FF BuildersFF Builders
Interior opened to the studs after selective demolition
Coconut Grove · Selective & full gut · Permitted

Interior demolition
in Coconut Grove.

On a Grove street, the hard part of demolition is often getting the debris out: no driveway room, no sidewalk, a big tree over the curb. We plan that and the demo itself, with the price in writing within 24 hours.

Google5.0★★★★★Licensed & insuredPermits includedWritten estimate

Book your in-home visit

Free, no obligation. You don't need to have it all figured out before booking.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

5.0 ★★★★★ on GoogleLicensed Florida GCInsured every jobFirm written price

How it works

Where does the dumpster go?

Many Coconut Grove streets are narrow and winding, with no sidewalk and cars parked on the edge. A dumpster that sits easily in a suburban driveway may not fit at all, and a truck hauling it away can block the whole street. The visit answers that first: where a container can sit, where it would hit a low branch, and how the debris gets from the room to the street.

  1. You reach outForm or call. We call back to book a free visit, evenings and Saturdays included.
  2. We walk the house and the streetWhat comes out, what stays, the route for the debris and where a container or truck can go.
  3. You get the estimate in writing, within 24 hoursProtection, demolition, debris removal, haul-off and the permit, item by item.
  4. You decideRead it, compare it, call when you are ready. Nothing starts before you sign.

What we build in Coconut Grove

Out with care, ready to rebuild.

Kitchen and bath tear-outs

The room taken down to what stays.

Full gut

The house opened to the structure for a full renovation.

Wall removal

Walls taken out, with beams where they carry load.

Commercial strip-out

Shops and offices on Grand Avenue and Main Highway cleared for the next tenant.

Condo demolition

Units in Bayshore buildings, with the association's rules.

The rebuild after

The same company puts it back together.

Interior framing exposed after demolition in a house under renovation

What changes in Coconut Grove

Narrow street,
old walls.

On a street with room to spare, debris goes into a big container in the driveway. In much of the Grove we work with smaller containers swapped more often, or a truck loaded and driven off the same day, scheduled so the street stays open. Low branches over the curb decide where a container can be dropped, and the neighbors hear from us before the first load leaves.

Inside, a Grove house that was added to over the years hides surprises behind every wall. One room can be wood frame, the next block, the next coral stone. A wall that looks like a partition can be carrying the roof of an old addition. Pipes and wires can run in places no plan shows. So the demolition is selective until we know what each wall does: we open, look, and only then take it down. Where a wall carries load, it is shored and replaced with a beam.

Older houses can also have materials that need testing before they are disturbed, such as old plaster, flooring or pipe insulation. They are tested where it is called for before the work, so the schedule and the price do not change halfway through.

What's in the price

The demolition,
street to studs.

One contract, one contact, and the rebuild in the same hands.

  • Street and access plan — container, truck and debris route set for the block
  • Protection — floors, rooms and anything staying covered and sealed
  • Selective demolition — walls opened and checked before they come down
  • Shoring where needed — temporary support for load-bearing walls
  • Debris and haul-off — removed and disposed of, the site left clean
  • Permit and inspections — pulled with the City of Miami, inspected and closed

The part that separates demolition crews here

A sledgehammer
is not a survey.

Fast demolition in an old Grove house is how a hidden load-bearing wall, a live pipe or a coral stone wall gets damaged. Careful demolition costs less than the repair.

Homeowners

Rated 5.0 on Google.

5.0
★★★★★
Google rating · every review, five stars
Google
K Kelsey BarbosaGoogle review Google
★★★★★

We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.

S Sasha AbouGoogle review Google
★★★★★

Extremely professional company and very dedicated to their clients! Their work was impeccable and I was very pleased with their services!

G Gabriel BarbosaGoogle review Google
★★★★★

The work they did on our house was fantastic. The crew was efficient with their time and courteous with coming in and out of our home. I will recommend them to all my friends and family! Honest and great people to work with.

S sara bouGoogle review · Local Guide Google
★★★★★

Best service ever! They take care of every detail! Always on time, everything came up as I wanted. Thank you!

D deborah medel-gimenezGoogle review Google
★★★★★

The absolute best! Would definitely recommend 100%!!

M Monica BecharaGoogle review · Local Guide Google
★★★★★

They are the best! Everything was perfect. Super responsible, reliable and always on time. I recommend them 100%.

Google Business Profile rating recorded September 14, 2026. Read them on Google.

Before you hire anyone

The ones people actually ask.

My street is too narrow for a dumpster. Now what?

We use a smaller container swapped more often, or a truck loaded and hauled the same day. It is planned for your block at the visit.

Do I need a permit for interior demolition?

In most cases, yes, especially when walls, plumbing or wiring are involved. The permit comes from the City of Miami, and we pull it.

What if you find something unexpected behind the walls?

We stop, show you what we found and explain the options before going on. Selective demolition is how we find it early.

Can you demolish inside a condo on South Bayshore?

Yes, following the association's rules: approved plans, COI, hours and the service elevator.

How much does interior demolition cost?

It depends on the size, the access and the haul-off. You get the price in writing within 24 hours of the visit.

Are you licensed and insured?

Yes. FF Builders is a Florida Certified General Contractor, licensed and insured.

More in Coconut Grove

One contractor, old house or new.

FF Builders is a Florida Certified General Contractor working across Coconut Grove, from old cottages under the canopy to new homes and bayfront condos. Kitchens, baths, additions, windows and structural work are the same company, with one person answering the phone from the first visit to the final inspection.

Interior demolition · General contractor in Coconut Grove · Load-bearing wall removal in Coconut Grove · Whole-house gut renovation in Coconut Grove · Remodeling in Coconut Grove · Interior demolition in Coral Gables · Interior demolition in Pinecrest · Interior demolition in South Miami

Free in-home visit

Demolition that leaves the house ready to rebuild.

Tell us roughly what you're thinking. We come out, measure, and leave you with a real number. No obligation, and no decision required before you book.

  • A firm written price — material, labor, removal and haul-away.
  • Licensed & insured Florida crews — on every single job.
  • We call you back fast — during business hours, same or next day.

Book your in-home visit

Free, no obligation. Decide after you see the numbers.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

Mon–Fri, 8am–6pm ET · Serving Miami-Dade & Broward.