How it works
High-end renovations go wrong in the gaps between trades. We walk the whole house with you and your designer and plan it as one project, in the right order.
What we renovate
Walls opened with steel beams, rooms reconfigured.
Custom cabinetry, stone and integrated appliances.
Marble, curbless showers, freestanding tubs.
Floors and walls set flat, veining laid out.
Built-ins, paneling, closets and ceilings.
Large openings to the water and the garden.

Where luxury is decided
Two houses can have the same marble and the same cabinets and look completely different. The difference is execution: floors leveled before stone, veining laid out before cutting, millwork scribed to the wall, transitions planned at every doorway.
Many luxury renovations start with structure: opening a wall for a steel beam, raising a ceiling, enlarging an opening for a wall of glass. That work is engineered and permitted, and done before anything beautiful goes in.
We work from your architect's and designer's drawings and bring the questions early: what the structure allows, what the lead times are, what will change the schedule. Surprises are found on paper, not on site.
Owners of high-end homes are often away. The job is run with regular updates and photos, and one person answers for it from start to finish.
What's in the price
One contract and one standard for every room.
The part that separates luxury builders
At this level, everyone uses beautiful materials. What you are paying for is how they are put together, and whether the schedule holds.
Homeowners
We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.
Extremely professional company and very dedicated to their clients! Their work was impeccable and I was very pleased with their services!
The work they did on our house was fantastic. The crew was efficient with their time and courteous with coming in and out of our home. I will recommend them to all my friends and family! Honest and great people to work with.
Best service ever! They take care of every detail! Always on time, everything came up as I wanted. Thank you!
The absolute best! Would definitely recommend 100%!!
They are the best! Everything was perfect. Super responsible, reliable and always on time. I recommend them 100%.
Google Business Profile rating recorded September 14, 2026. Read them on Google.
Before you build
Finish level and detail more than square footage: natural stone, custom millwork, large impact glass openings, structural changes and the lead times of imported materials. Two renovations of the same size can cost very different amounts depending on these choices.
Longer than people expect, mostly because of design, engineering, permits and lead times, not construction days. Ordering long-lead items early is what keeps the schedule. You get a realistic timeline in writing.
Yes. Most of our high-end projects are designed by them. We build from their drawings, raise questions early, and coordinate shop drawings for millwork, stone and glass.
Opening walls with steel beams, raising ceilings, enlarging openings for walls of glass to the water, and reworking layouts. All of it is engineered, shored and permitted.
With mock-ups of key details, inspections at each phase before the next trade covers the work, and a final punch list walked with you. In luxury work, the inspection before the drywall closes is as important as the finish.
High-end homes are full of materials that do not forgive: marble floors, custom millwork, imported doors. Floors that stay are covered with rigid protection, not just paper. Stairs, door frames and finished walls are wrapped, and dust barriers with negative air keep fine dust out of the rooms that are already done.
Protection is checked every day, and it stays until the final cleaning. Repairing a scratched marble floor costs more than protecting it for the whole job.
Imported stone, custom windows and doors, specialty plumbing fixtures and designer lighting can take months to arrive. In a high-end renovation, the order date often decides the finish date more than the construction itself.
We build the procurement schedule with the design team at the start, order long lead items as soon as they are approved, and inspect deliveries on arrival. A wrong or damaged slab found on delivery day is a delay. Found on installation day, it is a crisis.
Waterfront homes face salt air, wind and in many cases flood zone requirements that affect what can be built and how. Metals corrode faster, so railings, hardware and exterior fixtures need marine grade or coated materials. Windows and doors must carry the product approval the code requires for the location.
In some homes, the size of the renovation also triggers flood requirements for the whole house. We review this early with the architect, before the design is finished, so the project is not redesigned halfway through.
Lighting control, shades, security, networking and audio all need wiring and backing installed while walls and ceilings are open. We build the rough-in to the systems design: pathways, boxes, recessed shade pockets and equipment space, coordinated with the electrical layout.
The control equipment itself usually comes from the client's systems provider. Our job is to make sure every wire, box and pocket is exactly where it needs to be before drywall closes.
Look at finished work in person, not only photos. Ask how they handle details like millwork alignment, stone layout and paint finish in raking light. Ask who will be on site every day, and how often you or your architect will receive updates.
Then compare estimates line by line. A high-end renovation estimate should show every room and every allowance. A short estimate is not cheaper, it simply moves the cost into change orders later.
Before you hire anyone
Yes. We build from their drawings and coordinate the details with them.
Yes. Structural changes are engineered, shored and permitted.
Sometimes, with phasing. In whole-home renovations most owners move out for the main phase.
Yes, with regular updates and photos and one point of contact.
It depends on scope and lead times. You get a realistic timeline in writing with the estimate.
Yes, with materials and details chosen for salt air and storms.
Yes, when the house is occupied or the budget is split over time.
Yes. FF Builders is a Florida Certified General Contractor, licensed and insured.
One contractor
FF Builders is a Florida Certified General Contractor working across Miami-Dade and Broward. Design, structure, systems and finishes are one company, one contract and one person on the phone from the first visit to the final inspection.
Home remodeling · Marble and stone · Wine cellars · Load bearing wall removal
Free in-home visit
Tell us roughly what you're thinking. We come out, measure, and leave you with a real number. No obligation, and no decision required before you book.
We got your request and will call to set the visit during business hours (Mon–Fri, 8am–6pm ET).