FF BuildersFF Builders
Large open condo created by combining two units, with a long island and ocean views
Surfside · Two units, one home · Engineering first

Condo unit combination
in Surfside.

Two units mean two of everything: two kitchens, two electrical panels, two air handlers, two front doors. Combining them in a Surfside condo is mostly about deciding what stays, what goes and what the building allows.

Google5.0★★★★★Licensed & insuredPermits includedWritten estimate

Book your in-home visit

Free, no obligation. You don't need to have it all figured out before booking.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

5.0 ★★★★★ on GoogleLicensed Florida GCInsured every jobFirm written price

How it works

We count everything there are two of.

Many of the older condo buildings on Collins Avenue have units that feel small for a family, and buying the one next door is a common way to stay by the beach in Surfside with more room. At the visit we walk both units and list what each one has: kitchen, panel, air handler, water heater, entry door, plumbing walls. That list shapes the plan and the price.

  1. You reach outForm or call. We call back to book a free visit, evenings and Saturdays included.
  2. We walk both unitsThe shared wall, both kitchens and baths, panels, air handlers, water heaters, both entry doors and the plumbing walls.
  3. You get the estimate in writing, within 24 hoursItemized, with engineering, approvals and construction as separate phases.
  4. You decideRead it, compare it, call when you are ready. Nothing starts before you sign.

What we do in Surfside

Two units in,
one home out.

Opening the shared wall

With engineering when the wall is structural.

New layout

One kitchen, the bedrooms and baths you want, planned across both units.

Kitchen

The second kitchen removed and one new kitchen built.

Bathrooms

Baths kept, combined or rebuilt in the new plan.

Second entry door

Closed and finished as the building and the fire code require.

Flooring through

One continuous floor with the sound underlayment the building requires.

Steel beam installed in a wide new opening during a condo renovation

What is different in Surfside

Two of everything,
and one building to answer to.

The shared wall is the first question and the engineer answers it. In some buildings it is a partition; in others it carries load, holds plumbing risers for the floors above and below, or has conduit running through it. Any opening is designed by the engineer, approved by the association and permitted with the Town of Surfside before we touch it. Surfside associations look at anything structural with real care, and the approval is planned into the schedule from the start, not squeezed in later.

Then come the duplicates. One kitchen usually goes, and its water and drain lines have to be capped where the building allows. Two electrical panels and two air handlers may stay as they are, be combined, or be resized for the new layout, depending on the building's rules and the engineer. Two water heaters, two sets of meters, two mailboxes and two parking spaces are the association's to decide. We list every one of them in the estimate, so nothing is discovered after the wall is open.

The second entry door is the detail people forget. It opens onto a rated corridor, so closing it is not just framing a wall: it has to be closed and finished the way the building and the fire code require, and the corridor side has to match the rest of the floor. Some associations also need changes to the condo documents for a combination, which the association and its attorney handle.

What's in the price

One contract,
from engineering to the final inspection.

Engineering, approvals and construction are planned as one project.

  • Both units surveyed — everything there are two of, listed
  • Engineering coordinated — the shared wall and any structural change
  • Association package — the documents the building asks for
  • Permit — pulled with the Town of Surfside
  • Systems plan — panels, air handlers and plumbing decided
  • Construction — one crew, one schedule
  • Final inspection — with the Town and the association

The part that separates combination contractors

Demolition before engineering
is how combinations stall.

The shortcut is opening the wall to see what is inside. In a Surfside condo, that stops the project with the association before it starts.

Homeowners

Rated 5.0 on Google.

5.0
★★★★★
Google rating · every review, five stars
Google
K Kelsey BarbosaGoogle review Google
★★★★★

We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.

S Sasha AbouGoogle review Google
★★★★★

Extremely professional company and very dedicated to their clients! Their work was impeccable and I was very pleased with their services!

G Gabriel BarbosaGoogle review Google
★★★★★

The work they did on our house was fantastic. The crew was efficient with their time and courteous with coming in and out of our home. I will recommend them to all my friends and family! Honest and great people to work with.

S sara bouGoogle review · Local Guide Google
★★★★★

Best service ever! They take care of every detail! Always on time, everything came up as I wanted. Thank you!

D deborah medel-gimenezGoogle review Google
★★★★★

The absolute best! Would definitely recommend 100%!!

M Monica BecharaGoogle review · Local Guide Google
★★★★★

They are the best! Everything was perfect. Super responsible, reliable and always on time. I recommend them 100%.

Google Business Profile rating recorded September 14, 2026. Read them on Google.

Before you hire anyone

The ones people actually ask.

Can any two units be combined?

Not always. It depends on the structure, the building's systems and the association. The engineer and the board decide whether it can be done.

What happens to the second kitchen?

In most combinations it is removed and the lines capped where the building allows, with one new kitchen in the new plan.

Do we keep two electrical panels and two AC units?

Sometimes. It depends on the building's rules, the engineer and the new layout. The estimate shows the options.

What about the second front door?

It is closed and finished as the building and the fire code require, with the corridor side matched to the floor.

Do you handle the engineering?

We coordinate the engineer and build to the design.

What approvals are needed?

Association approval, engineered drawings and a permit from the Town of Surfside. Some buildings also require changes to the condo documents, which the association and its attorney handle.

More in Surfside

One contractor, condo or house.

FF Builders is a Florida Certified General Contractor working across Surfside, from the condos on Collins Avenue to the homes west of Harding Avenue. Kitchens, baths, floors, windows and concrete repair are the same company, with one person answering the phone from the first visit to the final inspection.

Condo unit combination · General contractor in Surfside · Load-bearing wall removal in Surfside · Condo renovation approval in Surfside · Condo renovation in Surfside · Condo unit combination in Bal Harbour · Condo unit combination in Bay Harbor Islands · Condo unit combination in Miami Beach

Free in-home visit

Two units, one home, planned in the right order.

Tell us roughly what you're thinking. We come out, measure, and leave you with a real number. No obligation, and no decision required before you book.

  • A firm written price — material, labor, removal and haul-away.
  • Licensed & insured Florida crews — on every single job.
  • We call you back fast — during business hours, same or next day.

Book your in-home visit

Free, no obligation. Decide after you see the numbers.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

Mon–Fri, 8am–6pm ET · Serving Miami-Dade & Broward.