The lobby is the first thing owners, buyers and guests see. We rebuild it while the building stays open, with a path in and out every day of the job.
We got your request and will call to set the visit (Mon–Fri, 8am–6pm ET).
How it works
Residents, deliveries and the front desk use the lobby all day. The visit plans the phases, the temporary desk and the entry path before anything is priced.
What we rebuild
Large-format porcelain, stone or terrazzo.
Custom reception desk and millwork.
Stone, wood slat walls, wall covering and paint.
Dropped ceilings, coves and new fixtures.
Rebuilt for today's delivery volume.
Doors and storefront glass.

How a lobby renovation works
A lobby is renovated in phases. One side is closed off behind clean partitions while the other stays open, with a protected path from the entrance to the elevators.
The front desk moves to a temporary position, and package and mail areas keep working. Deliveries are scheduled around the building's busiest hours.
Flooring is set flat and protected as it goes, walls and millwork are installed, and the ceiling and lighting are finished last so the space comes together at once.
Many lobby renovations also redo the package room, which most older buildings were never designed for.
What's in the price
Finishes, millwork and logistics in one contract.
The part that separates lobby contractors
The design is the easy part. Keeping the building working while the lobby is a construction site is what decides how residents remember the project.
Homeowners
We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.
Extremely professional company and very dedicated to their clients! Their work was impeccable and I was very pleased with their services!
The work they did on our house was fantastic. The crew was efficient with their time and courteous with coming in and out of our home. I will recommend them to all my friends and family! Honest and great people to work with.
Best service ever! They take care of every detail! Always on time, everything came up as I wanted. Thank you!
The absolute best! Would definitely recommend 100%!!
They are the best! Everything was perfect. Super responsible, reliable and always on time. I recommend them 100%.
Google Business Profile rating recorded September 14, 2026. Read them on Google.
Before you build
The size of the lobby, the flooring, the front desk and millwork, the ceiling and lighting design, and whether the entrance and package room are included. Stone and custom millwork are usually the largest lines.
Yes. It is renovated in phases, with a protected path to the elevators and the front desk moved to a temporary spot.
Many boards hire an interior designer for the lobby. We build from their design, or help the board choose finishes when there is none.
It depends on the scope and on lead times for stone, millwork and fixtures. Materials are ordered before demolition to keep the lobby under construction for the shortest time possible.
Older buildings were not designed for today's deliveries. Adding shelving, lockers space or a dedicated room is often part of the renovation.
Yes. Entry doors, storefront glass, the canopy and the drop-off area are often renovated with the lobby, because they are the first thing residents and visitors see. Impact-rated entrance doors are installed with the anchoring their approval requires and permitted with the rest of the work.
Look for a contractor who has built occupied lobbies, can read a designer's drawings and can show finished work in buildings like yours. Ask how they keep the entrance open, how they protect the elevators and how they handle the front desk while it is being rebuilt.
Ask also who will be on site every day and who the manager talks to. A lobby is the most visible project a board approves, and the person running it matters as much as the price.
Lobby bids only compare well when they price the same drawings and the same finish selections. If the designs are not final, ask every bidder to price the same allowance for stone, lighting and furniture so the numbers mean the same thing.
Look at what each bid excludes: the desk, the mailboxes, the ceiling, the lighting controls, the entrance doors. The exclusions usually explain most of the difference between bids.
With physical samples on site, seen under the lobby's own light. Stone, wood, metal and wall finishes look different in a showroom than next to the building's windows and existing elevators.
We put a sample board together with the designer or the board's selections and bring it to the meeting. Once the board signs off, those selections are fixed, and any change after that is priced and approved in writing before it is made.
In many Miami buildings the lobby is busiest when seasonal residents are in town, so boards often prefer to work in the months when occupancy is lower. Long-lead items like stone, custom millwork and light fixtures should be ordered well before the work starts.
We plan the schedule backward from the date the board wants the lobby open, so demolition does not start until the materials are in hand. A lobby left half finished waiting for stone is the outcome everyone wants to avoid.
They do not have to be done at the same time, but they should be designed together. When the lobby is finished in one style and the corridors are redone years later in another, the building feels like two projects.
Some associations finish the lobby first and the corridors in a later budget year, with the same specifications. That spreads the cost and still gives the building one consistent look from the entrance to each unit door.
Stone needs the right cleaning products and periodic sealing, wood needs protection from direct sun, and high-traffic floors need walk-off mats at the entrance to keep sand out. Salt air and humidity are hard on metal finishes near the doors.
At close-out the association receives the care instructions for each finish, product codes and extra material for repairs. A short walk with management a few months after completion catches small issues before they become visible to every resident.
Before you hire anyone
Yes. Flooring, desk, walls, ceilings, lighting and mailrooms.
Yes. It is renovated in phases with a protected path.
Yes.
Yes, as part of the millwork.
Yes. They are often part of a lobby renovation.
Yes, as the association requires.
It depends on scope and lead times. You get a timeline in writing.
Yes. FF Builders is a Florida Certified General Contractor, licensed and insured.
One contractor
FF Builders is a Florida Certified General Contractor working across Miami-Dade and Broward. Design, structure, systems and finishes are one company, one contract and one person on the phone from the first visit to the final inspection.
Corridor renovation · Amenity renovation · Marble and stone · Custom millwork
Free in-home visit
Tell us roughly what you're thinking. We come out, measure, and leave you with a real number. No obligation, and no decision required before you book.
We got your request and will call to set the visit during business hours (Mon–Fri, 8am–6pm ET).