FF BuildersFF Builders
Pool deck behind a Bay Colony home
Bay Colony · Travertine & pavers · Licensed

Pool decks
in Bay Colony.

Replacing a pool deck starts with tearing out the old one, and on a canal lot that happens a few steps from the water. We plan the demolition, the debris and the noise before the first day, and the price arrives in writing within 24 hours of the visit.

Google5.0★★★★★Licensed & insuredPermits includedWritten estimate

Book your in-home visit

Free, no obligation. You don't need to have it all figured out before booking.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

5.0 ★★★★★ on GoogleLicensed Florida GCInsured every jobFirm written price

How it works

Plan the tear-out first.

The new surface is the part you choose. The hard part is removing the old deck between the house, the pool and the water without damaging any of them. The visit looks at what is coming out, what is underneath and where it all goes.

  1. You reach outForm or call. We call back to book a free visit, evenings and Saturdays included.
  2. We look under the surfaceThe existing deck and coping, cracks and settling, drainage, the base beneath, the pool edge, and what sits between the deck and the canal.
  3. You get the estimate in writing, within 24 hoursDemolition, base repair, the new surface, coping and drainage, each on its own line.
  4. You decideRead it, compare it, call when you are ready. Nothing starts before you sign.

What we build in Bay Colony

From the house to the water's edge.

Travertine decks

Pavers in travertine, cool underfoot and set on a base that drains.

Concrete pavers

Interlocking pavers in the color and pattern you choose.

Resurfacing

A new surface over a sound existing slab when tear-out is not needed.

Coping

The pool edge replaced and matched to the deck.

Drainage

Slopes and drains set so water moves away from the house.

Screen and shade

An enclosure or cover over the deck, on the same contract.

Close view of a travertine deck beside a pool

What changes in Bay Colony

Loud work,
near the water.

Breaking up an old deck is the loudest part of the job. The City of Fort Lauderdale sets construction hours for every day of the week, with a later start on Sunday, and work outside them needs a noise control plan approved by the Building Official and the City Manager. We schedule the demolition inside those hours from the start, so the job runs on a plan instead of on complaints.

On a canal lot, the old deck often runs close to the water. Debris and dust can end up in the canal or against the seawall if no one plans for it, so the edge on the water side is protected before demolition starts, and any dock behind the house is kept clear of equipment. The broken concrete goes out by truck, through the gate on the west side, the single entrance to Bay Colony, and we coordinate those trips with the gate before the job starts.

The new deck is then built for the place: a base that drains away from the house, a surface that takes sun and salt, and coping set to the pool. Joints and sealer are chosen for a deck that sees pool water and salt air together, and the work is permitted with the City of Fort Lauderdale when the scope calls for it.

What's in the price

Out with the old,
clean to the water.

The estimate separates the tear-out from the new deck, so you can see what the removal and the protection cost on their own.

  • Protection — the house, the pool and the water side covered before demolition
  • Demolition — old deck and coping removed inside City work hours
  • Debris out — hauled away, with truck trips coordinated with the gate
  • Base repair — soft areas dug out and the base rebuilt and compacted
  • Drainage — slopes and drains set away from the house
  • New surface — travertine, pavers or resurfacing, laid to the pattern you approve
  • Coping and sealing — pool edge set and the surface sealed

The part that separates deck builders here

Nothing goes
into the canal.

A deck crew can leave a clean new surface and a canal full of dust. Planning the tear-out is what keeps the job clean from the house to the water's edge.

Homeowners

Rated 5.0 on Google.

5.0
★★★★★
Google rating · every review, five stars
Google
K Kelsey BarbosaGoogle review Google
★★★★★

We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.

S Sasha AbouGoogle review Google
★★★★★

Extremely professional company and very dedicated to their clients! Their work was impeccable and I was very pleased with their services!

G Gabriel BarbosaGoogle review Google
★★★★★

The work they did on our house was fantastic. The crew was efficient with their time and courteous with coming in and out of our home. I will recommend them to all my friends and family! Honest and great people to work with.

S sara bouGoogle review · Local Guide Google
★★★★★

Best service ever! They take care of every detail! Always on time, everything came up as I wanted. Thank you!

D deborah medel-gimenezGoogle review Google
★★★★★

The absolute best! Would definitely recommend 100%!!

M Monica BecharaGoogle review · Local Guide Google
★★★★★

They are the best! Everything was perfect. Super responsible, reliable and always on time. I recommend them 100%.

Google Business Profile rating recorded September 14, 2026. Read them on Google.

Before you hire anyone

The ones people actually ask.

When can you do the demolition?

Within the construction hours the City of Fort Lauderdale sets, which start later on Sunday. Work outside those hours needs a noise control plan approved by the Building Official and the City Manager.

How do you keep debris out of the canal?

We protect the water side and keep equipment clear of the seawall and any dock before demolition starts, and haul the debris out as we go.

Can you resurface instead of replacing?

If the existing slab is sound, yes. If it is cracked or settling, we tell you, because a new surface over a failing base will crack again.

Which surface is cooler for bare feet?

Travertine stays cooler than most concrete pavers. We show you samples of both at the visit.

How much does a pool deck cost?

It depends on the area, the tear-out and the surface. You get it in writing, line by line, within 24 hours of the visit.

Are you licensed and insured?

Yes. FF Builders is a Florida Certified General Contractor, licensed and insured.

More in Bay Colony

One contractor inside the gate.

FF Builders is a Florida Certified General Contractor working in Bay Colony, on the homes along the canals and in the Bay Colony Club. Kitchens, baths, impact glass, additions and full renovations are the same company, with one person answering the phone from the first visit to the final inspection.

Pool decks · General contractor in Bay Colony · Travertine in Bay Colony · Screen enclosures in Bay Colony · Outdoor kitchens in Bay Colony · Pool decks in Lauderdale-by-the-Sea · Pool decks in Sea Ranch Lakes · Pool decks in Lighthouse Point · Pool decks in Coral Ridge

Free in-home visit

Your pool deck, rebuilt to the water's edge.

Tell us roughly what you're thinking. We come out, measure, and leave you with a real number. No obligation, and no decision required before you book.

  • A firm written price — material, labor, removal and haul-away.
  • Licensed & insured Florida crews — on every single job.
  • We call you back fast — during business hours, same or next day.

Book your in-home visit

Free, no obligation. Decide after you see the numbers.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

Mon–Fri, 8am–6pm ET · Serving Miami-Dade & Broward.