FF BuildersFF Builders
Remodeled kitchen with white cabinets and a marble-look stone island in a South Florida house
Cabinets · Stone counters · Islands · Full remodels

Kitchen remodeling
in South Florida.

A kitchen is cabinetry, stone, plumbing and electrical that all have to agree with each other, in the room the whole house runs through. We come to your house within 24 hours, walk it with you, and send a written proposal. No number over the phone, no pressure at your counter.

Google5.0★★★★★Licensed Florida GCVisit within 24 hoursWritten proposal

Book your in-home visit

Free, no obligation. You don't have to pick cabinets before booking.

Or call now: (954) 249-6940

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

5.0 ★★★★★ on GoogleLicensed Florida GCInsured every jobPermits handled

How it works

We come out within 24 hours. The proposal comes in writing.

Nobody can price a kitchen from a photo. What moves, what the walls hide and what you pick decide the job, so we look first and write second.

  1. You reach outForm or call. We call you back and come out within 24 hours, at a time that works, evenings and Saturdays included.
  2. We walk the room with youLayout, where the water and power are, what has to come out, the appliances you are keeping, and how you actually use the room.
  3. You get a written proposalScope, materials and options side by side, sent as soon as it is ready. We do not guess at it over the phone, and we do not pad it.
  4. You decide, not the salesmanNo pressure in your hallway. Read it, think about it, call when you're ready.

What we do

Every kitchen we build.

Full kitchen remodel

Down to the walls and back: cabinets, stone, backsplash, plumbing, electrical, floors, light. One crew, one written proposal, one end date.

Cabinets & storage

Set level and plumb first, because everything else sits on them. Fillers, panels and toe kicks finished so it reads as one piece of furniture.

Countertops: quartz, marble, porcelain

Templated on site after the cabinets are in, so seams land where you agreed and the overhang is what you asked for.

Islands & layout changes

The island with power and a sink, the wall that comes down, the range that moves. Where a licensed GC and inspected trades matter.

Backsplash, lighting & electrical

Outlets where you cook, not where the old ones were. Under-cabinet light, pendants over the island, the hood vented right.

Floors that run through

The kitchen is already open, so the new floor can keep going. Large-format porcelain, stone or wood through the whole main level.

Kitchen remodeling, before & after

Same kitchen. New everything.

Same room, same camera, same light. Drag the handle to compare.

Dated 1990s kitchen with oak cabinets, laminate counters and a fluorescent box light Same kitchen remodeled with white shaker cabinets, a quartz island and pendant lights BeforeAfter
Family kitchen, 1994 house
Dated 1960s galley kitchen Same galley kitchen remodeled and opened up BeforeAfter
Galley kitchen, 1960s house
Builder-grade 2000s kitchen with cherry cabinets and granite Same kitchen remodeled with light cabinets and quartz BeforeAfter
Kitchen, 2005 house

Whole-home remodels

When the kitchen is part of a bigger change.

Three houses, filmed by us from demolition to the last coat: floors, kitchens, bathrooms, paint. Same crew that does the single room.

What's in the proposal

The whole job,
not just the pretty part.

The proposal covers everything below. If something behind a wall changes the plan once we open it, you hear it before we do it, not on the invoice.

  • Demolition and haul-away — old cabinets, counters, backsplash and appliances out
  • Cabinets — set level and plumb, fillers and panels finished
  • Countertops — templated after the cabinets are in, installed and sealed
  • Plumbing and electrical — rough-in and finish by licensed trades, inspected
  • Backsplash, lighting and appliances — installed and connected
  • Permits and inspections — pulled and passed where the work needs them
  • Dust control and cleanup — work area sealed, cleaned daily, and a final clean before hand-over

The part that separates kitchen contractors

Cabinets, stone and wiring have to agree before anything is ordered.

Most kitchen delays are sequencing, not craft: stone templated before the cabinets were level, an outlet where the hood needed to go, an island with no power. We plan the room in the order the trades actually work, and we order in that order.

Homeowners

Rated 5.0 on Google.

5.0
★★★★★
Google rating · every review, five stars
Google
K Kelsey BarbosaGoogle review Google
★★★★★

We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.

S Sasha AbouGoogle review Google
★★★★★

Extremely professional company and very dedicated to their clients! Their work was impeccable and I was very pleased with their services!

G Gabriel BarbosaGoogle review Google
★★★★★

The work they did on our house was fantastic. The crew was efficient with their time and courteous with coming in and out of our home. I will recommend them to all my friends and family! Honest and great people to work with.

S sara bouGoogle review · Local Guide Google
★★★★★

Best service ever! They take care of every detail! Always on time, everything came up as I wanted. Thank you!

D deborah medel-gimenezGoogle review Google
★★★★★

The absolute best! Would definitely recommend 100%!!

M Monica BecharaGoogle review · Local Guide Google
★★★★★

They are the best! Everything was perfect. Super responsible, reliable and always on time. I recommend them 100%.

Google Business Profile rating recorded September 14, 2026. Read them on Google.

Before you hire anyone

The ones people actually ask.

Can you price my kitchen over the phone?

No, and nobody honestly can. The price depends on what moves, what the walls hide, which cabinets and stone you pick and how the electrical and plumbing have to change. We come to the house within 24 hours, walk the room with you, and then write the proposal.

How long does a kitchen remodel take?

Weeks, and the cabinets set the calendar more than the crew does. What we commit to is a start date and an end date in writing before we begin, sequenced so the stone is templated after the cabinets are in, not from a drawing.

Can I keep my layout?

Yes, and it is the fastest and least expensive way to get a new kitchen, because the plumbing and most of the electrical stay where they are. If you want the island moved or a wall opened, we tell you at the visit what that changes.

Do you move plumbing and electrical?

Yes. A new island with power, a range moved to another wall, a sink under the window. Plumbing and electrical are done by licensed trades and inspected, under our General Contractor license.

Which countertops do you install?

Quartz, natural marble and granite, and porcelain slab. Each one is templated on site after the cabinets are set and leveled, so the seams land where you agreed and the overhang is what you asked for.

Do you handle permits and inspections?

Yes. FF Builders is a Florida Certified General Contractor, license CGC1524051. Where the work needs a permit, we pull it, schedule the inspections and pass them before the walls close.

Are you licensed and insured?

Yes. Florida Certified General Contractor, license CGC1524051, with liability insurance on every job. We can send the certificate before we start.

Do you only do kitchens?

No. FF Builders is a Florida Certified General Contractor: bathrooms, floors, paint, carpentry and whole-home remodels are done by the same crew under the same license. The kitchen is the job you called about, and it is the only thing we will talk about unless you bring up something else.

One licensed contractor

The whole house, one license, one crew.

FF Builders is a Florida Certified General Contractor, not a cabinet shop with an installer list. Kitchens, bathrooms, floors, paint and carpentry are the same crew, under the same license, with one person answering the phone from the first visit to the last inspection.

See our work

Free in-home visit

We come out within 24 hours. Then you get it in writing.

Tell us roughly what you are thinking. We come out within 24 hours, walk the kitchen with you, and send a written proposal. No obligation, and no cabinet decision required before you book.

  • A written proposal — scope, materials and options, nothing hidden.
  • Licensed Florida General Contractor — CGC1524051, insured on every job.
  • We call you back fast — during business hours, same or next day.

Book your in-home visit

Free, no obligation. You don't have to pick cabinets before booking.

Or call now: (954) 249-6940

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

Mon–Fri, 8am–6pm ET · Serving Miami-Dade & Broward.