FF BuildersFF Builders
Condo building with new matching impact windows on every floor
Surfside · Impact windows · Each opening opened once

Whole-building window replacement
in Surfside.

When a Surfside building is repairing its facade, replacing the windows in the same project means each opening is opened, repaired and sealed once. We plan both together, stack by stack.

Google5.0★★★★★Licensed & insuredPermits includedWritten estimate

Book your in-home visit

Free, no obligation. You don't need to have it all figured out before booking.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

5.0 ★★★★★ on GoogleLicensed Florida GCInsured every jobFirm written price

How it works

We look at the facade before the windows.

Many condo buildings along Collins Avenue are planning facade and concrete repairs from an engineer's report, and many also have windows and balcony doors near the end of their life. Doing them in separate projects means opening the same edges twice. At the visit we look at both, with the report and the board, before we price a single window.

  1. You reach outForm or call. We call back to book a free visit, evenings and Saturdays included.
  2. We survey every openingWindow and door types, sizes, frame and sill condition, and where the engineer's report lists repairs around openings.
  3. You get the estimate in writing, within 24 hoursPriced by opening and by stack, with the repairs around each opening shown apart.
  4. You decideRead it, compare it, call when you are ready. Nothing starts before you sign.

What we install in Surfside

Windows, doors
and the edges around them.

Impact windows

One product for the whole building, rated for the oceanfront exposure.

Balcony sliding doors

Impact sliding doors replaced with the windows.

Opening repairs

Concrete and stucco around each opening repaired where the report calls for it.

Sealing and waterproofing

Perimeters sealed to the facade system.

Interior finish

Drywall, sills and paint restored inside each unit.

Common area openings

Lobby, stair and corridor windows on the same schedule.

Window opening prepared for a new impact window installation

What is different in Surfside

Open each edge
once.

Removing an old window exposes the concrete around it: the sill, the jambs, the head and, on a balcony door, the slab edge below. Those are often the same areas an engineer's report lists for repair. When the windows come out during the facade work, the repairs happen with the opening already open, the engineer reviews them as the report requires, and the new window is sealed to sound concrete. Done the other way around, the building pays to remove and reseal new windows a year later.

On the ocean side of Collins Avenue, the windows face wind and rain straight off the water. One impact product and one installation method for the whole building means one set of approvals, one look from the beach and the street, and one maintenance routine for the association. Owners who replaced their own windows over the years are handled case by case with the board, following the building's documents.

The work moves stack by stack, so each unit is opened for as short a time as possible. Every unit is closed and weathertight at the end of the day, interiors are protected, and owners who are away are scheduled through the manager. The permit is pulled with the Town of Surfside, and the delivery of windows to Collins Avenue is planned with the building.

What's in the price

Every opening,
closed every night.

No unit is left open overnight, and the association gets a record of every opening, its repairs and its new window.

  • Opening survey — every window and door measured and logged
  • Report coordination — repairs around openings mapped
  • One product — one impact window and door for the building
  • Permit — pulled with the Town of Surfside
  • Stack schedule — unit dates given through the manager
  • Weathertight daily — every unit closed each night
  • Close-out record — opening by opening, with photos

The part that separates window contractors

New windows on old edges
come out again.

The shortcut is a window project and a facade project on separate schedules. In a Surfside building with a report, that means opening the same edges twice.

Homeowners

Rated 5.0 on Google.

5.0
★★★★★
Google rating · every review, five stars
Google
K Kelsey BarbosaGoogle review Google
★★★★★

We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.

S Sasha AbouGoogle review Google
★★★★★

Extremely professional company and very dedicated to their clients! Their work was impeccable and I was very pleased with their services!

G Gabriel BarbosaGoogle review Google
★★★★★

The work they did on our house was fantastic. The crew was efficient with their time and courteous with coming in and out of our home. I will recommend them to all my friends and family! Honest and great people to work with.

S sara bouGoogle review · Local Guide Google
★★★★★

Best service ever! They take care of every detail! Always on time, everything came up as I wanted. Thank you!

D deborah medel-gimenezGoogle review Google
★★★★★

The absolute best! Would definitely recommend 100%!!

M Monica BecharaGoogle review · Local Guide Google
★★★★★

They are the best! Everything was perfect. Super responsible, reliable and always on time. I recommend them 100%.

Google Business Profile rating recorded September 14, 2026. Read them on Google.

Before you hire anyone

The ones people actually ask.

Should we replace the windows during our facade repairs?

When both are due, doing them together usually avoids opening the same edges twice. We look at the report and the windows and show the board both options.

Do you do the concrete repairs around the openings?

Yes, as the engineer's report specifies. The engineer reviews them as the report requires before the new window is set.

Some owners already replaced their windows. What happens to those?

They are handled case by case with the board, following the building's documents.

Is my unit left open overnight?

No. Every unit is closed and weathertight at the end of each day.

Does the work need a permit?

Yes. The permit is pulled with the Town of Surfside and included in the estimate.

Are you licensed and insured?

Yes. FF Builders is a Florida Certified General Contractor, licensed and insured, with certificates for the association as required.

More in Surfside

One contractor, condo or house.

FF Builders is a Florida Certified General Contractor working across Surfside, from the condos on Collins Avenue to the homes west of Harding Avenue. Kitchens, baths, floors, windows and concrete repair are the same company, with one person answering the phone from the first visit to the final inspection.

Whole-building window replacement · General contractor in Surfside · Building facade restoration in Surfside · Impact windows in Surfside · Impact doors in Surfside · Whole-building window replacement in Bal Harbour · Whole-building window replacement in Bay Harbor Islands · Whole-building window replacement in Miami Beach

Free in-home visit

Windows and facade, one project, one opening at a time.

Tell us roughly what you're thinking. We come out, measure, and leave you with a real number. No obligation, and no decision required before you book.

  • A firm written price — material, labor, removal and haul-away.
  • Licensed & insured Florida crews — on every single job.
  • We call you back fast — during business hours, same or next day.

Book your in-home visit

Free, no obligation. Decide after you see the numbers.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

Mon–Fri, 8am–6pm ET · Serving Miami-Dade & Broward.