A school in Southwest Ranches is spread over land: separate buildings, a long drive, parking and a car line, fields around them. We renovate one building while the others teach, with the trucks kept away from the students, and price it in writing within 24 hours.
We got your request and will call to set the visit (Mon–Fri, 8am–6pm ET).
How it works
On a campus of separate buildings, the first question is how a concrete truck, a load of drywall and a dumpster reach the building without crossing the path the children walk. The visit follows the drive and the car line and picks the route and the staging area before anyone talks finishes.
What we renovate in Southwest Ranches
Floors, ceilings, LED lighting, walls and storage, one building at a time.
New fixtures, partitions, tile and ventilation.
Classroom windows replaced with impact glass, building by building.
Exterior doors in impact glass and hardware your security consultant specifies.
Walks between buildings and pads for new structures, poured and drained.
Classrooms, corridors and building exteriors refinished so the campus reads as one.

What Southwest Ranches adds
A school on rural land often grows the way the properties around it do: one building, then another beside the field. That spread makes the work manageable. One building is closed off as a work zone while the others keep teaching, and the phasing plan shows which building goes when.
Then the route. The long drive is the only way in for families and crew, so deliveries are scheduled outside drop-off and pickup, and trucks use a separate path or a staging area at the back of the lot when the ground allows it. Part of the Town sits on low ground with ditches and canals that carry the rain, so staging goes where trucks will not rut the field or block the drainage, and what they disturb is put back.
Open country also means the buildings take the wind straight on in hurricane season, with large trees around them. Classroom windows and entry doors are replaced with impact glass building by building, ordered to arrive while that building is empty. The drawings and site plan are prepared for the Town's zoning and building review, we pull the permit for each phase and follow every inspection, and each building is handed back cleaned and closed before its students return.
What's in the price
A school on its own land can keep running through a renovation. The plan is built for that.
What separates school builders here
A contractor who prices the classrooms and ignores the drive ends up with a dumpster in the car line and a truck crossing the field at recess. Here the route, the staging and the order of the buildings are planned before the first wall is opened.
Homeowners
We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.
Extremely professional company and very dedicated to their clients! Their work was impeccable and I was very pleased with their services!
The work they did on our house was fantastic. The crew was efficient with their time and courteous with coming in and out of our home. I will recommend them to all my friends and family! Honest and great people to work with.
Best service ever! They take care of every detail! Always on time, everything came up as I wanted. Thank you!
The absolute best! Would definitely recommend 100%!!
They are the best! Everything was perfect. Super responsible, reliable and always on time. I recommend them 100%.
Google Business Profile rating recorded September 14, 2026. Read them on Google.
Before you hire anyone
Usually, yes, on a campus with separate buildings. One building becomes the work zone, closed off from students, and the others keep teaching. The phasing plan shows where each class moves.
The route and the staging area are chosen at the visit. Deliveries are scheduled outside drop-off and pickup, and the work zone is fenced off from the paths the children use.
Yes, building by building. The glass is ordered early so it arrives while the building is empty, and the openings are closed and inspected before students return.
Often, yes, depending on what your zoning allows. Check with the Town on the use and on the site. The drawings and site plan are prepared for the Town's zoning and building review, and we pull the permit.
It depends on the number of buildings, the rooms, the windows, the site work and how the phases are split. You get a written estimate within 24 hours of the visit.
Yes. FF Builders is a Florida Certified General Contractor, licensed and insured.
More in Southwest Ranches
FF Builders is a Florida Certified General Contractor working across Southwest Ranches, from the main house to the guest house, the cabana and the long drive in. Kitchens, baths, additions, impact glass and new homes are the same company, with one person answering the phone from the first visit to the final inspection.
Private school renovation · General contractor in Southwest Ranches · Daycare build-out in Southwest Ranches · Impact windows in Southwest Ranches · Concrete contractor in Southwest Ranches · Private school renovation in Weston · Private school renovation in Parkland
Free in-home visit
Tell us roughly what you're thinking. We come out, measure, and leave you with a real number. No obligation, and no decision required before you book.
We got your request and will call to set the visit during business hours (Mon–Fri, 8am–6pm ET).