FF BuildersFF Builders
Renovated classroom with a new floor, LED ceiling lights and a full whiteboard wall
Surfside · Classrooms · Summer break

Private school renovation
in Surfside.

Surfside families send their children to schools close to home, often in buildings as old as the houses on the west side. We renovate them over the summer, plan for what the walls hide, and price it within 24 hours.

Google5.0★★★★★Licensed & insuredPermits includedWritten estimate

Book your in-home visit

Free, no obligation. You don't need to have it all figured out before booking.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

5.0 ★★★★★ on GoogleLicensed Florida GCInsured every jobFirm written price

How it works

Old buildings,
one summer to fix them.

Many of the houses west of Harding Avenue were built between the 1930s and the 1960s, and the schools that serve those families often date from the same years. A building that age is solid, but it hides things: old plumbing, wiring added in layers, windows that predate today's storm codes. The visit is about finding them now, not in July.

  1. You reach outForm or call. We call back to book a free visit, evenings and Saturdays included.
  2. We walk the classrooms, the restrooms and the envelopeCeilings, walls we can open, plumbing, windows, access for trucks and your school calendar.
  3. You get the estimate in writing, within 24 hoursRoom by room, with what we found, a summer schedule and the permit in the town or city where the school is.
  4. You decideRead it, compare it, call when you are ready. Nothing starts before you sign.

What we renovate

Classrooms renewed
while the halls are empty.

Classrooms

New floors, ceilings, lighting and whiteboard walls.

Restrooms

Fixtures, partitions and plumbing brought up to date.

Impact windows

Old windows replaced with impact-rated units.

Offices and reception

A secure front office and a place to meet parents.

Common areas

Halls, a library or a multipurpose room.

Painting

Interior and exterior, timed with the rest of the work.

Classroom stripped during summer break while a crew installs a new ceiling grid

What Surfside adds

A mid-century building
and a hard deadline.

A school renovation has one immovable date: the first day of classes. In an older building the risk to that date is what you cannot see. Pipes that crumble when touched, wiring that has to come out completely, a slab that needs patching under the old floor. We open ceilings and test walls during the school year, on weekends or after hours, so the summer schedule is built on what is really there.

Windows are a big part of it on this coast. Many older school buildings still rely on shutters or plywood when a storm comes in from the ocean, and hurricane season runs right through the summer break. When the plan includes new impact windows, we order them early, protect the open walls while we wait, and sequence the classrooms so the building is closed up again before the worst of the season.

Surfside families know the school, and the school sits among houses or close to them. We plan deliveries and noisy work for hours that respect the neighbors, keep the site closed and tidy, and keep the school's office informed through one contact. If a summer program uses part of the building, we phase the work around it.

What's in the price

Ready for
the first day of classes.

A renovation is finished when every room is open, the building is closed to the weather and the inspection is closed.

  • Investigation before summer — ceilings and walls opened ahead of time
  • Summer schedule — built backwards from the first day of classes
  • Window plan — impact units ordered early, openings protected
  • Restroom upgrades — fixtures, partitions and accessibility
  • Neighbor plan — deliveries and noisy work scheduled with care
  • Permits and inspections — pulled, inspected and closed

What separates school renovators here

Surprises belong
in the spring.

An older school that is only opened up in June turns every discovery into a delay. Finding the problems while classes are still running is what keeps the August date.

Homeowners

Rated 5.0 on Google.

5.0
★★★★★
Google rating · every review, five stars
Google
K Kelsey BarbosaGoogle review Google
★★★★★

We had a great experience using FF Builders. Their team communicated clearly throughout the length of our project. We never had to worry about a single detail. I would highly recommend using them for your project.

S Sasha AbouGoogle review Google
★★★★★

Extremely professional company and very dedicated to their clients! Their work was impeccable and I was very pleased with their services!

G Gabriel BarbosaGoogle review Google
★★★★★

The work they did on our house was fantastic. The crew was efficient with their time and courteous with coming in and out of our home. I will recommend them to all my friends and family! Honest and great people to work with.

S sara bouGoogle review · Local Guide Google
★★★★★

Best service ever! They take care of every detail! Always on time, everything came up as I wanted. Thank you!

D deborah medel-gimenezGoogle review Google
★★★★★

The absolute best! Would definitely recommend 100%!!

M Monica BecharaGoogle review · Local Guide Google
★★★★★

They are the best! Everything was perfect. Super responsible, reliable and always on time. I recommend them 100%.

Google Business Profile rating recorded September 14, 2026. Read them on Google.

Before you hire anyone

The ones people actually ask.

Can you finish the renovation over one summer?

It depends on the scope and what the building hides. That is why we investigate during the school year and build the schedule backwards from the first day of classes.

Our building has old windows. Can you replace them during the break?

Usually, yes. We order impact-rated units early, protect open walls while they arrive and close the building up before the worst of hurricane season.

Who supplies the equipment?

Your supplier; we build the space ready for it. Smart boards, furniture, kitchen appliances and technology come from your vendors, with power, data and backing in place.

Can you work while a summer program uses part of the building?

Often, yes. We phase the work around it and keep the work area closed off.

How much does a private school renovation cost?

It depends on the scope and the condition of the building. You get a written estimate within 24 hours of the visit.

Are you licensed and insured?

Yes. FF Builders is a Florida Certified General Contractor, licensed and insured.

More in Surfside

One contractor, condo or house.

FF Builders is a Florida Certified General Contractor working across Surfside, from the condos on Collins Avenue to the homes west of Harding Avenue. Kitchens, baths, floors, windows and concrete repair are the same company, with one person answering the phone from the first visit to the final inspection.

Private school renovation · General contractor in Surfside · Daycare build-out in Surfside · Commercial impact windows in Surfside · ADA compliance upgrades in Surfside · Private school renovation in Bal Harbour · Private school renovation in Bay Harbor Islands · Private school renovation in Miami Beach

Free in-home visit

Your school, ready for the first day.

Tell us roughly what you're thinking. We come out, measure, and leave you with a real number. No obligation, and no decision required before you book.

  • A firm written price — material, labor, removal and haul-away.
  • Licensed & insured Florida crews — on every single job.
  • We call you back fast — during business hours, same or next day.

Book your in-home visit

Free, no obligation. Decide after you see the numbers.

Or call now: (786) 744-6185

By submitting, you agree we may call, text or email you about this request. See our Privacy Policy.

Mon–Fri, 8am–6pm ET · Serving Miami-Dade & Broward.