We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.

A walk-in shower is mostly glass, and in a tower on the Mile every panel rides up in the service elevator the association books. We size the glass for that trip and pick hardware that holds up in salt air.
We got your request and will call to set the visit (Mon–Fri, 8am–6pm ET).
How it works
A frameless panel is measured after the tile is set, made to that size and carried up whole. In a tower the elevator cab, the corridor and your entry decide how large a single piece can be, so we check the route at the visit, along with the floor height, the drain and whether a curbless entry is possible.
What we build on the Mile
The tub taken out and a walk-in shower built in its place.
Slope built on top of the slab, or a linear drain, where the floor allows.
A step low enough to cross easily when curbless does not fit.
Fixed panels or doors sized to the route, with hardware for marine air.
Membrane on the floor and walls, flood tested.
Built into the wall, with blocking set while it is open.

Glass in a coastal tower
Tempered glass cannot be cut once it is made, so its size is fixed before it leaves the shop. That means the shower is designed around the largest piece that can travel from the loading area to your bathroom through the cab, the corridor and the turns. Where a single sheet would be too big, the design splits it into a fixed panel and a door, placed so the joint looks intentional.
Salt air is the second test. Hinges, clamps, the handle and the shower trim are metal you touch every day, and on the east face of the Mile that air reaches into the bathroom. We specify hardware and fittings suited to a coastal setting, and seals at the glass that stand up to humidity, so the shower does not start to show corrosion at the joints a season after it is finished.
Underneath, the shower is built on a concrete slab that stays as it is. The slope comes from a raised floor or a linear drain, and if the doorway cannot rise, a low curb is the right answer. The membrane goes on the floor and walls and is flood tested before tile, because a leak ends up in the unit below. Blocking for grab bars goes in while the wall is open, and all of it happens within the work window the association sets.
What's in the price
One contract from demolition to the last clamp on the glass.
What separates shower installers on the Mile
Glass ordered without measuring the route arrives and cannot go up. Hardware chosen without the ocean in mind starts to stain. Here both are decided at the visit.
Homeowners
We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.
Extremely professional company and very dedicated to their clients! Their work was impeccable and I was very pleased with their services!
The work they did on our house was fantastic. The crew was efficient with their time and courteous with coming in and out of our home. I will recommend them to all my friends and family! Honest and great people to work with.
Best service ever! They take care of every detail! Always on time, everything came up as I wanted. Thank you!
The absolute best! Would definitely recommend 100%!!
They are the best! Everything was perfect. Super responsible, reliable and always on time. I recommend them 100%.
Google Business Profile rating recorded September 14, 2026. Read them on Google.
Before you hire anyone
If it fits the service elevator, the corridor and your door. If not, we split it into a panel and a door so the joint looks planned.
Any metal can corrode in salt air. We specify hardware and fittings meant for coastal homes, which hold up far better than standard finishes.
Often, with a raised floor or a linear drain. It depends on the floor height, the doorway and the drain, which we check at the visit.
In a concrete tower the slab is structure and the ceiling of the unit below, so the slope is built on top of it.
An association usually wants to see bathroom work that touches plumbing. We prepare the package it asks for.
Yes. FF Builders is a Florida Certified General Contractor, licensed and insured.
More on the Galt Ocean Mile
FF Builders is a Florida Certified General Contractor working along the Galt Ocean Mile, in the condo towers on the sand, the hotels on Galt Ocean Drive and the storefronts that serve them. Kitchens, baths, impact glass, facades and full unit renovations are the same company, with one person answering the phone from the first visit to the final inspection.
Walk-in showers · General contractor in Galt Ocean Mile · Home remodeling in Galt Ocean Mile · Bathroom remodeling on the Galt Ocean Mile · Shower waterproofing on the Galt Ocean Mile · Bathroom vanities on the Galt Ocean Mile · Walk-in showers in Lauderdale-by-the-Sea · Walk-in showers in Coral Ridge · Walk-in showers in Bay Colony · Walk-in showers in Lauderdale Beach
Free in-home visit
Tell us roughly what you're thinking. We come out, measure, and leave you with a real number. No obligation, and no decision required before you book.
We got your request and will call to set the visit during business hours (Mon–Fri, 8am–6pm ET).