FF BuildersFF Builders
Renovated classroom with a new floor, bright ceiling lights and a full whiteboard wall
Coral Ridge · Classrooms · Summer break

Private school renovation
in Coral Ridge.

In South Florida the summer break and hurricane season arrive together. If your school is in or near Coral Ridge, we plan the work so no wall or window is left open when a storm is named.

Google5.0★★★★★Licensed & insuredPermits includedWritten estimate

Book your in-home visit

Free, no obligation. You don't need to have it all figured out before booking.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

5.0 ★★★★★ on GoogleLicensed Florida GCInsured every jobFirm written price

How it works

Two calendars on one job.

A school renovation has one fixed date: the first day of classes. In Florida it has a second calendar running at the same time, because the weeks when the building is empty are the same weeks when tropical storms start forming. The visit happens in spring, so the order of the work can be planned around both, with the weather-exposed work placed where a delay hurts least.

  1. You reach outForm or call. We call back to book a free visit, evenings and Saturdays included.
  2. We walk the campus in springClassrooms, restrooms, windows, exterior walls, the staging area and the street around the school.
  3. You get the estimate in writing, within 24 hoursArea by area, with the order of work, material lead times, the permit and the first day of class.
  4. You decideRead it, compare it, call when you are ready. Nothing starts before you sign.

What we build in Coral Ridge

A building ready
for class and for wind.

Classrooms

Floors, ceilings, lighting, whiteboard walls and storage.

Restrooms

Fixtures, partitions and accessible stalls.

Impact windows

Old openings replaced with rated units and the concrete around them repaired.

Hallways and common areas

Finishes that take daily traffic and cleaning.

Front office and entry

A controlled entry and a reception for parents.

Painting

Classrooms and corridors, done while the building is empty.

Empty classroom stripped for summer work while a crew installs a new ceiling grid

What Coral Ridge adds

Summer break
is storm season.

The order of the work matters more than the speed. Anything that opens the building to the weather, such as window replacement or repairs to exterior walls, goes first and is closed up quickly, one opening at a time. Interior work that can survive a storm warning, like painting, flooring and restrooms, fills the rest of the break. If a storm is named mid-job, the building can be secured without a classroom wing standing open.

Materials have to be on site before they are needed, and impact windows in particular are ordered well ahead. We measure and order in spring so the openings are not waiting on deliveries in July. If the building is older, we open a sample of walls and ceilings early as well, because what is behind them can change the scope and it is better to know before the break than halfway through it. A change found in June can be priced and ordered; the same change found in August usually means a classroom that is not ready.

A school in or near a residential part of Fort Lauderdale also has neighbors through the summer. The City sets construction hours for every day of the week, with a later start on Sunday, and we keep deliveries, dumpsters and loud work inside them. We pull the permit with the City and schedule the inspections so they are closed before teachers return.

What's in the price

Ready for the first day,
closed for the season.

Finished means every opening is closed, every room is ready and the inspections are done before class.

  • Spring planning — visit, measurements and orders before school lets out
  • Openings first — windows and exterior work closed up early
  • Storm-ready site — a plan to secure the building if a storm is named
  • Hidden conditions — walls and ceilings opened early when the building is older
  • Finishes for traffic — floors and walls that take a school year
  • Permit and inspections — pulled with the City and closed before class

What separates school builders here

The weather does not
wait for the bell.

A schedule built only around the first day of class leaves the building open in the worst weeks of the year. We order the work so the risky part is finished first.

Homeowners

Rated 5.0 on Google.

5.0
★★★★★
Google rating · every review, five stars
Google
K Kelsey BarbosaGoogle review Google
★★★★★

We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.

S Sasha AbouGoogle review Google
★★★★★

Extremely professional company and very dedicated to their clients! Their work was impeccable and I was very pleased with their services!

G Gabriel BarbosaGoogle review Google
★★★★★

The work they did on our house was fantastic. The crew was efficient with their time and courteous with coming in and out of our home. I will recommend them to all my friends and family! Honest and great people to work with.

S sara bouGoogle review · Local Guide Google
★★★★★

Best service ever! They take care of every detail! Always on time, everything came up as I wanted. Thank you!

D deborah medel-gimenezGoogle review Google
★★★★★

The absolute best! Would definitely recommend 100%!!

M Monica BecharaGoogle review · Local Guide Google
★★★★★

They are the best! Everything was perfect. Super responsible, reliable and always on time. I recommend them 100%.

Google Business Profile rating recorded September 14, 2026. Read them on Google.

Before you hire anyone

The ones people actually ask.

Can you replace windows over the summer without leaving the building exposed?

Yes. We replace one opening at a time and close each one before the next is opened, so the building can be secured quickly if a storm is named.

Can you finish a renovation over the summer break?

Often, yes, when the visit and the orders happen in spring. The estimate shows the order of work and what has to be on site by when.

Can you work during the school year?

Some work can run on weekends or in closed-off wings, inside the City's construction hours. We plan it with you so classes are not disturbed.

Who supplies the equipment?

Your vendors do; we build the space ready for it. Furniture, smart boards and kitchen equipment come from your suppliers, with backing and power in place.

How much does a school renovation cost?

It depends on the number of rooms, the windows and the condition of the building. The estimate comes in writing within 24 hours of the visit.

Are you licensed and insured?

Yes. FF Builders is a Florida Certified General Contractor, licensed and insured.

More in Coral Ridge

One contractor, canal to tower.

FF Builders is a Florida Certified General Contractor working across Coral Ridge, from the ranch houses on the canals to the towers on the Intracoastal and the shops along Federal Highway. Kitchens, baths, impact glass, additions and build-outs are the same company, with one person answering the phone from the first visit to the final inspection.

Private school renovation · General contractor in Coral Ridge · Daycare build-out in Coral Ridge · Commercial impact windows in Coral Ridge · ADA compliance upgrades in Coral Ridge

Free in-home visit

Your school, ready for class and the season.

Tell us roughly what you're thinking. We come out, measure, and leave you with a real number. No obligation, and no decision required before you book.

  • A firm written price — material, labor, removal and haul-away.
  • Licensed & insured Florida crews — on every single job.
  • We call you back fast — during business hours, same or next day.

Book your in-home visit

Free, no obligation. Decide after you see the numbers.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

Mon–Fri, 8am–6pm ET · Serving Miami-Dade & Broward.