We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.

In the Village, new space is built onto the house, not beside it. That makes the framing the joint between old and new, and the part a hurricane tests first. We frame it, tie it in, and price it in writing within 24 hours.
We got your request and will call to set the visit (Mon–Fri, 8am–6pm ET).
How it works
Most framing questions here are about a connection: a new room against an existing wall, a new roof meeting the old one, a wall moved inside the house. The visit opens that question first, because it decides the engineering and the price.
What we frame in Sea Ranch Lakes
Walls, floor and roof framed onto the existing house and tied into its structure.
A new floor framed over the existing one, with the load carried down to the foundation.
Walls moved, added or removed when the layout changes.
Headers, posts and beams where openings get wider.
Rafters and trusses for new roof sections and repairs.
Straps, clips and anchors from the roof down to the foundation.

What changes in Sea Ranch Lakes
The Village code does not allow a separate building on a residential lot: no studio in the yard, no stand-alone office. Every square foot an owner adds attaches to the house, and the garage the code requires stays. For framing, that means the hard part is rarely the new walls themselves. It is the line where they meet the existing structure: the old wall that now carries a new roof, the floor that has to land level with the room next to it, the roof connection that has to shed water and resist wind as one piece. Additions attach to the house; check with the Village on what your lot allows, including the limit on height.
That joint is also where a storm looks for weakness. On the Intracoastal, wind comes across open water; around the lakes, the exposure is different but still real. The framing is designed with a continuous load path, straps and anchors from the roof down to the foundation, so the new section and the old house hold together. If the property is in a flood zone, the FEMA 50% rule may apply to a large addition, and we raise it at the visit.
Framing in the Village also depends on how the material arrives. Lumber, trusses and connectors come in on trucks that enter through the gatehouse, so we coordinate crews and deliveries through the gate before the job starts and stage the material on your lot instead of on the private street. Where the addition changes how the house looks, check with the Village, and with the Beach Club's committee where it applies.
What's in the price
Framing is only as good as its connections, and every connection is inspected.
The part that separates framing contractors
A new room can be framed perfectly and still fail at the seam with the old house. The tie-in is designed and inspected, not improvised on site.
Homeowners
We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.
Extremely professional company and very dedicated to their clients! Their work was impeccable and I was very pleased with their services!
The work they did on our house was fantastic. The crew was efficient with their time and courteous with coming in and out of our home. I will recommend them to all my friends and family! Honest and great people to work with.
Best service ever! They take care of every detail! Always on time, everything came up as I wanted. Thank you!
The absolute best! Would definitely recommend 100%!!
They are the best! Everything was perfect. Super responsible, reliable and always on time. I recommend them 100%.
Google Business Profile rating recorded September 14, 2026. Read them on Google.
Before you hire anyone
The Village code does not allow a separate building on a residential lot, so added space attaches to the house. We can frame an addition or a home office as part of the house; check with the Village on what your lot allows.
The new section is framed and connected to current code, and the tie-in to the existing structure is engineered so both parts work together.
For structural framing, additions and roof work, yes. We coordinate the engineering and the permit with the Village.
Through the gate. We coordinate crews and deliveries through the gate before the job starts and stage the material on your lot.
It depends on the size and the structure. You get a written estimate within 24 hours of the visit.
Yes. FF Builders is a Florida Certified General Contractor, licensed and insured.
More in Sea Ranch Lakes
FF Builders is a Florida Certified General Contractor working across Sea Ranch Lakes, from the homes on the Intracoastal and around the lakes to the shopping center on A1A. Kitchens, baths, impact glass, additions and build-outs are the same company, with one person answering the phone from the first visit to the final inspection.
Framing · General contractor in Sea Ranch Lakes · Home additions in Sea Ranch Lakes · Second story additions in Sea Ranch Lakes · Roof truss repair in Sea Ranch Lakes · Framing in Lauderdale-by-the-Sea · Framing in Lighthouse Point
Free in-home visit
Tell us roughly what you're thinking. We come out, measure, and leave you with a real number. No obligation, and no decision required before you book.
We got your request and will call to set the visit during business hours (Mon–Fri, 8am–6pm ET).