FF BuildersFF Builders
Empty new salon with a wood accent wall, outlets at each station and capped plumbing at the shampoo area
Coconut Grove · Licensed GC · City of Miami permit

Salon and spa build-out
in Coconut Grove.

The storefronts on Grand Avenue have been rented, gutted and rebuilt more times than anyone has records for. A salon puts more water through a space than any tenant before it. We find out what the old pipes can take, and price it within 24 hours.

Google5.0★★★★★Licensed & insuredPermits includedWritten estimate

Book your in-home visit

Free, no obligation. You don't need to have it all figured out before booking.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

5.0 ★★★★★ on GoogleLicensed Florida GCInsured every jobFirm written price

How it works

We look under the floor before the stations.

A row of shampoo bowls, a pedicure line and a laundry machine all drain at once. In an older Grove building the drain under the slab may be cast iron, undersized or simply not where the drawing says. At the visit we find the line, the water heater, the electrical panel and the air system, and price what a salon actually needs.

  1. You reach outForm or call. We call back to book a free visit, evenings and Saturdays included.
  2. We walk the space and its systemsDrains, water heater, panel, ventilation and what the previous tenants left behind walls and under the floor.
  3. You get the estimate in writing, within 24 hoursPlumbing, stations, treatment rooms, finishes, ventilation, power and the City of Miami permit, priced line by line.
  4. You decideRead it, compare it, call when you are ready. Nothing starts before you sign.

What we build for Grove salons and spas

Water, power and calm in an old building.

Shampoo and pedicure plumbing

Water, drains and venting for every bowl and chair, tied into the building's line.

Treatment rooms

Framed and insulated for sound, finished for quiet.

Stations and reception

Built-ins, mirrors, storage and the front desk.

Wet-area finishes

Tile and waterproofing where water hits floors and walls.

Floors

Surfaces that handle hair, chemicals and water.

Accent walls

Wood paneling and texture for the wall in every photo.

Salon build-out with framed treatment rooms and plumbing roughed in

Why Grove salons are different

An old building
that never ran this much water.

Coconut Grove is one of the oldest parts of Miami, settled before the City existed and annexed in 1925. Some of the commercial buildings along Grand Avenue and in the village center have been standing for generations, and every tenant changed something: a wall here, a bathroom there, wiring added on top of wiring. Plans on file rarely match what is actually in the walls.

A salon tests all of that at once. Shampoo bowls, pedicure chairs, a washer and a high-demand water heater ask more of the drain and the supply than a clothing store ever did. Blow dryers, color processors and lighting at every station ask more of the panel. Chemicals ask more of the ventilation. We find the limits at the visit, price the upgrades in the same estimate and avoid the call where the floor gets cut open after the tile is down.

The space also has to feel like a retreat on a busy street. Treatment rooms get sound insulation so the front of the salon does not reach the massage table, and the air is balanced so the nail station does not perfume the whole room. The permit goes through the City of Miami, and the plan accounts for whatever the building needs to pass it.

What's in the price

The whole salon,
ready for your first client.

One contract for the plumbing, the rooms, the stations and the finish, with the old building's limits found and priced up front.

  • Systems check — drains, water heater, panel and air checked at the visit
  • Plumbing — bowls, pedicure chairs, sinks and laundry roughed in and connected
  • Rooms and stations — framed, insulated and finished
  • Ventilation — air planned for color, nails and treatment rooms
  • City of Miami permit — pulled, inspected and closed
  • Handover — clean and ready for your chairs and your team

The part that separates salon builders here

The surprise is always
under the slab.

In an older Grove building the most expensive salon problem is a drain that cannot keep up, found after the floor is finished. We look for it first, because finding it later costs you the floor and the opening date.

Homeowners

Rated 5.0 on Google.

5.0
★★★★★
Google rating · every review, five stars
Google
K Kelsey BarbosaGoogle review Google
★★★★★

We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.

S Sasha AbouGoogle review Google
★★★★★

Extremely professional company and very dedicated to their clients! Their work was impeccable and I was very pleased with their services!

G Gabriel BarbosaGoogle review Google
★★★★★

The work they did on our house was fantastic. The crew was efficient with their time and courteous with coming in and out of our home. I will recommend them to all my friends and family! Honest and great people to work with.

S sara bouGoogle review · Local Guide Google
★★★★★

Best service ever! They take care of every detail! Always on time, everything came up as I wanted. Thank you!

D deborah medel-gimenezGoogle review Google
★★★★★

The absolute best! Would definitely recommend 100%!!

M Monica BecharaGoogle review · Local Guide Google
★★★★★

They are the best! Everything was perfect. Super responsible, reliable and always on time. I recommend them 100%.

Google Business Profile rating recorded September 14, 2026. Read them on Google.

Before you hire anyone

The ones people actually ask.

Can an older Grove building handle a row of shampoo bowls?

Sometimes as is, often with work. We locate and check the drain and water heater at the visit and price any upgrade in the same estimate.

Who supplies the equipment?

Your supplier; we build the space ready for it, with water, drains, power and backing where each chair, bowl and table goes.

Can you build quiet treatment rooms on a busy street?

Yes. Walls and ceilings are insulated for sound and doors are chosen to seal, so the front of the salon stays out of the room.

Can you take over a space that was already a salon?

Yes. We check what can be reused at the visit and price only what has to change.

Who issues the permit?

The City of Miami, since Coconut Grove is part of the City. We pull it and close the inspections.

Are you licensed and insured?

Yes. FF Builders is a Florida Certified General Contractor, licensed and insured.

More in Coconut Grove

One contractor, old house or new.

FF Builders is a Florida Certified General Contractor working across Coconut Grove, from old cottages under the canopy to new homes and bayfront condos. Kitchens, baths, additions, windows and structural work are the same company, with one person answering the phone from the first visit to the final inspection.

Salon and spa build-out · General contractor in Coconut Grove · Med spa build-out in Coconut Grove · Commercial build-out in Coconut Grove · Retail store build-out in Coconut Grove · Salon and spa build-out in Coral Gables · Salon and spa build-out in Pinecrest · Salon and spa build-out in South Miami

Free in-home visit

Your salon, built for a Grove building.

Tell us roughly what you're thinking. We come out, measure, and leave you with a real number. No obligation, and no decision required before you book.

  • A firm written price — material, labor, removal and haul-away.
  • Licensed & insured Florida crews — on every single job.
  • We call you back fast — during business hours, same or next day.

Book your in-home visit

Free, no obligation. Decide after you see the numbers.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

Mon–Fri, 8am–6pm ET · Serving Miami-Dade & Broward.