom, a study room or an office.

Floors over open-to-below

A new floor framed across a two-story space, to the engineer's design.

Structural framing

Headers, beams and posts where a wall comes out or an opening widens.

Additions

Walls, floor and roof framing for a new wing, tied into the house.

Guest houses

The frame of a detached guest house on an estate lot.

Covered patios

A roof over the back of the house, framed to carry wind loads.

Interior framing exposed in a Parkland house under renovation

What changes in Parkland

Big houses,
and space that is not working.

Many Parkland houses were built with volume: a two-story entry, a family room open to the floor above, a loft at the top of the stairs. It looks good on the day of delivery. Years later, with children in school, families want a bedroom for each kid, a quiet room for homework, an office with a door that closes. Most of that is framing inside the house, which your association usually has nothing to review. Framing a floor across an open-to-below space is structural, though, so an engineer designs it, and the City of Parkland permits and inspects it.

Framing that reaches the outside is another job, and in Parkland it splits by address. Inside a gated community, an addition, a closed-in patio or a solid roof over the pool changes how the house looks from the lake or the street, so the architectural review of your association usually sees it before the City does. We prepare the drawings and the descriptions that review asks for, and the roof line and finishes are chosen to match the house. On an estate lot along the ranch roads, a wing or a guest house is often a conversation with the City alone; check with the City on what your zoning allows.

Parkland is inland, but hurricane wind reaches it all the same. New framing is built to the engineer's drawings and current wind requirements: straps and connectors from the roof down to the foundation, headers sized for the load, and every connection where the inspector can see it before the walls close. When we open an older wall and find framing that falls short of that, the estimate says so in writing.

What's in the price

The frame,
ready for the next trade.

Framing is the part of a project that disappears behind drywall. The estimate covers what goes in before that happens, and the inspection that proves it.

  • Engineering — drawings and connection details for anything structural
  • Demolition — the old walls, railing or ceiling opened where the new framing goes
  • Framing — studs, headers, beams, floor framing, posts and roof framing
  • Hurricane connections — straps, clips and anchors to the engineer's design
  • Inspection — framing inspection with the City of Parkland before the walls close
  • Close-up — drywall and finishes when the framing is part of a larger job

The part that separates framing contractors

Every connection
where it can be seen.

A new floor over a family room can look level and still be missing the hanger that carries it. The inspection catches it only while the framing is still open.

Homeowners

Rated 5.0 on Google.

5.0
★★★★★
Google rating · every review, five stars
Google
K Kelsey BarbosaGoogle review Google
★★★★★

We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.

S Sasha AbouGoogle review Google
★★★★★

Extremely professional company and very dedicated to their clients! Their work was impeccable and I was very pleased with their services!

G Gabriel BarbosaGoogle review Google
★★★★★

The work they did on our house was fantastic. The crew was efficient with their time and courteous with coming in and out of our home. I will recommend them to all my friends and family! Honest and great people to work with.

S sara bouGoogle review · Local Guide Google
★★★★★

Best service ever! They take care of every detail! Always on time, everything came up as I wanted. Thank you!

D deborah medel-gimenezGoogle review Google
★★★★★

The absolute best! Would definitely recommend 100%!!

M Monica BecharaGoogle review · Local Guide Google
★★★★★

They are the best! Everything was perfect. Super responsible, reliable and always on time. I recommend them 100%.

Google Business Profile rating recorded September 14, 2026. Read them on Google.

Before you hire anyone

The ones people actually ask.

Can you turn the loft upstairs into a bedroom?

Usually, yes. It takes walls, a door, sometimes a window and the right electrical and air. If it needs a window in an exterior wall, your association may want to see it. The City of Parkland permit is pulled either way.

Can you add a floor over our two-story family room?

Often. It is structural, so an engineer designs the floor framing and where it bears, and we build to that design. The visit tells you what the existing walls can carry.

We are on an estate lot with no association. Who approves a guest house frame?

The City of Parkland, through the permit. Check with the City on what your zoning allows on the lot before the design is finished; the plan is built around that answer.

Do I need an engineer?

For anything structural, yes: headers, beams, floors over open space, additions and roof framing. We coordinate the engineer and build to the drawings.

How long does framing take?

It depends on the size of the job, the engineering and the review your association does, if any. You get a realistic timeline in writing with the estimate.

Are you licensed and insured?

Yes. FF Builders is a Florida Certified General Contractor, licensed and insured.

More in Parkland

One contractor for the whole house.

FF Builders is a Florida Certified General Contractor working across Parkland, from the gated communities on the lakes to the estate lots on the ranch roads and the offices on Hillsboro Boulevard. Kitchens, baths, impact glass, additions and build-outs are the same company, with one person answering the phone from the first visit to the final inspection.

Framing · General contractor in Parkland · Layout reconfiguration in Parkland · Guest houses in Parkland · Home additions in Parkland · Framing in Weston · Framing in Southwest Ranches

Free in-home visit

The room your Parkland family needs, framed right.

Tell us roughly what you're thinking. We come out, measure, and leave you with a real number. No obligation, and no decision required before you book.

  • A firm written price — material, labor, removal and haul-away.
  • Licensed & insured Florida crews — on every single job.
  • We call you back fast — during business hours, same or next day.

Book your in-home visit

Free, no obligation. Decide after you see the numbers.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

Mon–Fri, 8am–6pm ET · Serving Miami-Dade & Broward.