We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.

A building painted over cracks is painted again in three years. We repair the stucco and seal the cracks first, then paint with coatings made for Miami.
We got your request and will call to set the visit (Mon–Fri, 8am–6pm ET).
How it works
The visit checks the walls on every elevation: cracks, hollow stucco, rust stains, old sealant and how the current paint is holding.
What we do
Cracked and hollow stucco cut out and patched.
Cracks routed and sealed before coating.
Spalled concrete with rusted steel repaired.
Window and joint sealants replaced.
Primers and elastomeric or acrylic finishes.
Stairwells, walkways and garages.

How a building repaint works
Most of a good repaint happens before the first coat. Walls are pressure washed, loose paint is removed, cracks are routed and sealed, hollow stucco is cut out and patched, and any concrete with rusting steel is repaired.
Old sealant around windows and at joints is replaced, because that is where water enters behind a fresh coat of paint.
The coating system is chosen for the wall and the exposure: a primer suited to the surface and a finish, often elastomeric, made to bridge hairline cracks and handle sun and salt air.
Work moves elevation by elevation, with residents notified, balconies scheduled and cars protected.
What's in the price
Wall repair and coating in one contract.
The part that separates painting contractors
The low bid paints over cracks and old sealant. In two summers the cracks are back and the water is behind the paint.
Homeowners
We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.
Extremely professional company and very dedicated to their clients! Their work was impeccable and I was very pleased with their services!
The work they did on our house was fantastic. The crew was efficient with their time and courteous with coming in and out of our home. I will recommend them to all my friends and family! Honest and great people to work with.
Best service ever! They take care of every detail! Always on time, everything came up as I wanted. Thank you!
The absolute best! Would definitely recommend 100%!!
They are the best! Everything was perfect. Super responsible, reliable and always on time. I recommend them 100%.
Google Business Profile rating recorded September 14, 2026. Read them on Google.
Before you build
It depends on the coating, the exposure and how well the walls were prepared. Sun and salt air shorten the life of any finish. A repaint with real repairs and the right coating lasts much longer than one that only covers the surface.
A thick, flexible coating that can bridge hairline cracks and resist water. It is common on stucco in South Florida. Whether it is the right choice depends on the wall and the existing coating.
The building height and access, the amount of stucco and concrete repair, sealant replacement and the coating system. Repairs are the variable part, which is why they are itemized.
Residents are notified by elevation, balcony access is scheduled, and cars near the work are protected. Windows are masked while spraying or rolling nearby.
Yes. Railing replacement, balcony waterproofing and window sealant are often scheduled with the repaint, since the access is already in place.
Most associations choose light colors that reflect heat and show less fading in the sun. A test area on the building, viewed in morning and afternoon light, is the best way for the board to decide before the whole facade is painted.
Two painting bids for the same building can describe very different jobs. Compare the surface preparation, the stucco repair, the sealant work around windows and doors, the paint system, the number of coats and which surfaces are included: walls, railings, doors, soffits and the garage.
Ask each bidder to price stucco repair by unit, so the association can compare what happens when more cracks are found than expected. The cheapest bid often skips preparation, and preparation is what makes paint last.
With large samples painted directly on the building, on more than one elevation, seen at different times of day. A color chip under office lights looks nothing like a full wall under Miami sun.
Once the board approves the colors, the codes go into the contract and every coat follows them. Some associations also check with the city or their own documents about color rules before deciding, which is a question for the association and its attorney.
Rain and wind are what slow exterior painting. The drier months are usually easier, but many Miami buildings also prefer to avoid peak season, when more residents are in town and balconies are in use.
We plan around both. Paint is applied only when the surface and the weather allow it, and the schedule has room for rain days, so a stormy week moves the calendar instead of forcing paint onto a wet wall.
Ask what the warranty covers and for how long, both for the workmanship and for the paint product itself. Manufacturer warranties often depend on the product being applied over a properly prepared surface with the specified number of coats.
We document the preparation and the system used, so the association has the records a manufacturer asks for. The warranty terms are written into the contract before the work starts, not explained after the scaffolding comes down.
Keep sealants around windows and doors in good condition, fix cracks before water gets behind the stucco, keep irrigation off the walls and rinse surfaces that collect salt and dirt. Most paint failures in Miami start with water, not with the paint itself.
At close-out we leave management a record of the colors, codes and products used, plus touch-up paint from the same batch. A walk of the building at regular intervals catches small problems while they are still small.
Paint applied over cracks that were never repaired, sealants left old and failing behind fresh paint, colors that look different on the building than on the chip, and residents surprised by crews outside their windows.
We repair before we paint, approve colors on the wall, and give management the schedule by elevation so residents know when to close blinds and move items off the balcony.
Before you hire anyone
Yes. Mid-rises, towers and townhome communities.
Yes. Cracks, hollow stucco and concrete are repaired first.
Yes, as part of the prep.
A coating system chosen for the wall and the exposure, often elastomeric on stucco.
Yes, on schedule and resident notices.
Yes, as the association requires.
It depends on the building. You get a schedule by elevation.
Yes. FF Builders is a Florida Certified General Contractor, licensed and insured.
One contractor
FF Builders is a Florida Certified General Contractor working across Miami-Dade and Broward. Design, structure, systems and finishes are one company, one contract and one person on the phone from the first visit to the final inspection.
Commercial painting · Facade restoration · Stucco repair · Parking garage painting
Free in-home visit
Tell us roughly what you're thinking. We come out, measure, and leave you with a real number. No obligation, and no decision required before you book.
We got your request and will call to set the visit during business hours (Mon–Fri, 8am–6pm ET).