We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.

In a tall hotel on the beach, the bathrooms sit one on top of another, floor after floor, on the same drain lines. A leak in one of them is a problem in every room below it. We build and test for that, and put it in writing within 24 hours of the walk.
We got your request and will call to set the visit (Mon–Fri, 8am–6pm ET).
How it works
Hotel bathrooms in a building this tall are usually stacked in vertical lines, with each line sharing the drain and supply pipes that run down through the slabs. That changes how the job is planned. The walk looks at one typical bathroom per line, the condition of the pipes where we can see them, and which lines can come out of service together.
What we renovate in Sunny Isles Beach hotel bathrooms
The original tub out, a curbless or low curb shower in, drained to the existing line.
Membrane on the floor and walls, water held and checked before any tile.
Large format tile with fewer grout lines, faster to clean between guests.
Vanities, mirrors, faucets and lighting with finishes chosen for salt air.
Roll-in showers, grab bars and clearances in the rooms you designate.
Old branch lines replaced while the walls and floor are open.

What changes in Sunny Isles Beach
On the ocean side of Collins Avenue, hotel buildings from the 1960s to the 1980s stand next to much newer, much taller towers. In an older building, the drain lines under the tub are often original, and the tub itself is set into a recess in the concrete slab. Pulling it out shows what the last decades have done to the pipe and the slab. In a newer building the pipes are recent, but the finishes are expensive and the rooms below are occupied, so the same rule applies: nothing gets covered until it is proven dry.
That is why every shower we build gets a membrane on the floor and up the walls, and then a flood test: the pan is filled, the water level marked, and it sits while we check the line and the ceiling of the room below. Only then does the tile go down. We do it on the mock-up bathroom first, and then on every bathroom in the line, with photos you can keep in the property file.
The work moves with the stacks. When a line has to be shut off, we plan it with your engineering team and close those rooms together, so the rest of the floor keeps selling. Material comes up the service elevator and the debris goes down the same way, on the hours the building sets. On the ocean face, the bathroom often shares a wall with the balcony, and salt reaches the fixtures faster than in a building inland, so faucets, accessories and lighting are chosen to hold their finish.
What's in the price
Demolition, pipes, waterproofing, tile, glass and fixtures are one company and one schedule, with each bathroom tested and documented before it is closed.
What separates hotel bathroom contractors here
A leak from a renovated bathroom in a tall building does not stay in one room. It shows up on a ceiling below, in a room that was not part of the job, often days later. The test is the difference between a closed bathroom and a closed floor.
Homeowners
We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.
Extremely professional company and very dedicated to their clients! Their work was impeccable and I was very pleased with their services!
The work they did on our house was fantastic. The crew was efficient with their time and courteous with coming in and out of our home. I will recommend them to all my friends and family! Honest and great people to work with.
Best service ever! They take care of every detail! Always on time, everything came up as I wanted. Thank you!
The absolute best! Would definitely recommend 100%!!
They are the best! Everything was perfect. Super responsible, reliable and always on time. I recommend them 100%.
Google Business Profile rating recorded September 14, 2026. Read them on Google.
Before you hire anyone
Yes. We work by bathroom line, closing the rooms on that line together, with loud work in the middle of the day and quiet evenings.
Membrane on the floor and walls, then a flood test before any tile, with the line and the ceiling below checked. We photograph each test.
Usually yes. The drain position is fixed by the slab, so the shower is designed around it. We confirm it on the mock-up bathroom before the rest of the floor.
The branch lines inside the bathroom, yes, while everything is open. Work on the main risers is planned with your engineering team and priced on its own.
Yes. Roll-in showers, grab bars and clearances go into the rooms you designate, in the same phase.
Yes. FF Builders is a Florida Certified General Contractor, licensed and insured, with the certificates your management company asks for.
More in Sunny Isles Beach
FF Builders is a Florida Certified General Contractor working across Sunny Isles Beach, from the towers on Collins Avenue to the homes in Golden Shores. Kitchens, baths, floors, impact glass and concrete repair are the same company, with one person answering the phone from the first visit to the final inspection.
Hotel bathroom renovation · General contractor in Sunny Isles Beach · Hotel renovation in Sunny Isles Beach · Shower waterproofing in Sunny Isles Beach · Walk-in showers in Sunny Isles Beach · Hotel bathroom renovation in Bal Harbour · Hotel bathroom renovation in Surfside · Hotel bathroom renovation in Bay Harbor Islands · Hotel bathroom renovation in Aventura
Free in-home visit
Tell us roughly what you're thinking. We come out, measure, and leave you with a real number. No obligation, and no decision required before you book.
We got your request and will call to set the visit during business hours (Mon–Fri, 8am–6pm ET).