FF BuildersFF Builders
Stone countertop installed in a Surfside kitchen
Surfside · Kitchens, cafés & offices · Licensed

Countertops
in Surfside.

A countertop in a family kitchen and one on a café counter on Harding Avenue take very different abuse. We pick the material for the use and put the price in writing within 24 hours of the visit.

Google5.0★★★★★Licensed & insuredPermits includedWritten estimate

Book your in-home visit

Free, no obligation. You don't need to have it all figured out before booking.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

5.0 ★★★★★ on GoogleLicensed Florida GCInsured every jobFirm written price

How it works

What the counter will go through.

Coffee, lemon, hot pans, a credit card machine sliding across it all day. The visit starts with how the counter is used, because that is what decides between quartz, marble and quartzite.

  1. You reach outForm or call. We call back to book a free visit, evenings and Saturdays included.
  2. We look at the cabinets and the useWhether the base is level and strong enough, where the seams can fall, and what the counter will face every day.
  3. You get the estimate in writing, within 24 hoursMaterial, fabrication, template, removal, installation, sink and edge details.
  4. You decideRead it, compare it, call when you are ready. Nothing starts before you sign.

What we install in Surfside

Kitchen, bath or business.

Kitchen countertops

Quartz, marble, granite or quartzite for the homes west of Harding.

Bathroom vanity tops

Stone tops with undermount sinks.

Café and shop counters

Service counters built for daily traffic on Harding Avenue.

Reception desks

Stone tops for offices and practices.

Backsplashes

In the same stone or in tile, finished with the counter.

Condo kitchens

Measured and installed within the association's rules.

Selecting stone slabs at a stone yard

What changes in Surfside

A family kitchen,
a counter on Harding.

In the houses west of Harding Avenue, a new countertop often goes on cabinets that have been in the kitchen for a long time. Before we template, we check that the boxes are level, solid and attached to the wall, because a stone top on a base that moves cracks at the seam or the sink. In older kitchens the walls are rarely straight, so the template is taken after the base is fixed, not before.

Harding Avenue is the other half of the work. Cafés, small restaurants, shops and offices need counters that face something a home kitchen never does: hundreds of cups, spills, cleaning products, a register and elbows, every day. Marble etches and stains under that kind of use. Quartz and quartzite hold up better, and the edge profile and overhang are chosen for people leaning on them. The equipment is yours: your supplier delivers the espresso machine or the display case, and we build the counter ready for it, with the cutouts and support where each piece will sit.

For a business, the install has to fit around opening hours. We remove the old top, template and set the new one with the space protected, plan around scarce parking and a busy sidewalk, and leave the counter ready for service. For a home, we reconnect the sink in the same visit, so the kitchen is not out longer than it has to be.

What's in the price

Slab to seam,
one contractor.

Material, fabrication, installation and the base under it are in one price, so you can compare quotes on the same terms.

  • Base check — cabinets leveled and secured before the template
  • Template — taken on site after the base is ready
  • Slab selection — chosen with you at the yard or from samples
  • Fabrication — edges, sink and cooktop cutouts, seams planned
  • Removal and installation — old top out, new top set and sealed
  • Sink reconnection — in the same visit, in kitchens and baths

The part that separates countertop installers here

The right stone
depends on the counter's day.

A beautiful marble top on a café counter can look tired within a season. Picking the material for how the counter is used is part of the job, not a sales question.

Homeowners

Rated 5.0 on Google.

5.0
★★★★★
Google rating · every review, five stars
Google
K Kelsey BarbosaGoogle review Google
★★★★★

We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.

S Sasha AbouGoogle review Google
★★★★★

Extremely professional company and very dedicated to their clients! Their work was impeccable and I was very pleased with their services!

G Gabriel BarbosaGoogle review Google
★★★★★

The work they did on our house was fantastic. The crew was efficient with their time and courteous with coming in and out of our home. I will recommend them to all my friends and family! Honest and great people to work with.

S sara bouGoogle review · Local Guide Google
★★★★★

Best service ever! They take care of every detail! Always on time, everything came up as I wanted. Thank you!

D deborah medel-gimenezGoogle review Google
★★★★★

The absolute best! Would definitely recommend 100%!!

M Monica BecharaGoogle review · Local Guide Google
★★★★★

They are the best! Everything was perfect. Super responsible, reliable and always on time. I recommend them 100%.

Google Business Profile rating recorded September 14, 2026. Read them on Google.

Before you hire anyone

The ones people actually ask.

What is the best countertop for a café or shop counter?

For a busy service counter, quartz or quartzite usually holds up better than marble, which etches and stains with daily spills. We go over the options for your counter at the visit.

Who supplies the equipment for my café counter?

Your supplier; we build the counter ready for it, with the cutouts and support where each piece goes.

Can you install a new counter without closing my business?

Usually yes. The old top is removed and the new one set outside opening hours or on a closed day, and the space is left ready for service.

Can you put new countertops on my old cabinets?

If the cabinets are sound, yes. We level and secure them first. If they are not, we tell you before the stone is cut.

How much do countertops cost?

It depends on the material, the size and the details. You get the price in writing within 24 hours of the visit.

Are you licensed and insured?

Yes. FF Builders is a Florida Certified General Contractor, licensed and insured.

More in Surfside

One contractor, condo or house.

FF Builders is a Florida Certified General Contractor working across Surfside, from the condos on Collins Avenue to the homes west of Harding Avenue. Kitchens, baths, floors, windows and concrete repair are the same company, with one person answering the phone from the first visit to the final inspection.

Countertops · General contractor in Surfside · Home remodeling in Surfside · Kitchen remodeling in Surfside · Marble and stone in Surfside · Kitchen cabinets in Surfside · Countertops in Bal Harbour · Countertops in Bay Harbor Islands · Countertops in Miami Beach · Countertops in Indian Creek

Free in-home visit

Countertops for your Surfside kitchen or counter.

Tell us roughly what you're thinking. We come out, measure, and leave you with a real number. No obligation, and no decision required before you book.

  • A firm written price — material, labor, removal and haul-away.
  • Licensed & insured Florida crews — on every single job.
  • We call you back fast — during business hours, same or next day.

Book your in-home visit

Free, no obligation. Decide after you see the numbers.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

Mon–Fri, 8am–6pm ET · Serving Miami-Dade & Broward.