FF BuildersFF Builders
Interior opened to the studs after selective demolition
Bal Harbour · Condo towers & retail · Controlled

Interior demolition
in Bal Harbour.

Demolition inside a Bal Harbour tower happens above other people's homes. We take a unit back to the shell without touching the structure, and price it in writing within 24 hours.

Google5.0★★★★★Licensed & insuredPermits includedWritten estimate

Book your in-home visit

Free, no obligation. You don't need to have it all figured out before booking.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

5.0 ★★★★★ on GoogleLicensed Florida GCInsured every jobFirm written price

How it works

What stays matters more than what goes.

Taking a condo back to the shell is the first step of most big renovations in the towers on Collins Avenue. The hard part is not removing the kitchen. It is knowing which walls, pipes and slabs belong to the building, keeping the dust out of the corridor, getting the debris down without blocking the elevator for everyone else, and making sure the unit below never feels a hammer. The visit is about the boundaries.

  1. You reach outForm or call. We call back to book a free visit, evenings and Saturdays included.
  2. We map what stays and what goesWalls, ceilings and floors, building risers and shared pipes, the slab, the association's rules and the elevator schedule.
  3. You get the estimate in writing, within 24 hoursProtection, demolition, debris removal, elevator time, association package and the permit, item by item.
  4. You decideRead it, compare it, call when you are ready. Nothing starts before you sign.

What we demolish in Bal Harbour

Down to the shell, nothing more.

Kitchen or bath tear-out

One room taken out cleanly for its remodel.

Full gut

A whole unit taken to the shell for a new layout.

Commercial strip-out

A retail space cleared between tenants, on the center's hours.

Flooring removal

Old tile and stone taken up without damaging the slab.

Soundproof floors after demo

The new floor isolated before anything goes on it.

Association approval

The paperwork the building asks for, prepared.

Interior framing exposed after demolition in a home under renovation

What changes in Bal Harbour

After Surfside,
boards watch the slab.

Since the collapse in Surfside in 2021, a short drive from here, associations along Collins Avenue look at any work near the structure with much more care, and milestone inspections and concrete repairs have become part of life in these towers. For demolition that means the plan says exactly what is removed, the building's engineer may review it, and nothing is cut into a column, a beam or the slab. Tile comes off the concrete with tools chosen not to damage it, and any crack found under the old floor is photographed and reported to the building before anything covers it.

The noise and the dust are the other half. Jackhammers on a slab carry into every unit around it, so the loud work goes into the hours the association allows and the neighbors are told in advance. The corridor and the elevator are protected, the unit is sealed with negative air so the dust stays inside, and debris goes down in closed carts during the reserved elevator time, never through the lobby.

The same discipline applies to the luxury shopping center and the hotels in the Village. A store strip-out happens at night or on a closed day, behind a barrier that customers never see past, with dust and noise kept away from the open shops next door. The space is handed over clean and ready for the new build-out.

What's in the price

The demolition,
protection to clean shell.

One contract. Protection, demolition, debris and the building's paperwork are the same company.

  • Association package — scope of removal, schedule and the certificate of insurance
  • Protection — corridor, elevator and unit sealed, negative air
  • Selective demolition — only what the plan says, structure untouched
  • Debris removal — closed carts in the reserved elevator time
  • Condition report — photos of the slab and anything found under the old finishes
  • Permit and inspections — pulled with the Village where required

The part that separates demolition crews here

The neighbors
never see the debris.

A demolition crew that tracks dust down the corridor or blocks the elevator at the wrong hour turns the whole building against your renovation on day one.

Homeowners

Rated 5.0 on Google.

5.0
★★★★★
Google rating · every review, five stars
Google
K Kelsey BarbosaGoogle review Google
★★★★★

We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.

S Sasha AbouGoogle review Google
★★★★★

Extremely professional company and very dedicated to their clients! Their work was impeccable and I was very pleased with their services!

G Gabriel BarbosaGoogle review Google
★★★★★

The work they did on our house was fantastic. The crew was efficient with their time and courteous with coming in and out of our home. I will recommend them to all my friends and family! Honest and great people to work with.

S sara bouGoogle review · Local Guide Google
★★★★★

Best service ever! They take care of every detail! Always on time, everything came up as I wanted. Thank you!

D deborah medel-gimenezGoogle review Google
★★★★★

The absolute best! Would definitely recommend 100%!!

M Monica BecharaGoogle review · Local Guide Google
★★★★★

They are the best! Everything was perfect. Super responsible, reliable and always on time. I recommend them 100%.

Google Business Profile rating recorded September 14, 2026. Read them on Google.

Before you hire anyone

The ones people actually ask.

Can you gut my condo down to the shell?

Yes, with the association's approval. The plan says exactly what comes out, and the building's structure stays untouched.

How do you keep dust and noise from bothering the neighbors?

The unit is sealed with negative air, the corridor and elevator are protected, and the loud work goes in the hours the association allows.

What if you find damage under the old floor?

We photograph it and report it to you and the building before anything covers it.

Do you do commercial strip-outs?

Yes. In retail and hospitality spaces we work on the property's hours, behind a barrier, and hand the space over clean.

How much does interior demolition cost?

It depends on the scope and the building's logistics. You get the price in writing within 24 hours of the visit.

Are you licensed and insured?

Yes. FF Builders is a Florida Certified General Contractor, licensed and insured.

More in Bal Harbour

One contractor, unit or house.

FF Builders is a Florida Certified General Contractor working across Bal Harbour, from oceanfront condo units on Collins Avenue to the homes on the bay. Kitchens, baths, floors, windows and concrete repair are the same company, with one person answering the phone from the first visit to the final inspection.

Interior demolition · General contractor in Bal Harbour · Condo renovation in Bal Harbour · Condo renovation approval in Bal Harbour · Retail store build-outs in Bal Harbour · Interior demolition in Surfside · Interior demolition in Bay Harbor Islands · Interior demolition in Miami Beach

Free in-home visit

A clean shell, and a building still on your side.

Tell us roughly what you're thinking. We come out, measure, and leave you with a real number. No obligation, and no decision required before you book.

  • A firm written price — material, labor, removal and haul-away.
  • Licensed & insured Florida crews — on every single job.
  • We call you back fast — during business hours, same or next day.

Book your in-home visit

Free, no obligation. Decide after you see the numbers.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

Mon–Fri, 8am–6pm ET · Serving Miami-Dade & Broward.