FF BuildersFF Builders
New daycare classroom with a soft floor, low windows, a child-height sink and cubbies
Classrooms · Child-height fixtures · Floors · Restrooms · Permits

Daycare build-out
in Miami.

Parents see a bright classroom. Inspectors see everything else. We build daycares from shell to opening, with the details planned for children from the first drawing.

Google5.0★★★★★Licensed & insuredPermits includedWritten estimate

Book your in-home visit

Free, no obligation. You don't need to have it all figured out before booking.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

5.0 ★★★★★ on GoogleLicensed Florida GCInsured every jobFirm written price

How it works

Planned at a child's height.

Sinks, windows, hooks, counters and restrooms all sit lower in a daycare. The visit walks the space with your layout and the age groups you plan to serve.

  1. You reach outForm or call. We call back to book a free visit, evenings and Saturdays included.
  2. We walk the spaceWith you, the landlord's requirements and your designer's layout, if there is one.
  3. You get the estimate in writing, within 24 hoursRoom by room, with permits, licensing requirements in planning and a schedule to opening.
  4. You decideRead it, compare it, call when you are ready. Nothing starts before you sign.

What we build

Classrooms built for small hands.

Classrooms

Walls, low windows into halls and doors.

Child-height sinks and restrooms

Fixtures and counters at their height.

Floors

Soft, durable and easy to clean.

Cubbies and cabinets

Built-in storage at child and adult height.

Doors and hardware

Openings and hardware to your plan.

Office and staff areas

Front desk, office, kitchen counters and storage.

Daycare classroom walls framed with low windows while a low cabinet is installed

How a daycare build-out works

Built low,
planned early.

State licensing and local requirements are part of planning from the start. Your layout, your drawings and the licensing agency's review shape the scope before it is priced.

Classrooms are framed with low windows and vision panels so staff can see in, and with backing wherever cubbies, cabinets and boards will mount.

Plumbing goes in at child height: small sinks in classrooms, low toilets and sinks in restrooms, and adult sinks where staff need them.

Floors, cabinets and finishes go in last. The space is handed over clean, inspected and ready for your furniture and supplies.

What's in the price

Built for children,
ready for inspection.

Construction, permits and inspections in one contract.

  • Layout review — with your drawings and age groups
  • Child-height plumbing — sinks, toilets and counters
  • Vision panels — low windows into classrooms
  • Built-in storage — cubbies and cabinets
  • Soft, cleanable floors — for every classroom
  • Permits and inspections — closed before opening

The part that separates daycare contractors

The classroom was finished.
The sink was at adult height.

A daycare is built at two heights, one for the children and one for the staff. When that is missed, it shows up after the walls are closed.

Homeowners

Rated 5.0 on Google.

5.0
★★★★★
Google rating · every review, five stars
Google
K Kelsey BarbosaGoogle review Google
★★★★★

We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.

S Sasha AbouGoogle review Google
★★★★★

Extremely professional company and very dedicated to their clients! Their work was impeccable and I was very pleased with their services!

G Gabriel BarbosaGoogle review Google
★★★★★

The work they did on our house was fantastic. The crew was efficient with their time and courteous with coming in and out of our home. I will recommend them to all my friends and family! Honest and great people to work with.

S sara bouGoogle review · Local Guide Google
★★★★★

Best service ever! They take care of every detail! Always on time, everything came up as I wanted. Thank you!

D deborah medel-gimenezGoogle review Google
★★★★★

The absolute best! Would definitely recommend 100%!!

M Monica BecharaGoogle review · Local Guide Google
★★★★★

They are the best! Everything was perfect. Super responsible, reliable and always on time. I recommend them 100%.

Google Business Profile rating recorded September 14, 2026. Read them on Google.

Before you build

Building out a daycare: what owners ask

What makes a daycare build-out different?

It is built at two heights and inspected from more than one direction. Children use sinks, toilets, cubbies and windows at their height, while staff need counters, storage and sinks at adult height in the same rooms. Classrooms need visibility from halls and between rooms. Floors and walls are cleaned constantly. And beyond the building permit, a child care center goes through state licensing and local requirements, which shape the layout before construction starts.

How do licensing requirements affect the build-out?

State licensing and local requirements are part of planning. They can affect the size and number of classrooms, restrooms, sinks, exits, outdoor areas and more, depending on the ages and the number of children you plan to serve. Your licensing contact, your designer and the drawings define those requirements for your center. We build to what the drawings, the code, the fire marshal and the licensing agency require, and we raise questions before building instead of after an inspection.

Do I need drawings and a designer?

