FF BuildersFF Builders
Primary bathroom with a walk-in glass shower and stone finishes
Biscayne Park · Bedroom, bath, closet · Licensed GC

Primary suite additions
in Biscayne Park.

A lot of Biscayne Park families have been in the same house for a long time and would rather grow it than leave the village. A primary suite is usually the room the house never had. We plan where it goes from what is under the yard and behind the walls.

Google5.0★★★★★Licensed & insuredPermits includedWritten estimate

Book your in-home visit

Free, no obligation. You don't need to have it all figured out before booking.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

5.0 ★★★★★ on GoogleLicensed Florida GCInsured every jobFirm written price

How it works

The bathroom decides where the suite goes.

The bedroom can go almost anywhere. The bath cannot. In an older house, the new shower and toilet have to drain into lines that may be decades old, and on a lot that is on septic, the tank and its field take up yard you might have pictured the addition sitting on. We look at all of it at the first visit, so the drawing starts in the right place.

  1. You reach outForm or call. We call back to book a free visit, evenings and Saturdays included.
  2. We look at the house and the yardWhere the plumbing runs, whether the lot is on septic or sewer, the trees and roots near the house, and which wall the suite could open from.
  3. You get the estimate in writing, within 24 hoursWith the addition, the bath, any plumbing upgrades and what depends on the drawings listed separately.
  4. You decideRead it, compare it, call when you are ready. Nothing starts before you sign.

What goes into it

Bedroom, bath and closet, built as one.

The addition

Foundation, block walls and roof tied into the original house.

Primary bathroom

Shower, vanity, tile and fixtures connected to plumbing that can take them.

Walk-in shower

A curbless or low-curb shower waterproofed before any tile goes on.

Walk-in closet

Built-in storage designed with the room, not added later.

Impact windows and doors

Openings to the yard that meet the wind code.

Concrete block walls and framing for a new home addition

What changes in Biscayne Park

Growing the house
you already love.

Houses here were built from the 1930s to the 1950s, when a main bedroom with a closet and a small bath down the hall was normal. Families who have lived on the same street for years usually want the same thing: a real bedroom suite, without giving up the neighbors, the shade and the walk they know. Adding on is how they get it.

Some homes in the village are on septic, and that matters more for a suite than for almost any other addition, because a new bath adds water to the system. The plan and the permit take the septic situation into account, and the suite is placed where it keeps clear of the tank and its field. On homes on sewer, the question is the age of the drain lines under the slab, which often need work once a new bath ties in.

The yard brings its own limits. Big trees near the house have roots running toward the footings, and the neighbors are close on both sides, so the suite often grows toward the back or turns an existing room into part of it. A ground-floor suite is the common answer here; when the yard is tight, a suite on a new upper floor is worth pricing too. Part of the exterior work goes through the Village's Planning and Design Review, which we put on the schedule.

What's in the price

One suite,
one contract.

Addition, bath, closet and finishes on one schedule, with one person to call.

  • Site and plumbing check — septic or sewer, drain lines and roots understood before design
  • Structure — foundation, walls and roof tied into the original house
  • Waterproofed bath — shower pan and walls sealed before tile
  • Design Review on the schedule — exterior changes planned into the dates
  • Permits and inspections — pulled and passed through the Village, up to the final

What separates builders here

A suite in the wrong spot
costs you the yard.

Drawing the suite first and checking the plumbing later is how additions end up redesigned. We start with what is underground.

Homeowners

Rated 5.0 on Google.

5.0
★★★★★
Google rating · every review, five stars
Google
K Kelsey BarbosaGoogle review Google
★★★★★

We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.

S Sasha AbouGoogle review Google
★★★★★

Extremely professional company and very dedicated to their clients! Their work was impeccable and I was very pleased with their services!

G Gabriel BarbosaGoogle review Google
★★★★★

The work they did on our house was fantastic. The crew was efficient with their time and courteous with coming in and out of our home. I will recommend them to all my friends and family! Honest and great people to work with.

S sara bouGoogle review · Local Guide Google
★★★★★

Best service ever! They take care of every detail! Always on time, everything came up as I wanted. Thank you!

D deborah medel-gimenezGoogle review Google
★★★★★

The absolute best! Would definitely recommend 100%!!

M Monica BecharaGoogle review · Local Guide Google
★★★★★

They are the best! Everything was perfect. Super responsible, reliable and always on time. I recommend them 100%.

Google Business Profile rating recorded September 14, 2026. Read them on Google.

Before you hire anyone

The ones people actually ask.

My house is on septic. Can I still add a primary suite?

Usually, yes. Some homes in the village are on septic, and a new bath affects the system. The plan and the permit take that into account, and the suite is placed where it keeps clear of the tank and its field.

Can the old plumbing handle a new bathroom?

Sometimes. In houses this age, the drain lines under the slab are often old and need upgrading where the new bath ties in. We check before the estimate is final.

Ground floor or second floor?

Ground floor is the most common, but if the yard is tight or the trees are close, a second-floor suite can make more sense. We can price both.

Does the Village review the addition?

Part of the exterior work goes through the Village's Planning and Design Review. Check with the Village on what applies; we put it on the schedule.

Are you licensed and insured?

Yes. FF Builders is a Florida Certified General Contractor, licensed and insured.

More in Biscayne Park

One contractor for the whole house.

FF Builders is a Florida Certified General Contractor working across Biscayne Park, on the Village's older houses under the canopy. Kitchens, baths, additions, windows and structural work are the same company, with one person answering the phone from the first visit to the final inspection.

Primary suite additions · General contractor in Biscayne Park · Home remodeling in Biscayne Park · Home additions in Biscayne Park · Bathroom remodeling in Biscayne Park · Second story additions in Biscayne Park · Primary suite additions in Miami Shores

Free in-home visit

The suite your house never had.

Tell us roughly what you're thinking. We come out, measure, and leave you with a real number. No obligation, and no decision required before you book.

  • A firm written price — material, labor, removal and haul-away.
  • Licensed & insured Florida crews — on every single job.
  • We call you back fast — during business hours, same or next day.

Book your in-home visit

Free, no obligation. Decide after you see the numbers.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

Mon–Fri, 8am–6pm ET · Serving Miami-Dade & Broward.