We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.

Guests judge a room by its bathroom. We convert tubs to walk-in showers and rebuild hotel bathrooms in series, waterproofed so they do not leak into the room below.
We got your request and will call to set the visit (Mon–Fri, 8am–6pm ET).
How it works
Hotel bathrooms repeat. The visit studies each bathroom type, the drain positions and the floor below, so the same detail can be built quickly and identically in every room.
What we rebuild
Old tubs out, low-curb or curbless walk-in showers in.
A membrane flood tested before tile, so nothing reaches the room below.
Large format porcelain that cleans easily and lasts.
Durable vanities with stone or quartz tops.
Frameless glass and fixtures chosen for constant use.
Accessible bathrooms built where the property needs them.

Why hotel bathrooms are different
In a hotel, a shower that leaks takes two rooms off the market: the one with the leak and the one below it. That is why every bathroom we build has a continuous membrane on the floor and the walls, flood tested before tile goes in.
Tub to shower conversions are the most requested upgrade. Guests prefer a walk-in shower, housekeeping cleans it faster, and it removes the most common slip hazard in the room. The drain, the slope and the curb are designed once per room type and then repeated.
Materials are chosen for daily cleaning with commercial products: porcelain instead of porous stone, solid surface or quartz tops, hardware that does not pit. In Miami Beach properties, humidity and salt air are part of that specification.
The work moves floor by floor with the hotel open. Demolition is scheduled for the middle of the day, debris leaves through service routes, and each bathroom is inspected before the room goes back on sale.
What's in the price
Every layer named, so you can compare bids honestly.
The part that separates hotel bathroom contractors
A fast tub-to-shower conversion without a tested membrane looks fine for a season. Then the ceilings below start to stain, one room at a time.
Homeowners
We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.
Extremely professional company and very dedicated to their clients! Their work was impeccable and I was very pleased with their services!
The work they did on our house was fantastic. The crew was efficient with their time and courteous with coming in and out of our home. I will recommend them to all my friends and family! Honest and great people to work with.
Best service ever! They take care of every detail! Always on time, everything came up as I wanted. Thank you!
The absolute best! Would definitely recommend 100%!!
They are the best! Everything was perfect. Super responsible, reliable and always on time. I recommend them 100%.
Google Business Profile rating recorded September 14, 2026. Read them on Google.
Before you build
For most hotels, yes. Guests increasingly prefer a walk-in shower, it is the most common place for slips, and housekeeping cleans a shower faster than a tub. The conversion is also the moment to fix what is under the tub: old drains, worn pans and patched tile that are often leaking quietly into the room below.
A curbless shower is the most open and the easiest for guests with limited mobility, but it requires the floor to be recessed or built up so water slopes to the drain. In concrete hotel buildings that is a structural question. A low curb keeps the slab intact and is often the better answer for typical rooms, with curbless showers reserved for accessible rooms.
Large-format porcelain on floors and walls, fewer grout lines, quartz or solid surface vanity tops, and fixtures with replaceable cartridges. Natural stone looks beautiful but needs sealing and care that housekeeping rarely has time for. The specification is written for daily cleaning with commercial products.
It depends on the scope and how many rooms are released together. Working in blocks lets the crew move demolition, waterproofing, tile and finish through several rooms in sequence, so each trade is always working. The estimate gives you days per bathroom type and per floor.
Accessible rooms are built with roll-in showers, grab bars on reinforced walls, roll-under vanities and the clearances the room type requires. They are planned with the rest of the floor, so they are not an afterthought.
Most problems come from waterproofing done in a hurry. A shower that looks perfect can leak into the room below months later if the membrane was not continuous at the curb, the drain and the corners. We test every shower pan before tile goes on, and nothing is covered until it passes.
The other common failure is ventilation. A new bathroom with a weak or noisy exhaust fan grows mold in grout and caulk within a season in Miami humidity. We size and replace exhaust as part of the scope, not as an afterthought.
Large format porcelain on walls means fewer grout lines, which means less cleaning and a cleaner look for housekeeping. On the shower floor, smaller tile or a textured finish gives better grip and follows the slope to the drain. Many hotels combine both: large panels on the walls, smaller tile underfoot.
Whatever the choice, we lock it in the mock-up room. Housekeeping cleans it for a few days before ownership approves, because they know better than anyone what will hold up.
Hotel bathrooms usually stack on shared risers, so a valve replaced on one floor can mean water off for a whole column of rooms. We map the risers during the walk, schedule shutdowns with engineering, and group rooms so each shutdown affects only rooms already offline.
When old shut-off valves fail to close, which is common in older buildings, we plan the replacement before demolition starts so guests on other floors never lose water unexpectedly.
Floating vanities make the floor easier to clean and the room look larger, which is why most brands favor them. They need solid blocking inside the wall, which we add while the wall is open. Floor-mounted vanities hide plumbing and offer more storage, and they suit older bathrooms where the wall cannot be opened.
In both cases, we specify materials that handle constant moisture, such as solid surface or quartz tops and moisture resistant cabinet boxes, because a vanity in a hotel is wiped down every single day.
Before you hire anyone
Yes, a block of rooms at a time, with work hours and routes planned around guests.
It depends on the scope and the rooms released. The estimate gives a schedule per floor.
Not when the membrane is continuous and flood tested, which is how every shower we build is done.
Yes, in the rooms where the property needs them.
Yes. Permits are pulled, inspected and closed as part of the job.
Yes. Each bathroom type is built to the approved mock-up, so every room matches.
Yes, when the shower and the waterproofing are sound. We check before recommending a full rebuild.
Yes. FF Builders is a Florida Certified General Contractor, licensed and insured.
One contractor
FF Builders is a Florida Certified General Contractor working across Miami-Dade and Broward. Design, structure, systems and finishes are one company, one contract and one person on the phone from the first visit to the final inspection.
Hotel renovation · Walk-in showers · Shower waterproofing · Bathroom remodeling
Free in-home visit
Tell us roughly what you're thinking. We come out, measure, and leave you with a real number. No obligation, and no decision required before you book.
We got your request and will call to set the visit during business hours (Mon–Fri, 8am–6pm ET).