FF BuildersFF Builders
Interior opened to the studs after selective demolition in a Weston home
Weston · Gated streets · Clean and controlled

Interior demolition
in Weston.

Inside the house, the association usually has no say. At the gate, in the driveway and on the street, it does. We plan the demolition for both and price it within 24 hours.

Google5.0★★★★★Licensed & insuredPermits includedWritten estimate

Book your in-home visit

Free, no obligation. You don't need to have it all figured out before booking.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

5.0 ★★★★★ on GoogleLicensed Florida GCInsured every jobFirm written price

How it works

The gate comes first.

Demolition inside a Weston home is quiet work for the city and loud work for the street. The crew comes through a gate, the dumpster sits in a driveway the neighbors see every day, and trucks share the road with school buses and families walking. Your association usually has rules for contractors, hours and where a dumpster can go. The visit starts with those, then with the walls.

  1. You reach outForm or call. We call back to book a free visit, evenings and Saturdays included.
  2. We look at the house and the streetWhat comes out, what stays and has to be protected, the walls that may be structural, the driveway for the dumpster, and your association's rules for contractors.
  3. You get the estimate in writing, within 24 hoursProtection, demolition, haul-off, dumpster, testing if needed, cleanup, and the permit, item by item.
  4. You decideRead it, compare it, call when you are ready. Nothing starts before you sign.

What we do in Weston

Out cleanly, ready to build.

Kitchen or bath tear-out

Cabinets, tile and fixtures out down to the studs.

Full gut

The house opened to the frame for a full renovation.

Wall removal

Partition and bearing walls out, with a beam where needed.

Flooring removal

Tile, carpet and wood out, the slab ready for the new floor.

Commercial strip-out

A unit or office stripped for the next build-out.

Interior framing exposed after demolition in a Weston house under renovation

What changes in Weston

Quiet street,
loud house.

Most of what we do before the first wall comes down happens outside the house. We read your association's rules for contractors: how the crew gets through the gate, the hours work is allowed, where a dumpster can sit and for how long, and whether it needs a cover. We plan the dumpster, the deliveries and the haul-off around them, and keep the driveway and the street clean at the end of each day. Neighbors in a gated community notice a messy job long before they notice a good one.

Inside, the demolition is selective. In a house built from the eighties on, the kitchen and baths are often original, with tile set in mortar, cabinets glued to the walls and plumbing in the slab. We protect what stays, floors, stairs, the rooms you still live in, seal the work area with plastic and keep the dust out of the air system. Before we remove any wall, we confirm whether it carries load, and if it does, the engineer and the shoring come first.

Some houses hide older materials in textured ceilings, old flooring adhesive or joint compound. When the house and the material call for it, we test before we cut, so the demolition stays safe for the crew and for the family. Demolition alone in a house is rarely the end goal. It is the first step of the kitchen, the baths or the full renovation that comes next, and with us it is the same company and the same contact all the way through.

What's in the price

The demolition,
gate to haul-off.

One contract, one contact, and a street that stays clean.

  • Rules check — your association's rules for contractors, hours and dumpsters read first
  • Protection — floors, stairs and rooms that stay, sealed off
  • Dust control — work area sealed, air system protected
  • Structure check — bearing walls confirmed before removal
  • Haul-off — dumpster placed by the rules, debris removed
  • Permit and inspections — pulled with the City of Weston when the work needs one

The part that separates demolition crews here

The neighbors
notice first.

In a gated community, a dumpster in the wrong place or a crew at the wrong hour is a letter from the association before it is a problem with the work.

Homeowners

Rated 5.0 on Google.

5.0
★★★★★
Google rating · every review, five stars
Google
K Kelsey BarbosaGoogle review Google
★★★★★

We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.

S Sasha AbouGoogle review Google
★★★★★

Extremely professional company and very dedicated to their clients! Their work was impeccable and I was very pleased with their services!

G Gabriel BarbosaGoogle review Google
★★★★★

The work they did on our house was fantastic. The crew was efficient with their time and courteous with coming in and out of our home. I will recommend them to all my friends and family! Honest and great people to work with.

S sara bouGoogle review · Local Guide Google
★★★★★

Best service ever! They take care of every detail! Always on time, everything came up as I wanted. Thank you!

D deborah medel-gimenezGoogle review Google
★★★★★

The absolute best! Would definitely recommend 100%!!

M Monica BecharaGoogle review · Local Guide Google
★★★★★

They are the best! Everything was perfect. Super responsible, reliable and always on time. I recommend them 100%.

Google Business Profile rating recorded September 14, 2026. Read them on Google.

Before you hire anyone

The ones people actually ask.

Does my association need to approve interior demolition?

Work inside the house usually does not need approval, but the association's rules for contractors, hours and dumpsters still apply. We read them before we start.

Where does the dumpster go?

Where your association's rules allow it, usually the driveway. We plan the size, the time it stays and the haul-off around those rules.

Will there be dust in the rest of the house?

We seal the work area, protect the air system and clean up each day. Rooms you still use stay closed off from the work.

Do I need a permit for demolition in Weston?

It depends on the scope. Structural work and work tied to a renovation usually do. We check with the City and pull it when needed.

How much does interior demolition cost?

It depends on what comes out, the haul-off and the protection. You get the price in writing within 24 hours of the visit.

Are you licensed and insured?

Yes. FF Builders is a Florida Certified General Contractor, licensed and insured.

More in Weston

One contractor for the whole house.

FF Builders is a Florida Certified General Contractor working across Weston, from the homes on the lakes to the condos in Bonaventure and the offices on Commerce Parkway. Kitchens, baths, impact glass, additions and build-outs are the same company, with one person answering the phone from the first visit to the final inspection.

Interior demolition · General contractor in Weston · Whole-house gut renovation in Weston · Load-bearing wall removal in Weston · Kitchen remodeling in Weston · Interior demolition in Southwest Ranches · Interior demolition in Parkland

Free in-home visit

A clean start, and a clean street.

Tell us roughly what you're thinking. We come out, measure, and leave you with a real number. No obligation, and no decision required before you book.

  • A firm written price — material, labor, removal and haul-away.
  • Licensed & insured Florida crews — on every single job.
  • We call you back fast — during business hours, same or next day.

Book your in-home visit

Free, no obligation. Decide after you see the numbers.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

Mon–Fri, 8am–6pm ET · Serving Miami-Dade & Broward.