FF BuildersFF Builders
Renovated classroom with a new floor, LED ceiling lights and a whiteboard wall
Coral Gables · Classrooms · Summer schedule

Private school renovation
in Coral Gables.

Coral Gables has private schools with campuses older than most of their families. We renovate inside those buildings on a summer clock, and price it in writing within 24 hours.

Google5.0★★★★★Licensed & insuredPermits includedWritten estimate

Book your in-home visit

Free, no obligation. You don't need to have it all figured out before booking.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

5.0 ★★★★★ on GoogleLicensed Florida GCInsured every jobFirm written price

How it works

The calendar is fixed. The building is old.

A school renovation has one deadline that does not move: the first day of class. In Coral Gables, many campuses have buildings from the city's early decades or the postwar years, and some carry a historic designation. The visit happens during the school year, so the summer is spent building, not discovering.

  1. You reach outForm or call. We call back to book a free visit, evenings and Saturdays included.
  2. We walk the campus during the yearClassrooms, restrooms, ceilings, what is behind the walls and which buildings carry a designation.
  3. You get the estimate in writing, within 24 hoursBuilding by building, with what fits in the summer, what waits for the next break and permits.
  4. You decideRead it, compare it, call when you are ready. Nothing starts before you sign.

What we renovate in Coral Gables

Rooms ready for the first bell.

Classrooms

Floors, ceilings, lighting and whiteboard walls.

Restrooms

Fixtures, partitions and accessible stalls.

Common areas

Corridors, cafeterias and gathering rooms.

Offices and reception

Admissions, administration and the front desk families see.

Windows

Impact units in older openings, with the exterior review planned.

Paint and finishes

Every room touched, in one pass.

Classroom stripped during summer break while a crew installs a new ceiling grid

What older campuses add

A summer is short
in an old building.

Families in Coral Gables often choose a school for its tradition, and the buildings show it: thick masonry walls, high ceilings, original openings. Those are the features worth keeping. They are also where the surprises are, in old wiring, plumbing patched over decades and ceilings that hide more than a grid.

That is why we walk the campus months before the break. Opening a wall in June to find out what is inside leaves no room in August. We look above ceilings and behind access panels during the year, and split the scope into what fits this summer and what goes to winter break or next year.

Interior work moves on the building permit. Anything that changes what the campus looks like from the street, like new windows, doors or a new entrance, goes through the Board of Architects, and a building with a historic designation also goes through the city's historic preservation review. Those steps are on the schedule before summer starts, so the exterior is approved by the time the students leave.

What's in the price

Summer work,
finished by the first day.

The job is done when teachers can set up their rooms, not when the crew leaves.

  • Campus walk — during the school year, above ceilings and behind panels
  • Phased scope — what fits this summer, what waits
  • Exterior and historic review — on the schedule before the break
  • Classroom finishes — floors, ceilings, lighting and paint
  • Restrooms — fixtures and accessible stalls
  • Permits and inspections — closed before teachers return

What separates school contractors here

August does not
move for anyone.

A contractor who starts measuring in June is planning to finish in September. In an older Coral Gables campus, the summer only works if the discovery happened during the school year.

Homeowners

Rated 5.0 on Google.

5.0
★★★★★
Google rating · every review, five stars
Google
K Kelsey BarbosaGoogle review Google
★★★★★

We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.

S Sasha AbouGoogle review Google
★★★★★

Extremely professional company and very dedicated to their clients! Their work was impeccable and I was very pleased with their services!

G Gabriel BarbosaGoogle review Google
★★★★★

The work they did on our house was fantastic. The crew was efficient with their time and courteous with coming in and out of our home. I will recommend them to all my friends and family! Honest and great people to work with.

S sara bouGoogle review · Local Guide Google
★★★★★

Best service ever! They take care of every detail! Always on time, everything came up as I wanted. Thank you!

D deborah medel-gimenezGoogle review Google
★★★★★

The absolute best! Would definitely recommend 100%!!

M Monica BecharaGoogle review · Local Guide Google
★★★★★

They are the best! Everything was perfect. Super responsible, reliable and always on time. I recommend them 100%.

Google Business Profile rating recorded September 14, 2026. Read them on Google.

Before you hire anyone

The ones people actually ask.

Can you finish over one summer?

That depends on the scope and the building. We walk the campus during the year and split the work into what fits the summer and what waits, so the date you are given is one you can hold.

Does a historic school building need extra approval?

If the building carries a historic designation, exterior changes also go through the city's historic preservation review, in addition to the Board of Architects. Interior work moves on the building permit.

Can you work while school is in session?

For some work, yes, after hours and in closed-off areas. Most classroom work is done during breaks.

Can you replace windows on an older campus building?

Yes. Exterior changes go through the Board of Architects, so window work is planned months ahead of the break.

How much does a school renovation cost?

It depends on the number of rooms, the buildings and the scope. You get a written estimate within 24 hours of the visit.

Are you licensed and insured?

Yes. FF Builders is a Florida Certified General Contractor, licensed and insured.

More in Coral Gables

One contractor for the whole house.

FF Builders is a Florida Certified General Contractor working across Coral Gables. Windows, doors, stucco, kitchens and baths are the same company, under the same contract, with one person answering the phone from the first visit to the final inspection.

Private school renovation · General contractor in Coral Gables · Daycare build-out in Coral Gables · Commercial impact windows in Coral Gables · ADA upgrades in Coral Gables · Private school renovation in Pinecrest · Private school renovation in Coconut Grove · Private school renovation in South Miami

Free in-home visit

Your campus, renovated over the summer.

Tell us roughly what you're thinking. We come out, measure, and leave you with a real number. No obligation, and no decision required before you book.

  • A firm written price — material, labor, removal and haul-away.
  • Licensed & insured Florida crews — on every single job.
  • We call you back fast — during business hours, same or next day.

Book your in-home visit

Free, no obligation. Decide after you see the numbers.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

Mon–Fri, 8am–6pm ET · Serving Miami-Dade & Broward.