FF BuildersFF Builders
Renovated South Florida house raised above grade, the kind of project the 50% rule can require
Biscayne Park · Additions · Substantial improvement

The FEMA 50% rule
in Biscayne Park.

If your Biscayne Park home is in a flood zone, adding a bedroom and redoing the kitchen at the same time can trigger the rule. Know where the line is before you pay for the design.

Google5.0★★★★★Licensed & insuredPermits includedWritten estimate

Book your in-home visit

Free, no obligation. You don't need to have it all figured out before booking.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

5.0 ★★★★★ on GoogleLicensed Florida GCInsured every jobFirm written price

How it works

Growing the house
without crossing the line.

A lot of families in Biscayne Park would rather grow the house they have than leave the Village. The homes are modest, mostly one story, built between the 1930s and the 1950s, and the plan is usually some mix of an addition, a new primary suite and a kitchen or bath that finally gets redone. If the property is in a flood zone, all of that is added up and compared with the value of the building. The visit puts the cost side on paper early, so the design starts from the real number.

  1. You reach outForm or call. We call back to book a free visit, evenings and Saturdays included.
  2. We look at the house and the planWhat you want to add and redo, the condition of the house, how its floor sits relative to the ground, and what you know about its flood zone.
  3. You get the estimate in writing, within 24 hoursItemized, so the cost that counts toward the rule is clear line by line.
  4. You decideRead it, compare it, call when you are ready. Nothing starts before you sign.

Projects where it comes up in Biscayne Park

When the rule usually matters.

Additions

New bedrooms or living space on an older one-story house.

Primary suites

A new suite added to the back or side of the house.

Second stories

Growing up instead of out, on a house built for one floor.

Whole-house renovations

Kitchen, baths, systems and finishes redone together.

Flood and storm rebuilds

Repairs after a flood that are large compared with the house.

Teardown and rebuild

When a new house makes more sense than raising the old one.

New concrete footing with reinforcing steel during a home addition

How the rule meets a modest older house

A modest house
reaches the line sooner.

In a special flood hazard area, if the cost of improvements or repairs equals or exceeds 50% of the market value of the building, the project is a substantial improvement or substantial damage, and the whole building has to meet current flood requirements. The value that counts is the structure only, not the land. A small one-story house from the 1940s can carry a modest building value, so an addition plus a new kitchen and baths can get to that line faster than the family expects.

Meeting current requirements usually means the lowest floor reaches the required elevation. On an older house that sits close to the ground, that can mean raising it, building the addition at a different height than the original, or rethinking the project. The determination belongs to the Village. What we can do is put an itemized number in front of you and show what changes if the scope moves: a smaller addition, a kitchen kept for later, or a second story instead.

There is a second layer in the Village. A raised floor, a new entry with steps or an addition that changes the front of the house is exterior work, and part of it goes through the Village's Planning and Design Review. Both the flood rule and that review belong on the schedule from the first meeting with your architect and engineer, not after the plans are drawn.

What's in the price

Planned around the rule,
not surprised by it.

What you get on a Biscayne Park project that could be near the 50% line.

  • Early itemized estimate — the cost that counts, line by line
  • Scope options — what changes above and below the line
  • Coordination — with your architect, engineer and the Village's permit process
  • Flood-tolerant materials — for areas below the flood elevation
  • Structural work — foundations and framing when elevation is required
  • Permits and inspections — pulled at the Village and closed

The part that separates contractors on additions here

Find out at permit
and the addition is gone.

An addition designed without the 50% math in view is a design you may pay for twice. In Biscayne Park, the flood rule and the exterior review can meet the same project.

Homeowners

Rated 5.0 on Google.

5.0
★★★★★
Google rating · every review, five stars
Google
K Kelsey BarbosaGoogle review Google
★★★★★

We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.

S Sasha AbouGoogle review Google
★★★★★

Extremely professional company and very dedicated to their clients! Their work was impeccable and I was very pleased with their services!

G Gabriel BarbosaGoogle review Google
★★★★★

The work they did on our house was fantastic. The crew was efficient with their time and courteous with coming in and out of our home. I will recommend them to all my friends and family! Honest and great people to work with.

S sara bouGoogle review · Local Guide Google
★★★★★

Best service ever! They take care of every detail! Always on time, everything came up as I wanted. Thank you!

D deborah medel-gimenezGoogle review Google
★★★★★

The absolute best! Would definitely recommend 100%!!

M Monica BecharaGoogle review · Local Guide Google
★★★★★

They are the best! Everything was perfect. Super responsible, reliable and always on time. I recommend them 100%.

Google Business Profile rating recorded September 14, 2026. Read them on Google.

Before you hire anyone

The ones people actually ask.

Does the 50% rule apply to my Biscayne Park house?

Only if the property is in a flood zone. The Village determines it for each project, so ask for your property's requirements before designing.

Does the value of my lot count?

The comparison uses the value of the building only, not the land. That is why a modest older house can reach the line with a project that feels reasonable.

Do the addition and the remodel count together?

Improvements in the same project are added up. That is why we price them line by line, so you can see how each part moves the total.

Is a second story a way around it?

It changes the plan but the cost still counts. In some cases it fits better than spreading the addition across the lot; we compare both on paper.

Can you give me an estimate before I design?

Yes. An itemized estimate early is the clearest way to see where the project falls.

More in Biscayne Park

One contractor for the whole house.

FF Builders is a Florida Certified General Contractor working across Biscayne Park, on the Village's older houses under the canopy. Kitchens, baths, additions, windows and structural work are the same company, with one person answering the phone from the first visit to the final inspection.

FEMA 50% rule · General contractor in Biscayne Park · Home addition in Biscayne Park · Second story addition in Biscayne Park · Flood damage restoration in Biscayne Park · FEMA 50% rule in Miami Shores

Free in-home visit

Grow your Biscayne Park home with the rule in mind.

Tell us roughly what you're thinking. We come out, measure, and leave you with a real number. No obligation, and no decision required before you book.

  • A firm written price — material, labor, removal and haul-away.
  • Licensed & insured Florida crews — on every single job.
  • We call you back fast — during business hours, same or next day.

Book your in-home visit

Free, no obligation. Decide after you see the numbers.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

Mon–Fri, 8am–6pm ET · Serving Miami-Dade & Broward.