FF BuildersFF Builders
FF Builders crew setting tile in a condo unit with a water view
Bal Harbour · Association, then the Village · One file

Condo renovation approval
in Bal Harbour.

A unit renovation in Bal Harbour goes through two doors: the association, then the Village. We prepare what each one asks for, in the right order, with a written estimate within 24 hours.

Google5.0★★★★★Licensed & insuredPermits includedWritten estimate

Book your in-home visit

Free, no obligation. You don't need to have it all figured out before booking.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

5.0 ★★★★★ on GoogleLicensed Florida GCInsured every jobFirm written price

How it works

Two approvals. One after the other.

The towers on Collins Avenue are run by associations that take renovations seriously, and the Village of Bal Harbour, a municipality of its own since 1946, runs its own building department. Most delays come from doing the two out of order, or sending an incomplete package to either. At the visit we read your building's renovation rules with you before the scope is final.

  1. You reach outForm or call. We call back to book a free visit, evenings and Saturdays included.
  2. We read the building's rulesRenovation guidelines, insurance requirements, flooring and sound rules, work hours and deposits.
  3. You get the estimate in writing, within 24 hoursItemized by room, with the association package and the permit steps listed as part of the job.
  4. You decideRead it, compare it, call when you are ready. Nothing starts before you sign.

What we prepare in Bal Harbour

The paperwork
and the work.

Association package

Scope, drawings, product sheets, schedule and contractor documents.

Certificate of insurance

Issued with the building and the association named as required.

Village permit

Applied for with the plans the scope requires, and closed after inspections.

Sound underlayment

Specified to the building's rule and documented for the board.

Kitchen and bath

The most common scopes in a unit approval.

Full unit renovation

From approval to final inspection.

Condo kitchen under renovation with protected floors and a water view

What is different in Bal Harbour

The association first.
Then the Village.

Associations in Bal Harbour towers usually want to see the whole job before they say yes: what is being done in each room, drawings when walls or plumbing move, the product sheets for flooring and its underlayment, the contractor's license and insurance, and the schedule. Some ask for a deposit against damage to common areas. We put that package together from the scope, so it answers the questions the board will ask.

With the association's approval in hand, the permit is applied for with the Village. The Village of Bal Harbour has its own building department, separate from the larger cities around it, and its own review. The plans go in with what the scope needs, and the inspections are scheduled as the work reaches each stage. If something in your scope raises a question that only the Village can answer, we tell you to check with the Village before the design is final, not after.

Then the building's logistics: service elevator reservations, corridor and elevator protection, the loading dock, and the hours the association allows. Workdays in a tower are shorter than in a house, and the schedule you get with the estimate is built on that, so the date you are given is a date the building will actually let us keep.

What's in the price

Approved, permitted,
then built.

You decide what you want done. We handle the steps between that and the first day of work.

  • Rules review — your building's renovation guidelines, read before the scope is final
  • Association package — scope, drawings, product sheets and schedule
  • Insurance certificate — named as the building requires
  • Village permit — applied for, inspected and closed
  • Building logistics — elevator, protection and dock booked
  • Renovation — the work itself, by the same company

The part that separates condo contractors

An approval that comes back
is time you lose.

Boards return packages that are missing a product sheet, a drawing or the right insurance wording. In a Bal Harbour tower, each return pushes the start date and the building's calendar with it.

Homeowners

Rated 5.0 on Google.

5.0
★★★★★
Google rating · every review, five stars
Google
K Kelsey BarbosaGoogle review Google
★★★★★

We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.

S Sasha AbouGoogle review Google
★★★★★

Extremely professional company and very dedicated to their clients! Their work was impeccable and I was very pleased with their services!

G Gabriel BarbosaGoogle review Google
★★★★★

The work they did on our house was fantastic. The crew was efficient with their time and courteous with coming in and out of our home. I will recommend them to all my friends and family! Honest and great people to work with.

S sara bouGoogle review · Local Guide Google
★★★★★

Best service ever! They take care of every detail! Always on time, everything came up as I wanted. Thank you!

D deborah medel-gimenezGoogle review Google
★★★★★

The absolute best! Would definitely recommend 100%!!

M Monica BecharaGoogle review · Local Guide Google
★★★★★

They are the best! Everything was perfect. Super responsible, reliable and always on time. I recommend them 100%.

Google Business Profile rating recorded September 14, 2026. Read them on Google.

Before you hire anyone

The ones people actually ask.

Do I need the association's approval before the permit?

In most buildings, yes. The association approves the work in the building, and the Village of Bal Harbour issues the permit. Check your building's rules for the order they require.

What does the association usually ask for?

Scope, drawings when walls or plumbing move, product sheets, the contractor's license and insurance, and the schedule. Some also ask for a deposit.

Does every renovation need a Village permit?

Not every one. Plumbing, electrical, structural and window work usually do. Check with the Village for your scope; the permit is part of our price where it applies.

I am abroad. Do I need to be there for the approval?

No. You sign what the building needs to see from the owner, and we submit the rest and keep you updated.

Why is the workday shorter in my building?

The association sets the hours for noise and elevator use. The schedule is built around them from the start.

Are you licensed and insured?

Yes. FF Builders is a Florida Certified General Contractor, licensed and insured, with certificates issued as your building requires.

More in Bal Harbour

One contractor, unit or house.

FF Builders is a Florida Certified General Contractor working across Bal Harbour, from oceanfront condo units on Collins Avenue to the homes on the bay. Kitchens, baths, floors, windows and concrete repair are the same company, with one person answering the phone from the first visit to the final inspection.

Condo renovation approval · General contractor in Bal Harbour · Condo renovation in Bal Harbour · Condo soundproof flooring in Bal Harbour · Condo renovation for owners abroad in Bal Harbour · Condo renovation approval in Surfside · Condo renovation approval in Bay Harbor Islands · Condo renovation approval in Miami Beach

Free in-home visit

Your Bal Harbour unit, approved and built.

Tell us roughly what you're thinking. We come out, measure, and leave you with a real number. No obligation, and no decision required before you book.

  • A firm written price — material, labor, removal and haul-away.
  • Licensed & insured Florida crews — on every single job.
  • We call you back fast — during business hours, same or next day.

Book your in-home visit

Free, no obligation. Decide after you see the numbers.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

Mon–Fri, 8am–6pm ET · Serving Miami-Dade & Broward.