Rooms out of service are revenue lost. We renovate hotels in phases, floor by floor, so the property keeps selling rooms while the work moves through it.
We got your request and will call to set the visit (Mon–Fri, 8am–6pm ET).
How it works
A hotel renovation is scheduled backward from the booking calendar. Before we price anything, we walk the property with your operations team and map which floors can come offline, when, and for how long.
What we renovate
Floors, walls, ceilings, millwork, lighting and paint, room by room, to a repeatable standard.
Tubs converted to walk-in showers, new tile, vanities and glass.
Wall covering, flooring, lighting and new room entry doors, floor by floor.
The first impression rebuilt with the hotel still checking guests in.
Pool restrooms, fitness rooms, meeting rooms and breakfast areas.
Concrete repair, waterproofing and paint on the facade guests see first.

How the work moves through a hotel
Most of our hotel work is phased by floor. A block of rooms comes out of inventory, the crew renovates it in a fixed number of days, the rooms go back on sale, and the next block comes out. The schedule is built so the hotel always knows exactly how many rooms it can sell on any given night.
Guests are never the ones who notice. Work hours are set around check-in and check-out, noisy work happens in the middle of the day, corridors are protected with runners and dust barriers, and materials move through service elevators and back corridors, not the lobby.
Repetition is what makes a hotel renovation fast and consistent. Once the mock-up room is approved, every room of that type is built the same way, with the same details, the same materials and the same punch list. That is how room 812 ends up identical to room 214.
In Miami and on the beach, salt air, humidity and heavy use set the specification. Finishes, hardware and bathroom details are chosen to survive housekeeping every day, not just to look good on opening day.
What's in the price
In a hotel, the logistics are half the job. They are in the price.
The part that separates hotel contractors
The cost of a hotel renovation is not only the construction. It is every night a room cannot be sold. The contractor who holds the floor schedule is the cheap one, whatever the bid said.
Homeowners
We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.
Extremely professional company and very dedicated to their clients! Their work was impeccable and I was very pleased with their services!
The work they did on our house was fantastic. The crew was efficient with their time and courteous with coming in and out of our home. I will recommend them to all my friends and family! Honest and great people to work with.
Best service ever! They take care of every detail! Always on time, everything came up as I wanted. Thank you!
The absolute best! Would definitely recommend 100%!!
They are the best! Everything was perfect. Super responsible, reliable and always on time. I recommend them 100%.
Google Business Profile rating recorded September 14, 2026. Read them on Google.
Before you build
Scope per room type is the first driver: a soft refresh of paint, carpet and lighting is a different project from a full room with new bathrooms and millwork. The second is how many rooms can come offline at once, because a longer schedule means more mobilizations. The third is the building itself: older Miami Beach properties often hide concrete and plumbing repairs that are only found once rooms are opened.
That is why we price per room type and per floor, with a separate line for what depends on demolition, so ownership can see exactly where the money goes.
A soft renovation replaces what guests see without moving walls or plumbing: flooring, wall covering, paint, lighting, furniture walls and window treatments. A hard renovation goes further: bathrooms, layouts, ceilings and building systems. Many properties alternate, a soft refresh every few years and a hard renovation once per cycle. We help you decide which one the property actually needs.
Noisy work is scheduled for the middle of the day, after check-out and before check-in. Corridors under construction are closed with dust barriers, materials move through service elevators and back of house, and debris never crosses the lobby. Housekeeping and the front desk receive the weekly plan so no guest is assigned a room next to a demolition day.
Because it is the cheapest place to find problems. One room is finished completely, with every finish, fixture and detail, and ownership, the brand and the designer walk it. Changes are made there, once, instead of in fifty rooms. After approval, every room of that type is built to the mock-up.
Salt air and humidity shorten the life of hardware, finishes and anything metal. On Miami Beach and the waterfront, specifications favor porcelain, solid surfaces, stainless and coated hardware, and the exterior work, balconies, railings and facade, usually needs concrete repair before it is painted or waterproofed.
We start from the booking calendar, not from the top floor. Ownership tells us which months run full and which run soft, and the heaviest floors are scheduled into the soft months. Each phase closes a block of rooms that shares the same risers and corridor, so plumbing and electrical shutdowns affect only rooms already offline.
Before a floor goes back to the front desk, it is cleaned, punched and walked with housekeeping. Rooms return in batches the hotel can actually sell, not one at a time with dust still in the corridor.
Experience working inside an operating building matters more than size. Ask how the contractor protects corridors, moves debris, controls noise windows and reports progress to management. Ask to see how a mock-up room was handled on a past job and how punch lists were closed.
Then look at the paperwork: a Certified General Contractor license, insurance certificates the management company accepts, and an estimate broken down by room type. A single price for the whole hotel hides where the risk is.
Before you hire anyone
Yes. We renovate in phases, a floor or a block of rooms at a time, with work hours and routes planned around guests.
It depends on the scope. The estimate gives you days per room type and per floor, so revenue can be planned.
Yes. One room is finished and approved before the rest, so everyone signs off on the same standard.
Yes. We build to your designer's drawings and the brand's specifications.
Yes. Permits are pulled, inspected and closed as part of the job.
Yes. Many owners renovate a few floors per season. We plan the phases so finishes stay consistent from the first floor to the last.
Yes. We build to brand specifications and provide the certificates and documentation management companies require.
Yes. FF Builders is a Florida Certified General Contractor, licensed and insured, and we provide the certificates your management company asks for.
One contractor
FF Builders is a Florida Certified General Contractor working across Miami-Dade and Broward. Design, structure, systems and finishes are one company, one contract and one person on the phone from the first visit to the final inspection.
Hotel bathroom renovation · Condo renovation · Commercial painting · Balcony waterproofing
Free in-home visit
Tell us roughly what you're thinking. We come out, measure, and leave you with a real number. No obligation, and no decision required before you book.
We got your request and will call to set the visit during business hours (Mon–Fri, 8am–6pm ET).