FF BuildersFF Builders
Renovated condo lobby with marble-look floor, wood front desk and glass entrance
Bay Harbor Islands · One way in · Ground floor, flood zone

Condo lobby renovation
in Bay Harbor Islands.

A Bay Harbor Islands lobby is usually small: one door, one elevator, the mailboxes and the parking right beside it. We plan the renovation so nobody is ever locked out, and price it in writing within 24 hours.

Google5.0★★★★★Licensed & insuredPermits includedWritten estimate

Book your in-home visit

Free, no obligation. You don't need to have it all figured out before booking.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

5.0 ★★★★★ on GoogleLicensed Florida GCInsured every jobFirm written price

How it works

Every resident walks through it, every day.

In a building with a single entrance and a single elevator, the lobby is not a showpiece that can close for a few weeks. It is the only way to the stairs, the elevator and the mail. In many buildings on the east island it also opens straight onto the parking under the building, so cars, bikes, groceries and deliveries all pass through the same few steps of floor. At the visit we map how people actually move through it before we draw anything.

  1. You reach outForm or call. We call back to book a free visit, evenings and Saturdays included.
  2. We map the lobbyEntrance, elevator, stairs, mailboxes, the door to the parking, floor level against the outside, and where water has come in before.
  3. You get the estimate in writing, within 24 hoursPriced by phase, with the walking path kept open in each one.
  4. You decideRead it, compare it, call when you are ready. Nothing starts before you sign.

What we renovate in Bay Harbor Islands

Small room,
everything in it.

Flooring

Porcelain, stone or restored original floor, chosen for wet shoes and a ground-floor slab.

Walls and ceilings

Patched, paneled or textured, and painted.

Entrance doors

Impact-rated glass doors at the street.

Mailbox wall

Rebuilt and finished around the mailbox units.

Lighting

Ceiling and wall fixtures, and the entry outside.

Elevator landing

Finished to match on the ground floor and every floor above.

Crew finishing the walls of a condo lobby with stone floors

What is different in Bay Harbor Islands

Ground floor,
on an island.

The lobby sits at the lowest finished level of the building, on an island in Biscayne Bay. If the building is in a flood zone, what goes on that floor and the lower part of the walls should be chosen for water: tile or stone instead of wood, cement board instead of drywall at the base, finishes that can be cleaned and dried instead of torn out. That choice costs little at the design stage and a lot after the first storm. The permit drawings account for the flood rules that apply to the building.

Many older buildings here still have their original mid-century floor under later tile or carpet. Sometimes it is worth restoring; sometimes it is too cracked or too uneven to save. We open a small test area before the board decides, so the choice is made on what is actually there.

With one way in, the work goes in phases. One half of the floor is done while the other half carries traffic, with a protected path from the door to the elevator and the mailboxes at all times. Loud work and deliveries are timed with the association, and because the street is narrow and parking is scarce, material drops are booked in advance so nobody's car is blocked in.

What's in the price

Open every day
of the job.

Residents keep using the lobby the whole time. The plan is built around that.

  • Traffic plan — a protected path to the elevator and mail
  • Test opening — original floor checked before the board decides
  • Water-ready finishes — chosen for a ground-floor slab
  • Association package — certificate of insurance and building rules
  • Permit — pulled, inspected and closed when required
  • Booked deliveries — around the narrow street and the parking
  • Daily clean-up — lobby presentable every evening

The part that separates lobby contractors

A pretty lobby that floods
is a second project.

In a small bayside building, the risk is choosing the lobby like a living room. The board pays for wood and drywall at floor level and pays again after the next high water.

Homeowners

Rated 5.0 on Google.

5.0
★★★★★
Google rating · every review, five stars
Google
K Kelsey BarbosaGoogle review Google
★★★★★

We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.

S Sasha AbouGoogle review Google
★★★★★

Extremely professional company and very dedicated to their clients! Their work was impeccable and I was very pleased with their services!

G Gabriel BarbosaGoogle review Google
★★★★★

The work they did on our house was fantastic. The crew was efficient with their time and courteous with coming in and out of our home. I will recommend them to all my friends and family! Honest and great people to work with.

S sara bouGoogle review · Local Guide Google
★★★★★

Best service ever! They take care of every detail! Always on time, everything came up as I wanted. Thank you!

D deborah medel-gimenezGoogle review Google
★★★★★

The absolute best! Would definitely recommend 100%!!

M Monica BecharaGoogle review · Local Guide Google
★★★★★

They are the best! Everything was perfect. Super responsible, reliable and always on time. I recommend them 100%.

Google Business Profile rating recorded September 14, 2026. Read them on Google.

Before you hire anyone

The ones people actually ask.

We only have one entrance. Can the lobby stay open?

Yes. We work in halves, with a protected path from the door to the elevator, stairs and mailboxes the whole time.

Our building has its original floor under the tile. Can it be saved?

Sometimes. We open a small test area first, then the board decides between restoring it and replacing it.

Does being in a flood zone change the lobby?

It changes the materials at floor level. If the building is in a flood zone, finishes that tolerate water are the safer choice, and the permit drawings follow the rules that apply.

Can you renovate the elevator landings upstairs too?

Yes. The landings are finished to match on the same schedule.

Who supplies the furniture and the mailbox units?

Furniture is your supplier's. Mailbox units are ordered to the building's choice, and we build and finish the wall around them.

Are you licensed and insured?

Yes. FF Builders is a Florida Certified General Contractor, licensed and insured, with certificates for the association.

More in Bay Harbor Islands

One contractor, apartment or house.

FF Builders is a Florida Certified General Contractor working across Bay Harbor Islands, from the mid-century apartment buildings on the east island to the homes on the water. Kitchens, baths, floors, windows and concrete repair are the same company, with one person answering the phone from the first visit to the final inspection.

Condo lobby renovation · General contractor in Bay Harbor Islands · Condo corridor renovation in Bay Harbor Islands · Impact doors in Bay Harbor Islands · Parking garage painting in Bay Harbor Islands · Condo lobby renovation in Bal Harbour · Condo lobby renovation in Surfside · Condo lobby renovation in Miami Beach

Free in-home visit

A lobby that stays open while it changes.

Tell us roughly what you're thinking. We come out, measure, and leave you with a real number. No obligation, and no decision required before you book.

  • A firm written price — material, labor, removal and haul-away.
  • Licensed & insured Florida crews — on every single job.
  • We call you back fast — during business hours, same or next day.

Book your in-home visit

Free, no obligation. Decide after you see the numbers.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

Mon–Fri, 8am–6pm ET · Serving Miami-Dade & Broward.