We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.

Most houses in Biscayne Park sit low, many on one floor, under trees that are taller than the roof. Going up adds room without giving up the yard, but it puts the new floor into the canopy and onto walls built decades ago. We plan for both.
We got your request and will call to set the visit (Mon–Fri, 8am–6pm ET).
How it works
A second floor puts weight on walls and footings that were sized for one. On a house from the 1930s to the 1950s, we look at the block or frame walls, the foundation, the roof framing and any past additions, and we look up at the branches over the roof. That tells us, before you pay for drawings, whether going up is straightforward or needs reinforcing first.
What goes into it
Footings strengthened where the engineer says the new load needs it.
New floor system, walls and roof tied into the existing house.
New beams where the floor below has to carry more than it was built for.
A stair placed where it costs the ground floor the least.
Impact windows and stucco matched to the original house.

What changes in Biscayne Park
A second story on a low older house changes how it looks from the street more than almost any other project. In Biscayne Park that matters twice: the village is all houses, so the rooflines are the skyline, and the Village has a Planning and Design Review step for part of the exterior work. We design the new floor to sit well on the original house, with a roof, window pattern and stucco that read as one building, and we put the review on the schedule.
The trees are the part people forget. Under a canopy like the one on Griffing Boulevard, the branches that clear a one-story roof can run right through where the new walls will stand. Framing, roofing and the crane or lift have to work around them, and the finished house needs room for wind to move the branches in a storm. If a limb or a tree has to come out, check with the Village before it is cut.
Then there is the house underneath. Walls and footings from the middle of the last century were rarely built for a second floor, and older wiring and plumbing usually get rerouted when the stair and the new rooms go in. Houses are close together here, so a new upper floor also looks into the neighbor's yard; we think about where the windows go before the drawings are final.
What's in the price
The structural check, the reinforcement, the new floor and the review on one schedule, with one person to call.
What separates builders here
On a street of low older houses, a top floor that looks bolted on is visible from every direction. So is a crew that damages the trees getting it built.
Homeowners
We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.
Extremely professional company and very dedicated to their clients! Their work was impeccable and I was very pleased with their services!
The work they did on our house was fantastic. The crew was efficient with their time and courteous with coming in and out of our home. I will recommend them to all my friends and family! Honest and great people to work with.
Best service ever! They take care of every detail! Always on time, everything came up as I wanted. Thank you!
The absolute best! Would definitely recommend 100%!!
They are the best! Everything was perfect. Super responsible, reliable and always on time. I recommend them 100%.
Google Business Profile rating recorded September 14, 2026. Read them on Google.
Before you hire anyone
Often, but it depends on the walls and footings. Many older houses need some reinforcement first. We check before you pay for full drawings.
Plan on it. The Village has a Planning and Design Review step for part of the exterior work, and a second floor changes the exterior a lot. Check with the Village on what applies; we put the review on the schedule.
We plan the framing, roofing and any lift around them. If a branch or tree has to come out, check with the Village before it is cut.
Sometimes, depending on how much of the roof is open and where the stair goes. We tell you honestly at the visit.
Yes. FF Builders is a Florida Certified General Contractor, licensed and insured.
More in Biscayne Park
FF Builders is a Florida Certified General Contractor working across Biscayne Park, on the Village's older houses under the canopy. Kitchens, baths, additions, windows and structural work are the same company, with one person answering the phone from the first visit to the final inspection.
Second story additions · General contractor in Biscayne Park · Home remodeling in Biscayne Park · Home additions in Biscayne Park · Primary suite additions in Biscayne Park · Framing in Biscayne Park · Second story additions in Miami Shores
Free in-home visit
Tell us roughly what you're thinking. We come out, measure, and leave you with a real number. No obligation, and no decision required before you book.
We got your request and will call to set the visit during business hours (Mon–Fri, 8am–6pm ET).