We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.

A gut renovation in Bay Harbor Islands usually means one of two things: a mid-century house on the west island, or an apartment in one of the low and mid-rise buildings on the east island. The work inside is similar. What decides the plan around it is not.
We got your request and will call to set the visit (Mon–Fri, 8am–6pm ET).
How it works
In a house, the question is how much you can spend before the FEMA 50% rule applies, if the property is in a flood zone. In an apartment, it is what the association allows, when work can happen and how materials get in and out of a building that was not designed for it. On the visit we sort out which applies to you before anything is priced.
What we renovate in Bay Harbor Islands
Everything stripped to the slab and the block, with debris out in scheduled loads.
Walls moved where the structure allows, to open old closed-off plans.
Rusted steel and spalling found behind the finishes, repaired before closing up.
New from the rough-in up.
New flooring, with sound underlayment where the association requires it.
Old openings replaced with impact units.

What changes in Bay Harbor Islands
On the west island, the houses being gutted are usually block houses from the decades after the Town was incorporated in 1947. If the property is in a flood zone, the FEMA 50% rule caps how much you can put into the existing house before it has to meet current flood requirements. Sometimes the answer is to phase the work; sometimes it is to compare the gut with a rebuild. We put the numbers on the table before demolition starts.
On the east island, along East Bay Harbor Drive, many apartment buildings date from the fifties to the seventies. Gutting a unit there means working inside an association, often a small one, sometimes run by the owners themselves. Approval, work hours, use of the elevator or stairs, debris removal and sound underlayment under the new floor are the association's call. And since Surfside in 2021, many of these buildings are going through recertification and milestone inspections, so the timing of your unit can depend on what is happening to the building.
Once the finishes come off, older concrete shows what decades of salt air did to it: rusted steel, cracked slabs, patched beams. Wiring and plumbing from that era usually go entirely. We price the likely surprises as allowances on the estimate, so opening the walls does not reopen the budget.
What's in the price
Demolition, structure and every finish on one schedule, with one contact who knows what was found behind each wall.
The part that separates builders here
A gut priced from the finishes misses what is behind them. On a mid-century property near the bay, that is usually concrete and old systems.
Homeowners
We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.
Extremely professional company and very dedicated to their clients! Their work was impeccable and I was very pleased with their services!
The work they did on our house was fantastic. The crew was efficient with their time and courteous with coming in and out of our home. I will recommend them to all my friends and family! Honest and great people to work with.
Best service ever! They take care of every detail! Always on time, everything came up as I wanted. Thank you!
The absolute best! Would definitely recommend 100%!!
They are the best! Everything was perfect. Super responsible, reliable and always on time. I recommend them 100%.
Google Business Profile rating recorded September 14, 2026. Read them on Google.
Before you hire anyone
If the property is in a flood zone, the FEMA 50% rule often decides it. We price the gut and a rebuild side by side so you can compare before demolition.
Usually, with the association's approval and within its rules for hours, access and debris. Check with your association first; we plan around what it requires.
It can. If the building is doing concrete or balcony repair, access and timing may be limited. Ask your association what is scheduled.
Yes. Phasing can help with the 50% rule or with timing around the building. We show you what each phase includes.
Yes. FF Builders is a Florida Certified General Contractor, licensed and insured.
More in Bay Harbor Islands
FF Builders is a Florida Certified General Contractor working across Bay Harbor Islands, from the mid-century apartment buildings on the east island to the homes on the water. Kitchens, baths, floors, windows and concrete repair are the same company, with one person answering the phone from the first visit to the final inspection.
Whole-house gut renovation · General contractor in Bay Harbor Islands · Home remodeling in Bay Harbor Islands · Interior demolition in Bay Harbor Islands · Teardown and rebuild in Bay Harbor Islands · Condo renovation in Bay Harbor Islands · Whole-house gut renovation in Bal Harbour · Whole-house gut renovation in Surfside · Whole-house gut renovation in Miami Beach
Free in-home visit
Tell us roughly what you're thinking. We come out, measure, and leave you with a real number. No obligation, and no decision required before you book.
We got your request and will call to set the visit during business hours (Mon–Fri, 8am–6pm ET).