We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.

A Bay Harbor Islands lobby is usually small: one door, one elevator, the mailboxes and the parking right beside it. We plan the renovation so nobody is ever locked out, and price it in writing within 24 hours.
We got your request and will call to set the visit (Mon–Fri, 8am–6pm ET).
How it works
In a building with a single entrance and a single elevator, the lobby is not a showpiece that can close for a few weeks. It is the only way to the stairs, the elevator and the mail. In many buildings on the east island it also opens straight onto the parking under the building, so cars, bikes, groceries and deliveries all pass through the same few steps of floor. At the visit we map how people actually move through it before we draw anything.
What we renovate in Bay Harbor Islands
Porcelain, stone or restored original floor, chosen for wet shoes and a ground-floor slab.
Patched, paneled or textured, and painted.
Impact-rated glass doors at the street.
Rebuilt and finished around the mailbox units.
Ceiling and wall fixtures, and the entry outside.
Finished to match on the ground floor and every floor above.

What is different in Bay Harbor Islands
The lobby sits at the lowest finished level of the building, on an island in Biscayne Bay. If the building is in a flood zone, what goes on that floor and the lower part of the walls should be chosen for water: tile or stone instead of wood, cement board instead of drywall at the base, finishes that can be cleaned and dried instead of torn out. That choice costs little at the design stage and a lot after the first storm. The permit drawings account for the flood rules that apply to the building.
Many older buildings here still have their original mid-century floor under later tile or carpet. Sometimes it is worth restoring; sometimes it is too cracked or too uneven to save. We open a small test area before the board decides, so the choice is made on what is actually there.
With one way in, the work goes in phases. One half of the floor is done while the other half carries traffic, with a protected path from the door to the elevator and the mailboxes at all times. Loud work and deliveries are timed with the association, and because the street is narrow and parking is scarce, material drops are booked in advance so nobody's car is blocked in.
What's in the price
Residents keep using the lobby the whole time. The plan is built around that.
The part that separates lobby contractors
In a small bayside building, the risk is choosing the lobby like a living room. The board pays for wood and drywall at floor level and pays again after the next high water.
Homeowners
We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.
Extremely professional company and very dedicated to their clients! Their work was impeccable and I was very pleased with their services!
The work they did on our house was fantastic. The crew was efficient with their time and courteous with coming in and out of our home. I will recommend them to all my friends and family! Honest and great people to work with.
Best service ever! They take care of every detail! Always on time, everything came up as I wanted. Thank you!
The absolute best! Would definitely recommend 100%!!
They are the best! Everything was perfect. Super responsible, reliable and always on time. I recommend them 100%.
Google Business Profile rating recorded September 14, 2026. Read them on Google.
Before you hire anyone
Yes. We work in halves, with a protected path from the door to the elevator, stairs and mailboxes the whole time.
Sometimes. We open a small test area first, then the board decides between restoring it and replacing it.
It changes the materials at floor level. If the building is in a flood zone, finishes that tolerate water are the safer choice, and the permit drawings follow the rules that apply.
Yes. The landings are finished to match on the same schedule.
Furniture is your supplier's. Mailbox units are ordered to the building's choice, and we build and finish the wall around them.
Yes. FF Builders is a Florida Certified General Contractor, licensed and insured, with certificates for the association.
More in Bay Harbor Islands
FF Builders is a Florida Certified General Contractor working across Bay Harbor Islands, from the mid-century apartment buildings on the east island to the homes on the water. Kitchens, baths, floors, windows and concrete repair are the same company, with one person answering the phone from the first visit to the final inspection.
Condo lobby renovation · General contractor in Bay Harbor Islands · Condo corridor renovation in Bay Harbor Islands · Impact doors in Bay Harbor Islands · Parking garage painting in Bay Harbor Islands · Condo lobby renovation in Bal Harbour · Condo lobby renovation in Surfside · Condo lobby renovation in Miami Beach
Free in-home visit
Tell us roughly what you're thinking. We come out, measure, and leave you with a real number. No obligation, and no decision required before you book.
We got your request and will call to set the visit during business hours (Mon–Fri, 8am–6pm ET).