We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.

When a Surfside building is repairing its facade, replacing the windows in the same project means each opening is opened, repaired and sealed once. We plan both together, stack by stack.
We got your request and will call to set the visit (Mon–Fri, 8am–6pm ET).
How it works
Many condo buildings along Collins Avenue are planning facade and concrete repairs from an engineer's report, and many also have windows and balcony doors near the end of their life. Doing them in separate projects means opening the same edges twice. At the visit we look at both, with the report and the board, before we price a single window.
What we install in Surfside
One product for the whole building, rated for the oceanfront exposure.
Impact sliding doors replaced with the windows.
Concrete and stucco around each opening repaired where the report calls for it.
Perimeters sealed to the facade system.
Drywall, sills and paint restored inside each unit.
Lobby, stair and corridor windows on the same schedule.

What is different in Surfside
Removing an old window exposes the concrete around it: the sill, the jambs, the head and, on a balcony door, the slab edge below. Those are often the same areas an engineer's report lists for repair. When the windows come out during the facade work, the repairs happen with the opening already open, the engineer reviews them as the report requires, and the new window is sealed to sound concrete. Done the other way around, the building pays to remove and reseal new windows a year later.
On the ocean side of Collins Avenue, the windows face wind and rain straight off the water. One impact product and one installation method for the whole building means one set of approvals, one look from the beach and the street, and one maintenance routine for the association. Owners who replaced their own windows over the years are handled case by case with the board, following the building's documents.
The work moves stack by stack, so each unit is opened for as short a time as possible. Every unit is closed and weathertight at the end of the day, interiors are protected, and owners who are away are scheduled through the manager. The permit is pulled with the Town of Surfside, and the delivery of windows to Collins Avenue is planned with the building.
What's in the price
No unit is left open overnight, and the association gets a record of every opening, its repairs and its new window.
The part that separates window contractors
The shortcut is a window project and a facade project on separate schedules. In a Surfside building with a report, that means opening the same edges twice.
Homeowners
We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.
Extremely professional company and very dedicated to their clients! Their work was impeccable and I was very pleased with their services!
The work they did on our house was fantastic. The crew was efficient with their time and courteous with coming in and out of our home. I will recommend them to all my friends and family! Honest and great people to work with.
Best service ever! They take care of every detail! Always on time, everything came up as I wanted. Thank you!
The absolute best! Would definitely recommend 100%!!
They are the best! Everything was perfect. Super responsible, reliable and always on time. I recommend them 100%.
Google Business Profile rating recorded September 14, 2026. Read them on Google.
Before you hire anyone
When both are due, doing them together usually avoids opening the same edges twice. We look at the report and the windows and show the board both options.
Yes, as the engineer's report specifies. The engineer reviews them as the report requires before the new window is set.
They are handled case by case with the board, following the building's documents.
No. Every unit is closed and weathertight at the end of each day.
Yes. The permit is pulled with the Town of Surfside and included in the estimate.
Yes. FF Builders is a Florida Certified General Contractor, licensed and insured, with certificates for the association as required.
More in Surfside
FF Builders is a Florida Certified General Contractor working across Surfside, from the condos on Collins Avenue to the homes west of Harding Avenue. Kitchens, baths, floors, windows and concrete repair are the same company, with one person answering the phone from the first visit to the final inspection.
Whole-building window replacement · General contractor in Surfside · Building facade restoration in Surfside · Impact windows in Surfside · Impact doors in Surfside · Whole-building window replacement in Bal Harbour · Whole-building window replacement in Bay Harbor Islands · Whole-building window replacement in Miami Beach
Free in-home visit
Tell us roughly what you're thinking. We come out, measure, and leave you with a real number. No obligation, and no decision required before you book.
We got your request and will call to set the visit during business hours (Mon–Fri, 8am–6pm ET).