Almost always. A daycare build-out needs drawings for the permit, and many owners work with a designer or architect who knows child care layouts. If you have one, we build from their plans and price exactly what is drawn. If you are still choosing a space, we can walk it with you and point out where plumbing, restrooms and classrooms will be easier or harder to place. That helps before you sign a lease.

Which spaces work well for a daycare?

Spaces with natural light, easy access from parking, room for classrooms on one level and plumbing that can reach several rooms. Many daycares go into former retail, office or church spaces. Outdoor space, exits and the building's use are part of the review, so it is worth walking a space with your plan before you sign. We can look at what would need to be built and where the cost is likely to concentrate.

What kind of flooring is best?

Floors that are soft enough for children to sit and play on, durable under constant use and easy to clean. Many centers use commercial vinyl or sheet flooring in classrooms and restrooms, sometimes with softer areas for play. Restrooms and areas near sinks need floors that tolerate water. Your designer or your center's standards define the specification, and we install it to stay flat, sealed and easy to clean. Transitions between rooms are kept flush.

How are restrooms and sinks planned?

Around the age groups. Younger groups may need changing areas with nearby sinks, and older groups use small toilets and low sinks. Staff need adult-height sinks too. Each fixture adds plumbing, so the layout is planned around the drains and the slab. Placing classrooms near restrooms and sinks keeps both the cost and the walking down. The drawings set the fixtures, and we build them at the right heights. Counters and mirrors follow the same rule.

Can classrooms have windows into the hallway?

Yes, and many layouts call for them. Low windows and vision panels in walls and doors let staff and directors see into rooms without opening doors. They are framed into the walls during the build-out, with glass and frames chosen for a space used by children. Where glass goes and what kind is used is set by your drawings and reviewed in the permit. Natural light from low windows also makes classrooms feel bigger and brighter for the children inside.

Who supplies furniture, toys and kitchen equipment?

You do, through your own suppliers. We build the space so it is ready for them: walls with backing for anything mounted, outlets where your layout needs them, built-in cubbies and cabinets, and kitchen counters and rough-ins where the drawings place them. Delivery dates are set with your suppliers so they can follow construction without a gap. Sizes of cribs, cots and play structures are set early, so doors and rooms are built to fit them.

How long does a daycare build-out take?

It depends on the size of the space, the drawings, the permit review, the landlord's approvals, the licensing process and lead times on materials. A center built from shell takes longer than a renovation of classrooms in an existing center. The estimate includes a schedule built backward from your target opening, with permits, construction and inspections on one timeline, so the licensing steps can be planned around it. Enrollment can be planned the same way.

Can you renovate a center that is already operating?

Often yes, in phases. A classroom or a wing is closed, renovated and cleaned before children return to it, while the rest of the center stays open. Loud work and deliveries are scheduled outside your hours when possible, and the work area is sealed and kept separate from the children. Each phase has its own schedule and cost. Parents can be told in advance which rooms will move and when, so drop-off stays simple.

What drives the cost?

The number of classrooms and restrooms, how much plumbing is needed, the condition of the space, windows and vision panels, built-in storage, flooring and the finish level of the front of the center. Exterior items like entrances and play areas can add to it. The estimate is itemized room by room, so you can see where the budget goes and adjust finishes without changing the layout. Classrooms can be built in stages too.

Before you hire anyone

The ones people actually ask.

Do you build out daycares?

Yes. Child care centers in Miami-Dade and Broward, from shell or second generation.

Do you build child-height sinks and restrooms?

Yes. Fixtures and counters at the heights your drawings call for.

Are licensing requirements part of the plan?

Yes. They are part of planning from the first drawing.

Can you work from our designer's plans?

Yes. We price and build exactly what is drawn.

Can you renovate while the center is open?

Often, yes. One classroom or wing at a time.

Who supplies furniture and toys?

Your suppliers. We build the space ready for them.

Do you pull the permits?

Yes. Pulled, inspected and closed.

Are you licensed and insured?

Yes. FF Builders is a Florida Certified General Contractor, licensed and insured.

One contractor

The whole project, one contractor.

FF Builders is a Florida Certified General Contractor working across Miami-Dade and Broward. Design, structure, systems and finishes are one company, one contract and one person on the phone from the first visit to the final inspection.

Commercial build-out · ADA accessibility upgrades · Office build-out · Retail store build-out · Commercial painting

Free in-home visit

Your center, built for children.

Tell us roughly what you're thinking. We come out, measure, and leave you with a real number. No obligation, and no decision required before you book.

  • A firm written price — material, labor, removal and haul-away.
  • Licensed & insured Florida crews — on every single job.
  • We call you back fast — during business hours, same or next day.

Book your in-home visit

Free, no obligation. Decide after you see the numbers.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

Mon–Fri, 8am–6pm ET · Serving Miami-Dade & Broward.