FF BuildersFF Builders
Renovated classroom with a new floor, LED ceiling lights and a full whiteboard wall
Bay Harbor Islands · Classrooms over summer · Island families

Private school renovation
for Bay Harbor Islands.

Families on these islands choose a school they can reach without a long drive, and they notice when a classroom has not changed in years. We renovate it over the break, and price it in writing within 24 hours.

Google5.0★★★★★Licensed & insuredPermits includedWritten estimate

Book your in-home visit

Free, no obligation. You don't need to have it all figured out before booking.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

5.0 ★★★★★ on GoogleLicensed Florida GCInsured every jobFirm written price

How it works

The school year
sets the deadline.

Bay Harbor Islands is a family town in a way its neighbors are not. Children walk to school here, and parents compare the options on the islands and just across the causeway. A private school serving these families competes with that walk. When you renovate, the summer is the window and the first day of class is not negotiable. The visit starts with the calendar.

  1. You reach outForm or call. We call back to book a free visit, evenings and Saturdays included.
  2. We walk the classrooms with your calendarRooms, restrooms, corridors, ceilings and floors, the building's age, access for deliveries and the flood zone of the address.
  3. You get the estimate in writing, within 24 hoursRoom by room, with phases fitted to the breaks, the permit and a schedule that ends before classes.
  4. You decideRead it, compare it, call when you are ready. Nothing starts before you sign.

What we renovate for island schools

New rooms
by the first bell.

Classrooms

Floors, ceilings, lighting, walls and whiteboard walls.

Ceilings and lighting

New grid, panels and LED fixtures.

Restrooms

Fixtures, partitions and finishes, sized by age.

Offices and reception

A front office where parents are received.

Windows and doors

Impact-rated openings for a building near the bay.

Accessibility

Entrances, routes and restrooms brought up to what the inspection asks for.

Classroom stripped during summer break while a crew installs a new ceiling grid

What Bay Harbor Islands adds

A short window,
a bridge to cross.

A summer renovation is a race. Ceilings, floors, lighting and restrooms in several rooms have to be done, inspected and cleaned before teachers come back to set up. We plan it backward from the first day: materials ordered before school lets out, rooms done in a sequence, and inspections booked as each phase closes. When the work runs past the break, we close and protect the rooms still in progress and keep the noisy work out of class hours.

Working here adds a step most schools do not think about. Every delivery and every load of debris crosses a bridge and comes down narrow streets where parking is tight, and in summer the neighbors are home. We book deliveries and debris pickups ahead, sometimes with smaller trucks, so the job does not stall waiting for a dumpster. That is in the price from the estimate.

School buildings near the bay carry their age. Ceilings with old stains, windows that have seen many storms and floors laid over older floors. We look at all of it at the visit. If the property is in a flood zone, FEMA's 50% rule compares the cost of the work to the value of the building, and the renovation is planned with that in mind. The permit is pulled where the school is, through the Town if it is on the islands.

What's in the price

Ready for the
first day of class.

Finished means every inspection passed and every room clean before the teachers walk in.

  • Schedule to the calendar — planned backward from the first day
  • Materials ordered early — before school lets out
  • Classrooms finished — floors, ceilings, lighting and walls
  • Restrooms — fixtures and partitions sized by age
  • Island logistics — deliveries and debris booked ahead, priced in
  • Permits and inspections — pulled, inspected and closed

What separates school builders here

Late is not
an option.

A classroom that is not ready on the first day is a letter to every parent. On islands this small, the families talk about it before lunch.

Homeowners

Rated 5.0 on Google.

5.0
★★★★★
Google rating · every review, five stars
Google
K Kelsey BarbosaGoogle review Google
★★★★★

We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.

S Sasha AbouGoogle review Google
★★★★★

Extremely professional company and very dedicated to their clients! Their work was impeccable and I was very pleased with their services!

G Gabriel BarbosaGoogle review Google
★★★★★

The work they did on our house was fantastic. The crew was efficient with their time and courteous with coming in and out of our home. I will recommend them to all my friends and family! Honest and great people to work with.

S sara bouGoogle review · Local Guide Google
★★★★★

Best service ever! They take care of every detail! Always on time, everything came up as I wanted. Thank you!

D deborah medel-gimenezGoogle review Google
★★★★★

The absolute best! Would definitely recommend 100%!!

M Monica BecharaGoogle review · Local Guide Google
★★★★★

They are the best! Everything was perfect. Super responsible, reliable and always on time. I recommend them 100%.

Google Business Profile rating recorded September 14, 2026. Read them on Google.

Before you hire anyone

The ones people actually ask.

Can you finish over the summer break?

Most classroom and restroom renovations, yes, when materials are ordered before school ends and the work is planned in phases. We give you the schedule with the estimate.

What if the work runs into the school year?

We close and protect the rooms still in progress, keep children away from the work and move the noisy part outside class hours.

Who supplies the equipment?

Your supplier; we build the space ready for it. Desks, boards, screens and furniture come from your vendors, with power, data and backing in place.

Does the island affect the schedule?

It affects the planning. Deliveries and debris cross the bridge and use narrow streets, so we book them ahead and price that in the estimate.

How much does a school renovation cost?

It depends on the number of rooms, the condition of the building and the finishes. You get a written estimate within 24 hours of the visit.

Are you licensed and insured?

Yes. FF Builders is a Florida Certified General Contractor, licensed and insured.

More in Bay Harbor Islands

One contractor, apartment or house.

FF Builders is a Florida Certified General Contractor working across Bay Harbor Islands, from the mid-century apartment buildings on the east island to the homes on the water. Kitchens, baths, floors, windows and concrete repair are the same company, with one person answering the phone from the first visit to the final inspection.

Private school renovation · General contractor in Bay Harbor Islands · Daycare build-out in Bay Harbor Islands · ADA compliance upgrades in Bay Harbor Islands · Commercial impact windows in Bay Harbor Islands · Private school renovation in Bal Harbour · Private school renovation in Surfside · Private school renovation in Miami Beach

Free in-home visit

Classrooms the families of Bay Harbor Islands notice.

Tell us roughly what you're thinking. We come out, measure, and leave you with a real number. No obligation, and no decision required before you book.

  • A firm written price — material, labor, removal and haul-away.
  • Licensed & insured Florida crews — on every single job.
  • We call you back fast — during business hours, same or next day.

Book your in-home visit

Free, no obligation. Decide after you see the numbers.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

Mon–Fri, 8am–6pm ET · Serving Miami-Dade & Broward.