We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.

When the lot has no room to grow out, the house can grow up. We add the second floor and finish it so the house looks like it was always built that way.
We got your request and will call to set the visit (Mon–Fri, 8am–6pm ET).
How it works
A second floor puts new weight on walls and footings that were designed for one. The visit looks at the existing structure, the roof and where a stair can go, so the engineer starts with the right questions.
What we build
Footings, columns and beams where the engineer calls for them.
Walls, floor system and roof framing.
A new stair that fits the floor plan below.
New roof over the addition, matched to the house.
Stucco and openings matched to the original.
The new rooms, finished.

How a second story gets added
Everything starts with the engineer's review of the existing house. The walls, beams and footings below have to carry the new floor, and where they cannot, they are reinforced before anything goes up.
The old roof comes off the area being built, and the house is protected from rain while it is open. The new floor structure, walls and roof are built and tied down to the structure below, so the wind loads travel all the way to the foundation.
The stair is often the hardest design problem. It needs space on the ground floor, and it decides how the new floor feels to walk into. It is built as part of the plan, not squeezed in at the end.
Outside, the stucco texture, the roof material and the window style are matched to the original, so the addition reads as one house from the street.
What's in the price
Structure, roof and finishes in one contract.
The part that separates addition contractors
The riskiest days are the ones when the old roof is off and the new one is not on yet. A plan for that window protects everything already inside the house.
Homeowners
We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.
Extremely professional company and very dedicated to their clients! Their work was impeccable and I was very pleased with their services!
The work they did on our house was fantastic. The crew was efficient with their time and courteous with coming in and out of our home. I will recommend them to all my friends and family! Honest and great people to work with.
Best service ever! They take care of every detail! Always on time, everything came up as I wanted. Thank you!
The absolute best! Would definitely recommend 100%!!
They are the best! Everything was perfect. Super responsible, reliable and always on time. I recommend them 100%.
Google Business Profile rating recorded September 14, 2026. Read them on Google.
Before you build
Many can, with reinforcement. Houses built with concrete block walls and continuous footings are often good candidates, but the footings were sized for one floor, and the engineer has to confirm what they can carry. Sometimes new footings, columns or beams are needed in specific places.
The answer comes from the engineer's review, not from looking at the house. We point out what we see at the visit, such as cracks, past repairs or settlement, so the review starts in the right places.
It depends on the lot. If building out would take the yard, the pool area or space the zoning does not allow, going up keeps the land you have. If the lot has room, a ground-floor addition is usually simpler, because the existing house does not have to carry new weight.
We can price both options so you compare them with real numbers.
Somewhere it takes the least from the floor below and arrives in the right place above. Common choices are an existing hallway, part of a large living room, a former closet or a small extension built just for the stair. The location changes both floors, so it is one of the first decisions in the design.
Sometimes, but it is not easy. While the roof is open and the structure is being reinforced, the house is noisy and dusty, and some rooms may be off limits. Many owners move out for the structural phase and come back for the finishing work. We discuss it at the visit and plan around what you decide.
Where the new floor sits, the old roof is removed. Where part of the house stays one story, the existing roof is tied into the new walls with proper flashing. Many owners replace the remaining roof at the same time, so the whole house has the same material and age.
It should, and it is planned that way. The stucco texture, the window style and proportions, the roof tile or material and the trim details are matched to the original. Inside, floors and doors can continue from downstairs so the new level does not feel like an attachment.
Usually. A new floor adds rooms to cool and circuits to feed. The existing air conditioning may not have the capacity for the extra space, so many projects add a separate system for the second floor. The electrical service is checked for the new load, and plumbing is extended to the new bathrooms.
It can. A large addition may require parts of the existing house to be brought up to current standards, and in a flood zone the cost may count toward the FEMA 50 percent rule. What applies depends on the house, the scope and the local office, so it is checked at the start of design.
Through the zoning for your lot, which sets limits on height, size and how the house sits on the land. Some neighborhoods also have design review. Your architect confirms what is allowed for your lot before the design is drawn.
The size of the new floor, the structural reinforcement the engineer requires, the stair, the number of bathrooms, the roof, the window and door package, and the level of finishes. Reinforcement is the item that varies most between houses, which is why it is priced from the engineer's design and not estimated in advance.
Before you hire anyone
Yes, from the structural reinforcement to the finished rooms.
Yes. The engineer designs the structure, and we build exactly to it.
Yes. A single room or suite over part of the house is common.
Yes. Matching the original is part of the plan.
If you choose to, in the same project.
Yes. Permits and inspections are included.
Yes, when it is part of the approved design.
Yes. FF Builders is a Florida Certified General Contractor, licensed and insured.
One contractor
FF Builders is a Florida Certified General Contractor working across Miami-Dade and Broward. Design, structure, systems and finishes are one company, one contract and one person on the phone from the first visit to the final inspection.
Home additions · Primary suite additions · Teardown and rebuild · The FEMA 50 percent rule
Free in-home visit
Tell us roughly what you're thinking. We come out, measure, and leave you with a real number. No obligation, and no decision required before you book.
We got your request and will call to set the visit during business hours (Mon–Fri, 8am–6pm ET).