FF BuildersFF Builders
Interior opened down to the studs during a controlled demolition
Surfside · Condos & Harding Avenue · Controlled

Interior demolition
in Surfside.

In a Surfside condo, demolition stops at the concrete. On Harding Avenue, it stops at the sidewalk. We plan both, and price it in writing within 24 hours.

Google5.0★★★★★Licensed & insuredPermits includedWritten estimate

Book your in-home visit

Free, no obligation. You don't need to have it all figured out before booking.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

5.0 ★★★★★ on GoogleLicensed Florida GCInsured every jobFirm written price

How it works

Demolition that knows where to stop.

Interior demolition in Surfside happens in two very different places. In the condos along Collins Avenue, a unit is opened for a kitchen, a bath or a full gut, in a building with neighbors on every side. On Harding Avenue, an older storefront is stripped for a new tenant, with a sidewalk in front and almost no place to park a truck. The visit starts with the building, the rules and what has to come out.

  1. You reach outForm or call. We call back to book a free visit, evenings and Saturdays included.
  2. We look at the space and the buildingWhat comes out, what stays, the structure, the association or landlord's rules, debris route and access.
  3. You get the estimate in writing, within 24 hoursProtection, tear-out, debris removal, capping of utilities, association or landlord package and the permit, item by item.
  4. You decideRead it, compare it, call when you are ready. Nothing starts before you sign.

What we build in Surfside

A clean shell, ready for what comes next.

Kitchen or bath tear-out

Cabinets, tile and fixtures out, utilities capped.

Full gut

A condo unit or house taken back to the shell.

Commercial strip-out

A Harding Avenue space cleared for a new tenant.

Condo renovation

The rebuild that follows the tear-out.

Association approval

The package the building asks for before work starts.

Commercial build-out

The new space built after the strip-out.

Interior walls removed down to the studs with debris cleared

What changes in Surfside

Stop at the slab,
stop at the sidewalk.

In June 2021 a condominium building in Surfside collapsed and people lost their lives. Since then, Florida requires milestone inspections and structural reserves for condo buildings, and associations here look at any work near the concrete with real care. For interior demolition that means a clear line: finishes, partitions, cabinets and fixtures come out; slabs, columns, beams and balcony structure are not touched. If the tear-out reveals something in the concrete, we stop, document it and the association's engineer looks at it before anything continues.

Inside the building, the tear-out is planned so the neighbors notice as little as possible. Corridors and the service elevator are protected, debris goes down in covered carts during the building's work hours, dust is controlled at the door of the unit, and water and gas are shut and capped with the building's maintenance. The association usually wants the scope, the schedule and a certificate of insurance first; we prepare that.

On Harding Avenue the challenge is the street. The buildings are low and older, often sharing walls with the shop next door, with tenants open for business on both sides. Debris leaves through the back where there is a back, at hours that do not block the sidewalk, and the strip-out stops at the shared walls and the storefront structure. Hidden conditions behind old finishes are documented with photos for the owner and the next tenant's designer.

What's in the price

The tear-out,
from protection to sweep.

One contract, one contact, and a shell left clean for the next trade.

  • Building package — scope, schedule and insurance for the association or landlord
  • Protection — corridors, elevator, storefront and neighbors
  • Tear-out — finishes, partitions and fixtures, structure left alone
  • Utilities — water, gas and power shut and capped
  • Debris removal — covered, on schedule, hauled away
  • Permit and documentation — pulled with the Town of Surfside, conditions photographed

The part that separates demolition crews here

What we do not touch
matters most.

Demolition is fast. Knowing exactly where to stop, and stopping when something looks wrong, is what associations and landlords here expect.

Homeowners

Rated 5.0 on Google.

5.0
★★★★★
Google rating · every review, five stars
Google
K Kelsey BarbosaGoogle review Google
★★★★★

We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.

S Sasha AbouGoogle review Google
★★★★★

Extremely professional company and very dedicated to their clients! Their work was impeccable and I was very pleased with their services!

G Gabriel BarbosaGoogle review Google
★★★★★

The work they did on our house was fantastic. The crew was efficient with their time and courteous with coming in and out of our home. I will recommend them to all my friends and family! Honest and great people to work with.

S sara bouGoogle review · Local Guide Google
★★★★★

Best service ever! They take care of every detail! Always on time, everything came up as I wanted. Thank you!

D deborah medel-gimenezGoogle review Google
★★★★★

The absolute best! Would definitely recommend 100%!!

M Monica BecharaGoogle review · Local Guide Google
★★★★★

They are the best! Everything was perfect. Super responsible, reliable and always on time. I recommend them 100%.

Google Business Profile rating recorded September 14, 2026. Read them on Google.

Before you hire anyone

The ones people actually ask.

Do I need association approval to demolish inside my unit?

In almost every Surfside building, yes. We prepare the scope, schedule and insurance the association asks for.

What happens if you find damaged concrete?

We stop, document it, and the association's engineer reviews it before any work continues.

Can you strip out a storefront on Harding Avenue?

Yes. We plan debris removal and hours around the street and the neighboring businesses.

Do I need a permit for interior demolition in Surfside?

In most cases, yes. We pull it with the Town of Surfside and close it.

How much does interior demolition cost?

It depends on the size, what comes out and the access. You get the price in writing within 24 hours of the visit.

Are you licensed and insured?

Yes. FF Builders is a Florida Certified General Contractor, licensed and insured.

More in Surfside

One contractor, condo or house.

FF Builders is a Florida Certified General Contractor working across Surfside, from the condos on Collins Avenue to the homes west of Harding Avenue. Kitchens, baths, floors, windows and concrete repair are the same company, with one person answering the phone from the first visit to the final inspection.

Interior demolition · General contractor in Surfside · Condo renovation in Surfside · Whole-house gut renovation in Surfside · Retail store build-outs in Surfside · Interior demolition in Bal Harbour · Interior demolition in Bay Harbor Islands · Interior demolition in Miami Beach · Interior demolition in Indian Creek

Free in-home visit

A clean start, nothing more.

Tell us roughly what you're thinking. We come out, measure, and leave you with a real number. No obligation, and no decision required before you book.

  • A firm written price — material, labor, removal and haul-away.
  • Licensed & insured Florida crews — on every single job.
  • We call you back fast — during business hours, same or next day.

Book your in-home visit

Free, no obligation. Decide after you see the numbers.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

Mon–Fri, 8am–6pm ET · Serving Miami-Dade & Broward.